Project File
Beale Infrastructure data center campus, Project Pilot (De Soto)
De Soto,Johnson County,KansasApprovedFirst public 2025Filing entity: Mount Sunflower Properties, LLCLast checked Nov 8, 2026
Beale InfrastructureDeveloper and operatorEvergyElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: Capacity
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Beale Infrastructure data center campus, Project Pilot (De Soto) is an approved data center project in De Soto, Johnson County, Kansas. Beale Infrastructure is named as operator. It was first public in 2025. No site capacity figure is published for this project.
Beale Infrastructure data center campus, Project Pilot (De Soto) is an approved data center project in De Soto, Johnson County, Kansas. Beale Infrastructure is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in De Soto, Johnson County, Kansas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Beale Infrastructure data center campus, Project Pilot (De Soto)Approved
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Kansas SB 98: Sales tax exemption for large Kansas data centers
The act covers qualified firms that invest at least $250 million in eligible data center costs in a qualified data center by the fifth year of operations and create and maintain at least 20 new jobs within two calendar years after operations begin; this project has no capacity figure on record, but the project's investment in eligible data center costs and the new jobs it created is not on record.
“A qualified firm that makes an investment in eligible data center costs in a qualified data center of at least $250,000,000 in the aggregate by the fifth year of operations and creates and maintains at least 20 new jobs at the qualified data center within two calendar years after the commencement of operations shall receive a sales tax exemption, as provided by K.S.A. 79-3606(xxxx), and amendments thereto, and section 3, and amendments thereto, for:” (New Section 2(a), enrolled text)
Rule checks: Project is in Kansas. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Kansas
- SB 400 · Died or failedClosed loop cooling required for large data centers
- SB 526 · Died or failedExemption only for data centers on industrial zoned land
- SB 531 · Died or failedNo new large data centers in drought emergency counties
- SB 98 · Signed into law · Apr 24, 2025Sales tax exemption for large Kansas data centers
- SB 51 · Died or failed · Mar 27, 2025Original data center sales tax exemption bill
Who's involved
- Developer and operatorBeale Infrastructure
- Electric utilityEvergy
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Decided · Nov 6, 2025Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)
Questions people ask
- Where is Beale Infrastructure data center campus, Project Pilot (De Soto)?
- Beale Infrastructure data center campus, Project Pilot (De Soto) is a data center project in De Soto, Johnson County, Kansas.
- Who operates Beale Infrastructure data center campus, Project Pilot (De Soto)?
- Beale Infrastructure is named as the operator of Beale Infrastructure data center campus, Project Pilot (De Soto).
- How big is Beale Infrastructure data center campus, Project Pilot (De Soto)?
- The site covers 290 acres.
- What stage is Beale Infrastructure data center campus, Project Pilot (De Soto)?
- Beale Infrastructure data center campus, Project Pilot (De Soto) is approved. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1News Release 11-6-25: KCC approves Large Load Power Service rate plan for Evergy
Kansas Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 2Sierra Club Supports KCC Approved Plan to Protect Customers
Sierra ClubTier 4 · Captured 2026-11-08 · Open the source - 3De Soto, Kansas, approves $700m data center
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 4Beale Infrastructure buys land parcel for 'Project Pilot' in De Soto, Kansas
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 5Beale Infrastructure unveils Project Pilot, De Soto (REBusinessOnline Kansas archive, item dated May 1, 2026)
REBusinessOnlineTier 3 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page