Project File

Dickerson Data Center Campus

Montgomery County,MarylandIn permittingFirst public 2024Filing entity: Atmosphere Data CentersLast checked Nov 8, 2026

Atmosphere Data CentersDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

3 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Dickerson Data Center Campus is a data center project in Montgomery County, Maryland. Atmosphere Data Centers is named as developer. It is in permitting. It was first public in 2024. No site capacity figure is published for this project.

Dickerson Data Center Campus is a data center project in Montgomery County, Maryland. Atmosphere Data Centers is named as developer. No site capacity figure is published for this project. 3 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Montgomery County, Maryland. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Dickerson Data Center Campus (Atmosphere Data Centers) in Montgomery County, Maryland, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Montgomery County, Maryland.See every project on the map

The land, to scale

One football field
110 acres, about 83 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Dickerson Data Center CampusIn permitting

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Maryland SB 116: Requires a state study of data center impacts

    The act covers data center development in Maryland, whose environmental, energy, and economic impacts state agencies must analyze; this project has no capacity figure on record, but any project-level condition; the act directs state agencies to conduct a study and sets no size, date, or facility condition a project record could establish is not on record.

    “Requiring the Department of the Environment, the Maryland Energy Administration, and the University of Maryland School of Business, in coordination with the Department of Legislative Services, to conduct an analysis of the likely environmental, energy, and economic impacts of data center development in the State” (mgaleg SB 116 page, Synopsis)

    Rule checks: Project is in Maryland. Still to check: who it covers: not checked

Bills and laws in Maryland

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Dickerson Data Center Campus?
    Dickerson Data Center Campus is a data center project in Montgomery County, Maryland.
    Who is developing Dickerson Data Center Campus?
    Atmosphere Data Centers is named as the developer of Dickerson Data Center Campus.
    How big is Dickerson Data Center Campus?
    The site covers 110 acres.
    What stage is Dickerson Data Center Campus?
    Dickerson Data Center Campus is in permitting. It was first public in 2024.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Data Center Project, Dickerson Data Center Campus
      Dickerson Data Center Campus (Atmosphere Data Centers project site)
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Atmosphere Data Centers (homepage)
      Atmosphere Data Centers
      Tier 4 · Captured 2026-11-08 · Open the source
    3. 3
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page