Project File
Atlas Power Butte Data Center
Butte-Silver Bow (balance),Silver Bow County,MontanaExpandingFirst public 2024Filing entity: Atlas Power GroupLast checked Nov 8, 2026
NorthWestern EnergyElectric utilityAtlas Power GroupOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Atlas Power Butte Data Center is an expanding data center project in Butte-Silver Bow (balance), Silver Bow County, Montana. Atlas Power Group is named as operator. It was first public in 2024. It was announced at 150 MW.
Atlas Power Butte Data Center is an expanding data center project in Butte-Silver Bow (balance), Silver Bow County, Montana. Atlas Power Group is named as operator. It was announced at 150 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Butte-Silver Bow (balance), Silver Bow County, Montana. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline
- · New projectFirst public record of Atlas Power Butte Data CenterExpanding
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Montana HB 424: Extends low property tax class for data centers and power plants
The act covers qualified data centers, facilities under single ownership on contiguous parcels that meet the act's building area and total cost floors, at least 300,000 square feet and $150 million, or 25,000 square feet of new or expanded area and $50 million invested in a 48-month period, with construction commencing after the stated dates; this project has 75 MW on record (grid connection), but the project's building area, total cost, and ownership structure is not on record.
“"Qualified data center" means the land, improvements, and personal property of a facility designed or modified to house networked computers or equipment supporting computing, networking, or data storage” (MCA 15-6-162(2)(a), as amended by the bill's authorized print version)
Rule checks: Project is in Montana. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Montana
- HB 877 · Died or failed · May 20, 2025Bars the utility commission from blocking service to large customers
- HB 424 · In effect · May 13, 2025Extends low property tax class for data centers and power plants
Who's involved
- Electric utilityNorthWestern Energy
- OperatorAtlas Power Group
Power
Capacity, as announced or filed
- 75 MW · New supply agreement, growthDec 2024 · grid connection
- 75 MW · New supply agreement, initialDec 2024 · grid connection
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Atlas Power Butte Data Center?
- Atlas Power Butte Data Center is a data center project in Butte-Silver Bow (balance), Silver Bow County, Montana.
- Who operates Atlas Power Butte Data Center?
- Atlas Power Group is named as the operator of Atlas Power Butte Data Center.
- How big is Atlas Power Butte Data Center?
- Atlas Power Butte Data Center was announced at 150 MW of capacity.
- What stage is Atlas Power Butte Data Center?
- Atlas Power Butte Data Center is expanding. It was first public in 2024.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1NorthWestern Energy to supply power for Butte, Montana data center Atlas Power Group
NorthWestern EnergyTier 4 · Captured 2026-11-08 · Open the source - 2NorthWestern Energy Reports 2025 Financial Results (Form 8-K Exhibit 99.1)
NorthWestern Energy Group, Inc.Tier 1 · Captured 2026-11-08 · Open the source - 3U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page