Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis)

St. Louis,St. Louis city,MissouriApprovedFirst public 2026Last checked Nov 8, 2026

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis) is an approved data center project in St. Louis, St. Louis city, Missouri. It was first public in 2026. No site capacity figure is published for this project.

Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis) is an approved data center project in St. Louis, St. Louis city, Missouri. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in St. Louis, St. Louis city, Missouri. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis) in St. Louis, St. Louis city, Missouri, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside St. Louis city, Missouri.See every project on the map

Timeline

  1. · New projectFirst public record of Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis)Approved

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Missouri SB 4: Utility law requiring large load customers to cover their costs

    The act covers customers of an electrical corporation serving more than two hundred fifty thousand customers who are reasonably projected to have above an annual peak demand of one hundred megawatts or more; this project has no capacity figure on record, but the project's projected annual peak demand and the customer count of its serving electrical corporation is not on record.

    “Each electrical corporation providing electric service to more than two hundred fifty thousand customers shall develop and submit to the commission schedules to include in the electrical corporation's service tariff applicable to customers who are reasonably projected to have above an annual peak demand of one hundred megawatts or more. The schedules should reasonably ensure such customers' rates will reflect the customers' representative share of the costs incurred to serve the customers and prevent other customer classes' rates from reflecting any unjust or unreasonable costs arising from service to such customers.” (Section 393.130, subsection 7, TAFP text (p. 40))

    Rule checks: Project is in Missouri. Still to check: size: unknown, who it covers: not checked

Bills and laws in Missouri

Open Bill Watch

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis)?
    Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis) is a data center project in St. Louis, St. Louis city, Missouri.
    What stage is Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis)?
    Data center at the former Famous-Barr warehouse (Armory Innovation District, St. Louis) is approved. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      City of St. Louis Approves Permit for Data Center Project, Announces Significant Conditions and Community Benefit Framework
      City of St. Louis
      Tier 1 · Captured 2026-11-08 · Open the source
    2. 2
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page