Project File
Applied Digital Delta Forge 2
Brookwood,Tuscaloosa County,AlabamaApprovedFirst public 2026Filing entity: APLD BHM-01 LLCLast checked Nov 13, 2026
Applied DigitalDeveloper and operatorAlabama PowerElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Applied Digital Delta Forge 2 is an approved data center project in Brookwood, Tuscaloosa County, Alabama. Applied Digital is named as operator. It was first public in 2026. It was announced at 210 MW.
Applied Digital Delta Forge 2 is an approved data center project in Brookwood, Tuscaloosa County, Alabama. Applied Digital is named as operator. It was announced at 210 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Brookwood, Tuscaloosa County, Alabama. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Applied Digital Delta Forge 2Approved
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Alabama HB 399: Limits data center tax abatements to 20 years, with a community-investment path to 30, and extends the program sunset to 2032
The act covers data processing centers, establishments at which not less than 20 new jobs are located with average annual total compensation of not less than $40,000, engaged in data processing and hosting services, whose tax abatements the act limits and conditions; this project has 210 MW on record (IT load), but the project's new jobs, average annual compensation, capital investment, and whether an abatement has been granted for it is not on record. Status part: the bill's status (enacted) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“(4) DATA PROCESSING CENTER. An establishment at which not less than 20 new jobs are located, the average annual total compensation, including benefits, of such new jobs to be not less than forty thousand dollars ($40,000) and such establishment is engaged in the provision of complete processing and specialized reports from data, the provision of automated data processing and data entry services, the provision of an infrastructure for hosting or data processing services” (Enrolled act, Section 1, amended Code Section 40-9B-3(a)(4) (quote stops at the page break in the enrolled text layer; the definition continues with hosting, application service provisioning, and time-share mainframe activities))
Rule checks: Project is in Alabama; 210 MW on record (it load), threshold 100 MW (Enrolled act, Section 1, amended Code Section 40-9B-4(c)(2) b.). Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Alabama SB 270: Requires data center power contracts to repay their own costs
The act covers large load data center customers, customers of the utility that have executed a contract for retail electric service requiring the utility to serve an expected total peak demand of 150 megawatts or greater at one or more contiguous parcels of land, that meet the data processing center definition and operate solely for data processing; this project has 210 MW on record (IT load), but the project's expected total peak demand and whether it has executed a retail electric service contract of that size is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“A customer of the utility which has executed a contract for retail electric service with the utility which requires the utility to serve an expected total peak demand of 150 megawatts or greater at one or more contiguous parcels of land, meets the definition of a data processing center under Section 40-9B-3, and operates solely for the purpose of data processing.” (Enrolled act, Section 1, new Code Section 37-4-22.1(a)(2))
Rule checks: Project is in Alabama; 210 MW on record (it load), threshold 150 MW (Enrolled act, Section 1, new Code Section 37-4-22.1(a)(2)). Still to check: who it covers: not checked
Bills and laws in Alabama
- SB 270 · Signed into law · Apr 17, 2026Requires data center power contracts to repay their own costs
- SB 265 · Died or failed · Apr 9, 2026Senate companion to HB 399 on data center tax abatements (not enacted)
- HB 399 · Signed into law · Apr 9, 2026Limits data center tax abatements to 20 years, with a community-investment path to 30, and extends the program sunset to 2032
- HB 403 · Died or failed · Mar 31, 2026House companion to SB 270 on PSC review of data center power contracts (not enacted)
Who's involved
- Developer and operatorApplied Digital
- Electric utilityAlabama Power
Power
Capacity, as announced or filed
- 210 MW · Leased capacity (initial term)Jun 2026 · it_load
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Applied Digital Delta Forge 2?
- Applied Digital Delta Forge 2 is a data center project in Brookwood, Tuscaloosa County, Alabama.
- Who operates Applied Digital Delta Forge 2?
- Applied Digital is named as the operator of Applied Digital Delta Forge 2.
- How big is Applied Digital Delta Forge 2?
- Applied Digital Delta Forge 2 was announced at 210 MW of capacity.
- What stage is Applied Digital Delta Forge 2?
- Applied Digital Delta Forge 2 is approved. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Applied Digital Signs 210 MW Lease at Delta Forge 2, Expanding Its AI Factory Franchise Model to a Fifth Campus
Applied Digital Corporation (GlobeNewswire)Tier 4 · Captured 2026-11-08 · Open the source - 2Applied Digital Reports Fiscal First Quarter 2027 Results
Applied Digital Corporation (GlobeNewswire)Tier 4 · Captured 2026-11-08 · Open the source - 3SELC Initial Comments on Large Load Contracts, Docket 33709
Southern Environmental Law Center (filed in Ala. PSC Docket 33709)Tier 2 · Captured 2026-11-08 · Open the source