Data Center Fact Check tracks 1 data center project in Lusby, Maryland as of November 2026.
Lusby has 1 tracked data center project. The project here is Calvert Technology Center, cancelled. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Lusby
- Calvert Technology Center
CancelledLusby
Who serves this place
- Not collected yet.
Bills and laws in Maryland
- HB 1534 · Died or failedSets operating and siting standards for data centers
- HB 120 · Died or failedBans new data centers until co-location is required
- SB 116 · Veto overridden · Dec 16, 2025Requires a state study of data center impacts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Lusby?
- Data Center Fact Check tracks 1 data center project in Lusby as of November 2026.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Lusby." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-md-lusby
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page