city Card
Data centers in Auburn, Alabama
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Auburn, Alabama as of November 2026, totaling about 16 MW announced where a figure is published.
Auburn has 1 tracked data center project. Their announced capacity totals about 16 MW where a figure is published. The project here is AUBix Data Center, operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Auburn
- AUBix Data Center
OperatingAuburn16 MW announced
Who serves this place
- Not collected yet.
Tax breaks and payments
2025 · AUBix Data Center
Tax abatement amendment and joinder agreement (City of Auburn Resolution No. 25-045), under the Tax Incentive Reform Act of 1992, Ala. Code Sections 40-9B-1 et seq.
The March 4, 2025 council action amends the City's existing AUBix data center abatement and joins Core Scientific, Inc. to it as the facility's operator. The minutes state no term, percentage, or value; the underlying abatement (granted to AUBix, LLC on August 17, 2021) and the amendment's terms sit in the agreement and the city packets, which were not read in this pass.
All tax records for AUBix Data Center
Court cases and commission dockets in Alabama (4)
Bills and laws in Alabama
- SB 270 · Signed into law · Apr 17, 2026Requires data center power contracts to repay their own costs
- SB 265 · Died or failed · Apr 9, 2026Senate companion to HB 399 on data center tax abatements (not enacted)
- HB 399 · Signed into law · Apr 9, 2026Limits data center tax abatements to 20 years, with a community-investment path to 30, and extends the program sunset to 2032
- HB 403 · Died or failed · Mar 31, 2026House companion to SB 270 on PSC review of data center power contracts (not enacted)
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Auburn?
- Data Center Fact Check tracks 1 data center project in Auburn as of November 2026.
- What is the biggest data center in Auburn?
- By announced capacity, the biggest data center in Auburn is AUBix Data Center, announced at 16 MW. It is operating.
- How much power do data centers in Auburn use?
- The 1 projects tracked in Auburn have announced about 16 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1City Council Minutes, March 4, 2025 (Resolution No. 25-045)
City of Auburn, AlabamaTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Auburn." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-al-auburn
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page