Data center court cases and dockets

A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.

See this week's Docket Drop

Showing one project: Microsoft Storey County land (Tahoe Reno Industrial Center)

10 dockets

Cases and proceedings

  1. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.

    Public Utilities Commission of Nevada · Docket 26-05026 · Sierra Pacific Power Co · Nevada

  2. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)

    Public Utilities Commission of Nevada · Docket 26-05027 · Sierra Pacific Power Co · Nevada

  3. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers

    Public Utilities Commission of Nevada · Docket 26-05028 · Sierra Pacific Power Co · Nevada

  4. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests

    Public Utilities Commission of Nevada · Docket 26-03009 · Sierra Pacific Power Co · Nevada

  5. Utility commissionDecidedLarge loads

    Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate

    Public Utilities Commission of Nevada · Docket 26-09005 · Sierra Pacific Power Co · Nevada

  6. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.

    Public Utilities Commission of Nevada · Docket 26-05026 · Sierra Pacific Power Co · Nevada

  7. Utility commissionPending before the commissionLarge loads

    Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement

    Public Utilities Commission of Nevada · Docket 26-05007 · Sierra Pacific Power Co · Nevada

  8. Utility commissionDecidedLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers

    Public Utilities Commission of Nevada · Docket 24-05022 · Sierra Pacific Power Co · Nevada

  9. Utility commissionDecidedLarge loads

    Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)

    Public Utilities Commission of Nevada · Docket 16-09023 · Sierra Pacific Power Co · Nevada

  10. Utility commissionDecidedLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc.

    Public Utilities Commission of Nevada · Docket 15-11025 · Sierra Pacific Power Co · Nevada

Sources on this page

  1. 1
    PUCN docket information list (all utilities)
    Public Utilities Commission of Nevada
    Tier 1 · Draft research, not yet verified · Open the source
  2. 2
    2026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
    NV Energy
    Tier 2 · Draft research, not yet verified · Open the source
  3. 3
    2026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
    NV Energy
    Tier 1 · Draft research, not yet verified · Open the source
  4. 4
    The PUCN Connection newsletter, April 2026 edition
    Public Utilities Commission of Nevada
    Tier 1 · Draft research, not yet verified · Open the source
  5. 5
    Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
    Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)
    Tier 2 · Draft research, not yet verified · Open the source