Data center court cases and dockets
A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.
Showing one project: Fleet Data Centers South Valley (Storey County)
10 dockets
Cases and proceedings
Utility commissionPending before the commissionLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
Public Utilities Commission of Nevada · Docket 26-05026 · Sierra Pacific Power Co · Nevada
Utility commissionPending before the commissionLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
Public Utilities Commission of Nevada · Docket 26-05027 · Sierra Pacific Power Co · Nevada
Utility commissionPending before the commissionLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
Public Utilities Commission of Nevada · Docket 26-05028 · Sierra Pacific Power Co · Nevada
Utility commissionPending before the commissionLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
Public Utilities Commission of Nevada · Docket 26-03009 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
Public Utilities Commission of Nevada · Docket 26-09005 · Sierra Pacific Power Co · Nevada
Utility commissionPending before the commissionLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
Public Utilities Commission of Nevada · Docket 26-05026 · Sierra Pacific Power Co · Nevada
Utility commissionPending before the commissionLarge loads
Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
Public Utilities Commission of Nevada · Docket 26-05007 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
Public Utilities Commission of Nevada · Docket 24-05022 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)
Public Utilities Commission of Nevada · Docket 16-09023 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc.
Public Utilities Commission of Nevada · Docket 15-11025 · Sierra Pacific Power Co · Nevada
Sources on this page
- 1PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · Draft research, not yet verified · Open the source - 22026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
NV EnergyTier 2 · Draft research, not yet verified · Open the source - 32026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
NV EnergyTier 1 · Draft research, not yet verified · Open the source - 4The PUCN Connection newsletter, April 2026 edition
Public Utilities Commission of NevadaTier 1 · Draft research, not yet verified · Open the source - 5Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)Tier 2 · Draft research, not yet verified · Open the source