Skip to content

Project File

Switch Pyramid Campus (Grand Rapids)

Kent County,MichiganExpandingFirst public 2015Filing entity: Switch, Inc.Last checked Nov 8, 2026

SwitchDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Switch Pyramid Campus (Grand Rapids) is an expanding data center project in Kent County, Michigan. Switch is named as operator. It was first public in 2015. No site capacity figure is published for this project.

Switch Pyramid Campus (Grand Rapids) is an expanding data center project in Kent County, Michigan. Switch is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Kent County, Michigan. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Kent County, Michigan.See every project on the map

The land, to scale

One football field
138 acres, about 104 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Switch Pyramid Campus (Grand Rapids)Expanding

Bills and laws in Michigan

Open Bill Watch

Who's involved

  • Developer and operatorSwitch

Power

Capacity, as announced or filed

  • 110 MW · Full campus at completionwhat the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Switch Pyramid Campus (Grand Rapids)?
    Switch Pyramid Campus (Grand Rapids) is a data center project in Kent County, Michigan.
    Who operates Switch Pyramid Campus (Grand Rapids)?
    Switch is named as the operator of Switch Pyramid Campus (Grand Rapids).
    How big is Switch Pyramid Campus (Grand Rapids)?
    The site covers 138 acres.
    What stage is Switch Pyramid Campus (Grand Rapids)?
    Switch Pyramid Campus (Grand Rapids) is expanding. It was first public in 2015.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      West Michigan Lands Largest Third-Party Data Center In Eastern U.S.
      Business Facilities (reporting the Switch announcement via The Right Place)
      Tier 3 · Captured 2026-11-08 · Open the source
    2. 2
      Switch GRAND RAPIDS 1 | 6100 E Paris Avenue SE, Grand Rapids
      Data Center Hawk (quoting Switch's own facility description)
      Tier 3 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page