Aligned Data Centers DFW-03 (Mansfield)

Mansfield,Tarrant County,TexasUnder constructionFirst public 2026Last checked Nov 14, 2026

Aligned Data CentersOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Aligned Data Centers DFW-03 (Mansfield) is a under-construction data center project in Mansfield, Tarrant County, Texas. Aligned Data Centers is named as operator. It was first public in 2026. No site capacity figure is published for this project.

Aligned Data Centers DFW-03 (Mansfield) is an under-construction data center project in Mansfield, Tarrant County, Texas. Aligned Data Centers is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Mansfield, Tarrant County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Newswire for Tarrant County

  1. What the record shows · November 22, 2026

    The Dalles has metered Google's water use for 20 years: 13,000 gallons in 2005, 548.7 million in 2025

  2. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  3. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

County outline onlyExact site not confirmed yet. The outline shows Tarrant County, Texas.See every project on the map

The land, to scale

One football field
27 acres, about 20 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Aligned Data Centers DFW-03 (Mansfield)Under construction
  2. · Stage changeAligned Data Centers DFW-03 (Mansfield): Under construction to Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The act covers customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has no capacity figure on record, but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))

    Rule checks: Project is in Texas. Still to check: size: unknown, who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Aligned Data Centers DFW-03 (Mansfield)?
    Aligned Data Centers DFW-03 (Mansfield) is a data center project in Mansfield, Tarrant County, Texas.
    Who operates Aligned Data Centers DFW-03 (Mansfield)?
    Aligned Data Centers is named as the operator of Aligned Data Centers DFW-03 (Mansfield).
    How big is Aligned Data Centers DFW-03 (Mansfield)?
    The site covers 27 acres.
    What stage is Aligned Data Centers DFW-03 (Mansfield)?
    Aligned Data Centers DFW-03 (Mansfield) is under construction. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Aligned Data Centers data center locations (operator’s own list)
      Aligned Data Centers
      Tier 2 · Captured 2026-11-10 · Open the source
    2. 2
      Aligned Data Centers Expands DFW Footprint with New Data Center in Mansfield, TX
      Aligned Data Centers (GlobeNewswire release, wire copy)
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page