Archbald,Lackawanna County,PennsylvaniaIn permittingFirst public 2025Filing entity: Archbald 25 Developer, LLCLast checked Nov 9, 2026

Archbald 25 Developer LLCDeveloperCorscaleDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Project Gravity data center is a data center project in Archbald, Lackawanna County, Pennsylvania. Archbald 25 Developer LLC is named as developer. It is in permitting. It was first public in 2025. It was announced at 475 MW.

Project Gravity data center is a data center project in Archbald, Lackawanna County, Pennsylvania. Archbald 25 Developer LLC is named as developer. It was announced at 475 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Archbald, Lackawanna County, Pennsylvania. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

475 MWAnnounced capacity
4Public records we have found
7Buildings

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Project Gravity data center (Archbald 25 Developer LLC) in Archbald, Lackawanna County, Pennsylvania, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Lackawanna County, Pennsylvania.See every project on the map

The land, to scale

One football field
186.21 acres, about 141 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · Court caseCourt case filed: Valley View School District v. Project Gravity developers and Archbald Borough (caption as described by the district's solicitor; formal caption not published in sources read)Court of Common Pleas of Lackawanna County
  2. · New projectFirst public record of Project Gravity data centerIn permitting
  3. · FilingFiled with Pennsylvania Department of Environmental Protection: wetland permit for Project Gravity data centerE3502225-006
  4. · DecisionU.S. Army Corps of Engineers, Baltimore District: Approved Jurisdictional Determination: the Corps has no jurisdiction over any aquatic resources identified onsite for Project Gravity data center

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 1834: Regulates commercial data centers and their energy use

    The act covers commercial data centers in Pennsylvania, facilities used for processing, storing, retrieving, or transmitting data with a peak demand of 25 megawatts or greater that are interconnected to a public utility; this project has 475 MW announced on record, but the project's peak demand is not on record.

    “A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following: (1) Is used by a business entity or other enterprise to operate, manage or maintain a computer, group of computers or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving or transmitting data. (2) Has a peak demand of 25 megawatts or greater. (3) Is interconnected to a public utility at a single point of interconnection or multiple points of interconnection or is interconnected to multiple public utilities within this Commonwealth through multiple points of interconnection.” (Section 2, definition of commercial data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 2650: Requires state certification for data center tax benefits

    The act covers computer data centers in Pennsylvania, facilities predominantly used to house working servers or similar data storage systems, when an owner or operator seeks GRID certification and its tax benefits; this project has 475 MW announced on record, but whether its owner or operator has applied for or holds GRID certification is not on record.

    “All or part of a facility that may be composed of one or more businesses, owners or tenants, that is or will be predominantly used to house working servers or similar data storage systems and that may have uninterruptible energy supply or generator backup power, or both closed-loop cooling systems, towers and other temperature control infrastructure.” (Section 2902-D.1, definition of computer data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

Bills and laws in Pennsylvania

All 12 in Bill Watch

Who's involved

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Pennsylvania Department of Environmental Protection, E3502225-006

    Stated in the filing
    170 acres (limit of disturbance, approximate, JPA alternatives analysis)
    Buildings
    7 buildings
    Stated in the filing
    186.21 acres (existing property, DEP Northeast Regional Office summary)
    Stated in the filing
    181.015 acres (site area on the application plan sheets)
    Stated in the filing
    459 linear feet of an unnamed tributary to Callender Gap Creek and its floodway to be filled (207 + 252 linear feet, Pennsylvania Bulletin notice)
    Stated in the filing
    135,000 square feet, footprint of each building (DEP Northeast Regional Office summary)
    Stated in the filing
    1.4 acres of wetlands to be filled (Pennsylvania Bulletin notice)
    Stated in the filing
    2.24 acres (permanent direct wetland impacts, JPA alternatives analysis)
    Stated in the filing
    0.78 acre of open water pits to be filled (Pennsylvania Bulletin notice)
    Stated in the filing
    0.95 wetland mitigation bank credits to be purchased (Pine Creek Mitigation Bank)
  • Pennsylvania Department of Environmental Protection, PAC350210

    Stated in the filing
    180 acres (total earth disturbance, DEP Northeast Regional Office summary)

Public records

4 records found so far. 5 kinds of record are still being collected.

See every record

Questions people ask

Where is Project Gravity data center?
Project Gravity data center is a data center project in Archbald, Lackawanna County, Pennsylvania.
Who is developing Project Gravity data center?
Archbald 25 Developer LLC is named as the developer of Project Gravity data center.
How big is Project Gravity data center?
Project Gravity data center was announced at 475 MW of capacity. The site covers 186.21 acres.
What stage is Project Gravity data center?
Project Gravity data center is in permitting. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Joint Application for Pennsylvania Chapter 105 Water Obstruction and Encroachment Permit and U.S. Army Corps of Engineers Section 404 Permit, Project Gravity (applicant: Archbald 25 Developer, LLC), October 2025
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Northeast Regional Office Community Information: Project Gravity Data Center
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Pennsylvania Bulletin, Vol. 55, No. 46, November 15, 2025, Notices: Water Obstructions and Encroachments, Applications Received, E3502225-006 (p. 7911)
    Commonwealth of Pennsylvania (Pennsylvania Bulletin)
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    DEP to Host Informational Public Meeting for Project Gravity Data Center in Lackawanna County
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Data Centers in Archbald: Why Communities Need Regulation (Valley View School District solicitor's account of the Archbald cases)
    Joyce, Carmody & Moran PC
    Tier 4 · Captured 2026-11-09 · Open the source
  6. 6
    Project Gravity, Archbald, Pennsylvania (developer project website)
    Corscale
    Tier 4 · Captured 2026-11-09 · Open the source