Project File
Hut 8 River Bend Campus
West Feliciana Parish,LouisianaUnder constructionFirst public 2025Last checked Nov 13, 2026
Hut 8Developer and operatorJacobsBuilderEntergy LouisianaElectric utilityFluidstackEnd user
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: City or address
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Hut 8 River Bend Campus is a under-construction data center project in West Feliciana Parish, Louisiana. Hut 8 is named as operator. It was first public in 2025. It was announced at 245 MW.
Hut 8 River Bend Campus is an under-construction data center project in West Feliciana Parish, Louisiana. Hut 8 is named as operator. It was announced at 245 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in West Feliciana Parish, Louisiana. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Hut 8 River Bend CampusUnder construction
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Louisiana SB 79: Adds data centers to industrial purposes for local agreements
The act counts the construction and operation of data centers as industrial purposes, and this project is a data center in Louisiana on record, so every condition the text sets is met by a fact on record.
“"Industrial purposes" shall include the construction and operation of data centers and commercial operations directly related thereto.” (Enrolled text, Section 1, amending R.S. 33:130.12)
Rule checks: Project is in Louisiana. Still to check: who it covers: not checked
Bills and laws in Louisiana
- EO 26-058 · In effect · Jun 25, 2026Sets ratepayer and community conditions data centers must meet for the state sales tax exemption
- SB 490 · Died or failed · May 18, 2026Lets private power networks serve data centers off the grid
- HB 1206 · Died or failed · Apr 28, 2026Requires permits and reporting for large data center water use
- HB 922 · Died or failed · Mar 9, 2026Bars household rate increases caused by data center demand
- SB 79 · Signed into law · Jun 4, 2025Adds data centers to industrial purposes for local agreements
Who's involved
- Developer and operatorHut 8
- BuilderJacobs
- Electric utilityEntergy Louisiana
- End userFluidstack
Power
Capacity, as announced or filed
- 330 MW · Initial utility capacity (Entergy Louisiana)Dec 2025 · grid connection
- 245 MW · Initial lease (Fluidstack)Dec 2025 · it_load
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Hut 8 River Bend Campus?
- Hut 8 River Bend Campus is a data center project in West Feliciana Parish, Louisiana.
- Who operates Hut 8 River Bend Campus?
- Hut 8 is named as the operator of Hut 8 River Bend Campus.
- How big is Hut 8 River Bend Campus?
- Hut 8 River Bend Campus was announced at 245 MW of capacity.
- What stage is Hut 8 River Bend Campus?
- Hut 8 River Bend Campus is under construction. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of USD $7.0 Billion
Hut 8 Corp.Tier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page