Expedient Pittsburgh (Green Tree)

Pittsburgh,Allegheny County,PennsylvaniaOperatingLast checked Nov 10, 2026

ExpedientOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

3 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Expedient Pittsburgh (Green Tree) is an operating data center project in Pittsburgh, Allegheny County, Pennsylvania. Expedient is named as operator. No site capacity figure is published for this project.

Expedient Pittsburgh (Green Tree) is an operating data center project in Pittsburgh, Allegheny County, Pennsylvania. Expedient is named as operator. No site capacity figure is published for this project. 3 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Pittsburgh, Allegheny County, Pennsylvania. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Expedient Pittsburgh (Green Tree) in Pittsburgh, Allegheny County, Pennsylvania, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Allegheny County, Pennsylvania.See every project on the map

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 1834: Regulates commercial data centers and their energy use

    The act covers commercial data centers in Pennsylvania, facilities used for processing, storing, retrieving, or transmitting data with a peak demand of 25 megawatts or greater that are interconnected to a public utility; this project is a data center in Allegheny County, Pennsylvania, with a stage of operating on record, but the project's peak demand is not on record.

    “A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following: (1) Is used by a business entity or other enterprise to operate, manage or maintain a computer, group of computers or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving or transmitting data. (2) Has a peak demand of 25 megawatts or greater. (3) Is interconnected to a public utility at a single point of interconnection or multiple points of interconnection or is interconnected to multiple public utilities within this Commonwealth through multiple points of interconnection.” (Section 2, definition of commercial data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 2650: Requires state certification for data center tax benefits

    The act covers computer data centers in Pennsylvania, facilities predominantly used to house working servers or similar data storage systems, when an owner or operator seeks GRID certification and its tax benefits; this project is a data center in Allegheny County, Pennsylvania, with a stage of operating on record, but whether its owner or operator has applied for or holds GRID certification is not on record.

    “All or part of a facility that may be composed of one or more businesses, owners or tenants, that is or will be predominantly used to house working servers or similar data storage systems and that may have uninterruptible energy supply or generator backup power, or both closed-loop cooling systems, towers and other temperature control infrastructure.” (Section 2902-D.1, definition of computer data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

Bills and laws in Pennsylvania

All 12 in Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Expedient Pittsburgh (Green Tree)?
    Expedient Pittsburgh (Green Tree) is a data center project in Pittsburgh, Allegheny County, Pennsylvania.
    Who operates Expedient Pittsburgh (Green Tree)?
    Expedient is named as the operator of Expedient Pittsburgh (Green Tree).
    What stage is Expedient Pittsburgh (Green Tree)?
    Expedient Pittsburgh (Green Tree) is operating.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Expedient data center locations (Pittsburgh: Nova Place and Green Tree)
      Expedient
      Tier 4 · Captured 2026-11-10 · Open the source
    2. 2
      EIA Form 861, Service Territory file, 2025 (final)
      U.S. Energy Information Administration
      Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page