CyrusOne DFW7 Fort Worth campus

Fort Worth,Tarrant County,TexasUnder constructionFirst public 2026Last checked Nov 13, 2026

EolianDeveloperCyrusOneOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

CyrusOne DFW7 Fort Worth campus is a under-construction data center project in Fort Worth, Tarrant County, Texas. CyrusOne is named as operator. It was first public in 2026. It was announced at 200 MW.

CyrusOne DFW7 Fort Worth campus is an under-construction data center project in Fort Worth, Tarrant County, Texas. CyrusOne is named as operator. It was announced at 200 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Fort Worth, Tarrant County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

200 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Newswire for Tarrant County

  1. What the record shows · November 22, 2026

    The Dalles has metered Google's water use for 20 years: 13,000 gallons in 2005, 548.7 million in 2025

  2. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  3. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

County outline onlyExact site not confirmed yet. The outline shows Tarrant County, Texas.See every project on the map

Timeline

  1. · New projectFirst public record of CyrusOne DFW7 Fort Worth campusUnder construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The standards must apply only to customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has 200 MW on record (not stated), but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record.

    “The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))

    Rule checks: Project is in Texas; 200 MW on record (not stated), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 200 MW · Jan 2026 · what the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is CyrusOne DFW7 Fort Worth campus?
    CyrusOne DFW7 Fort Worth campus is a data center project in Fort Worth, Tarrant County, Texas.
    Who operates CyrusOne DFW7 Fort Worth campus?
    CyrusOne is named as the operator of CyrusOne DFW7 Fort Worth campus.
    How big is CyrusOne DFW7 Fort Worth campus?
    CyrusOne DFW7 Fort Worth campus was announced at 200 MW of capacity.
    What stage is CyrusOne DFW7 Fort Worth campus?
    CyrusOne DFW7 Fort Worth campus is under construction. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      CyrusOne and Eolian Partner to Enable Rapid Deployment of 200 Megawatt Data Center Campus in Fort Worth, Texas
      CyrusOne
      Tier 4 · Captured 2026-11-09 · Open the source