CyrusOne DFW7 Fort Worth campus
Fort Worth,Tarrant County,TexasUnder constructionFirst public 2026Last checked Nov 13, 2026
EolianDeveloperCyrusOneOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
CyrusOne DFW7 Fort Worth campus is a under-construction data center project in Fort Worth, Tarrant County, Texas. CyrusOne is named as operator. It was first public in 2026. It was announced at 200 MW.
CyrusOne DFW7 Fort Worth campus is an under-construction data center project in Fort Worth, Tarrant County, Texas. CyrusOne is named as operator. It was announced at 200 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Fort Worth, Tarrant County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Newswire for Tarrant County
What the record shows · November 22, 2026
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
Timeline
- · New projectFirst public record of CyrusOne DFW7 Fort Worth campusUnder construction
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
The standards must apply only to customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has 200 MW on record (not stated), but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record.
“The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))
Rule checks: Project is in Texas; 200 MW on record (not stated), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
Power
Capacity, as announced or filed
- 200 MW · Jan 2026 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is CyrusOne DFW7 Fort Worth campus?
- CyrusOne DFW7 Fort Worth campus is a data center project in Fort Worth, Tarrant County, Texas.
- Who operates CyrusOne DFW7 Fort Worth campus?
- CyrusOne is named as the operator of CyrusOne DFW7 Fort Worth campus.
- How big is CyrusOne DFW7 Fort Worth campus?
- CyrusOne DFW7 Fort Worth campus was announced at 200 MW of capacity.
- What stage is CyrusOne DFW7 Fort Worth campus?
- CyrusOne DFW7 Fort Worth campus is under construction. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1CyrusOne and Eolian Partner to Enable Rapid Deployment of 200 Megawatt Data Center Campus in Fort Worth, Texas
CyrusOneTier 4 · Captured 2026-11-09 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page