Project File
Bow Merrimack Station Large Load Proposal
Bow,Merrimack County,New HampshireProposedFirst public 2026Filing entity: Granite Shore Power, LLCLast checked Nov 8, 2026
Granite Shore PowerDeveloperEversourceElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Bow Merrimack Station Large Load Proposal is a proposed data center project in Bow, Merrimack County, New Hampshire. Granite Shore Power is named as developer. It was first public in 2026. No site capacity figure is published for this project.
Bow Merrimack Station Large Load Proposal is a proposed data center project in Bow, Merrimack County, New Hampshire. Granite Shore Power is named as developer. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Bow, Merrimack County, New Hampshire. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Bow Merrimack Station Large Load ProposalProposed
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026New Hampshire HB 672: Lets large users buy power from off-grid providers
The act exempts an off-grid electricity provider, one not connected to any existing electric transmission or distribution system in the state for primary or backup supply, from RSA Title XXXIV when it begins operations on or after August 1, 2025; this project's on-record step is a viability assessment with Eversource's Public Service Company of New Hampshire to study connecting a large load to the grid, and whether the project takes service from an off-grid electricity provider is not on record.
“"Off-grid electricity provider" means an entity, person, private company, electric cooperative, municipal agency, or otherwise, that engages in any combination of generating, transmitting, distributing, or selling electricity at retail to consumers; is not connected to any existing electric transmission or distribution system within the state for either primary or backup supply, operates independently of existing utilities and other regulated entities, is not located within or crosses any federal, state, or municipal roadway or right-of-way, or crosses state boundaries.” (Chapter 285, section 285:1 (new RSA 374:3-c, paragraph I(a)))
Rule checks: Project is in New Hampshire. Still to check: who it covers: not checked
Bills and laws in New Hampshire
- HB 672 · In effect · Aug 1, 2025Lets large users buy power from off-grid providers
Who's involved
- DeveloperGranite Shore Power
- Electric utilityEversource
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Bow Merrimack Station Large Load Proposal?
- Bow Merrimack Station Large Load Proposal is a data center project in Bow, Merrimack County, New Hampshire.
- Who is developing Bow Merrimack Station Large Load Proposal?
- Granite Shore Power is named as the developer of Bow Merrimack Station Large Load Proposal.
- What stage is Bow Merrimack Station Large Load Proposal?
- Bow Merrimack Station Large Load Proposal is proposed. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Possible hyperscale data center eyed for Bow
Business NH MagazineTier 3 · Captured 2026-11-08 · Open the source - 2Bow residents worry data center could replace former power plant
NHPR (New England News Collaborative, via Ocean State Media)Tier 3 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page