Project File
Beale Infrastructure data center, Project Mustang (Claremore)
Claremore,Rogers County,OklahomaApprovedFirst public 2025Filing entity: Mustang Tulsa Holdings, LLCLast checked Nov 8, 2026
Beale InfrastructureDeveloperGRDAElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: Capacity
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Beale Infrastructure data center, Project Mustang (Claremore) is an approved data center project in Claremore, Rogers County, Oklahoma. Beale Infrastructure is named as developer. It was first public in 2025. No site capacity figure is published for this project.
Beale Infrastructure data center, Project Mustang (Claremore) is an approved data center project in Claremore, Rogers County, Oklahoma. Beale Infrastructure is named as developer. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Claremore, Rogers County, Oklahoma. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline
- · New projectFirst public record of Beale Infrastructure data center, Project Mustang (Claremore)Approved
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oklahoma SB 259: Restricts groundwater cooling permits for data centers
The act covers data processing facilities and data centers that use groundwater for cooling, whose groundwater permits may issue only for closed-loop, dielectric immersion, or comparably low-consumptive cooling technologies; this project has no capacity figure on record, but whether this project uses groundwater for cooling and which cooling technology it uses is not on record.
“Using groundwater for cooling purposes at a data processing facility or data center through open-air evaporative cooling systems or any other cooling technology that consumes groundwater through evaporation or discharge without recirculation. Groundwater permits for such facilities shall only be issued if the applicant demonstrates that the cooling system utilizes closed-loop, dielectric immersion, or other comparably low-consumptive cooling technologies that substantially recirculate groundwater and minimize consumptive loss as determined by the Board” (Enrolled text, amended 82 O.S. Section 1020.15, permitting exclusions list, item 11)
Rule checks: Project is in Oklahoma. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Oklahoma
- HB 2992 · In effect · Jul 1, 2026Requires separate tariffs and long contracts for large load customers
- SB 259 · Signed into law · May 20, 2026Restricts groundwater cooling permits for data centers
- HB 3724 · Died or failed · Feb 17, 2026Bans subsidies and cost shifting for high-demand facilities
- HB 3392 · Died or failed · Feb 11, 2026Orders a state study of large load customer impacts
- HB 3917 · Died or failed · Feb 4, 2026Adds a peak demand surcharge for large data centers
- HB 4194 · Died or failed · Feb 3, 2026Requires financial assurance for data center decommissioning
Who's involved
- DeveloperBeale Infrastructure
- Electric utilityGRDA
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Beale Infrastructure data center, Project Mustang (Claremore)?
- Beale Infrastructure data center, Project Mustang (Claremore) is a data center project in Claremore, Rogers County, Oklahoma.
- Who is developing Beale Infrastructure data center, Project Mustang (Claremore)?
- Beale Infrastructure is named as the developer of Beale Infrastructure data center, Project Mustang (Claremore).
- What stage is Beale Infrastructure data center, Project Mustang (Claremore)?
- Beale Infrastructure data center, Project Mustang (Claremore) is approved. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1City Council Approves Tax Increment District Agreement for Claremore Data Center Project
City of ClaremoreTier 1 · Captured 2026-11-08 · Open the source - 2Claremore, Oklahoma (project page)
Beale InfrastructureTier 4 · Captured 2026-11-08 · Open the source - 3U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page