Project File
AVAIO Digital Taurus
Brandon,Rankin County,MississippiUnder constructionFirst public 2025Last checked Nov 8, 2026
AVAIO DigitalDeveloper and operatorYates ConstructionBuilderEntergy MississippiElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
AVAIO Digital Taurus is a under-construction data center project in Brandon, Rankin County, Mississippi. AVAIO Digital is named as operator. It was first public in 2025. It was announced at 116 MW.
AVAIO Digital Taurus is an under-construction data center project in Brandon, Rankin County, Mississippi. AVAIO Digital is named as operator. It was announced at 116 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Brandon, Rankin County, Mississippi. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of AVAIO Digital TaurusUnder construction
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Mississippi HB 1393: Creates an energy infrastructure fund open to data center projects
The act covers approved projects, including data centers, for which the Mississippi Energy Infrastructure Fund may give grants, loans, or other financial assistance to local entities; this project has 116 MW on record (not stated), but whether the authority has approved this project is not on record.
“The authority shall establish a program to make grants, loans or provide any other financial assistance as determined by the authority from the Mississippi Energy Infrastructure Fund to local entities to construct, equip an approved project or otherwise provide facilities related to the approved project.” (Senate amendment text to HB 1393, Section 57-39-39)
Rule checks: Project is in Mississippi. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Mississippi SB 3410: Lets Brandon contract with a data center for water infrastructure
The act authorizes the City of Brandon and the West Rankin Utility Authority to contract with a data center developer or operator for water and wastewater infrastructure; this project is a data center in Brandon on record, but no contract or agreement with the city or the authority is on record.
“the governing body and the board, in their discretion, are authorized to jointly or independently enter into one or more contracts or agreements with a developer or operator of a data center or related technology facility, and with each other, for the planning, design, construction, installation, operation, and maintenance of water and wastewater infrastructure, including, but not limited to, pipelines, pump stations, and related appurtenances, where such developer or operator agrees to reimburse the city and/or the authority, from the developer's or operator's own funds on a progress payment basis” (Enrolled text, Section 2)
Rule checks: Project is in Mississippi. Still to check: who it covers: not checked
Bills and laws in Mississippi
- SB 3410 · Signed into law · Apr 8, 2026Lets Brandon contract with a data center for water infrastructure
- HB 1393 · Signed into law · Apr 8, 2026Creates an energy infrastructure fund open to data center projects
- SB 2599 · Signed into law · Apr 8, 2026Sells the Troop H headquarters site to a data center company
- HB 1732 · Died or failed · Mar 26, 2026Sells the Troop H headquarters site to a data center company
- SB 2612 · Died or failed · Feb 3, 2026Creates an energy infrastructure fund open to data center projects
- HB 1239 · Died or failed · Mar 29, 2025Revises data center tax exemption definitions and compliance rules
Who's involved
- Developer and operatorAVAIO Digital
- BuilderYates Construction
- Electric utilityEntergy Mississippi
Power
Capacity, as announced or filed
- 116 MW · Phase 1Aug 2025 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is AVAIO Digital Taurus?
- AVAIO Digital Taurus is a data center project in Brandon, Rankin County, Mississippi.
- Who operates AVAIO Digital Taurus?
- AVAIO Digital is named as the operator of AVAIO Digital Taurus.
- How big is AVAIO Digital Taurus?
- AVAIO Digital Taurus was announced at 116 MW of capacity. The site covers 329 acres.
- What stage is AVAIO Digital Taurus?
- AVAIO Digital Taurus is under construction. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1AVAIO Digital to Build New AI-Ready $6B Data Center Hub in Brandon, Mississippi
AVAIO Digital PartnersTier 4 · Captured 2026-11-08 · Open the source - 2AVAIO Digital Breaks Ground on $6 Billion Brandon Data Center Campus; Yates Construction Begins Site Work
AVAIO Digital PartnersTier 4 · Captured 2026-11-08 · Open the source - 3We're investing now to power Mississippi's energy future (Superpower Mississippi)
EntergyTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page