ArizonaHouse of Representatives57th Legislature, 2nd Regular Session (2026)Bill
HB 2756: Lets regulators set special billing rules for very large customers
Official title: Utilities; high load factor customers
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Signed into law as of Jun 4, 2026. The official record says: signed into law.
- Filed (done)
- In committee (done)
- Passed one chamber (done)
- Passed both chambers (done)
- Signed into law (current stage)
- In effect (not reached)
What it means for a household (draft rating)
Unclear for households. The act lets the corporation commission set service terms for extra high load factor customers and orders cost-of-service studies, and the act itself sets no rule on who pays.
"Supports policies that establish new customer classes, rate designs and cost allocation formulas for extra high load factor customers that are reasonable and necessary to prevent cost shifts to residential customers from extra high load factor customers."Sec. 6, finding 3, chaptered text (Chapter 111)
We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.
What it does
Exemption · threshold 40000 connections
Applies to: member-owned electric cooperatives and small electric public service corporations (Arizona)
“This section does not apply to Member-owned electric cooperatives or electric public service corporations that serve forty thousand connections or less.”
Sec. 3, A.R.S. Sec. 40-207(D)
Reporting duty · threshold 1000000 connections
Applies to: public power entities serving more than one million connections (Arizona)
Ends: 2033-12-31.
“A public power entity that serves more than one million connections in this state shall file with the governing body of the public power entity semiannual reports regarding new extra high load factor customers, as defined by the public power entity, that include both of the following with respect to the immediately preceding six-month period: 1. The number of requests for interconnection. 2. The number of completed interconnections.”
Sec. 1, A.R.S. Sec. 30-301(A)
Service terms
Applies to: extra high load factor customers of electric public service corporations, as defined by the Corporation Commission (Arizona)
Ends: 2033-12-31.
“THE REQUIRED CHARACTERISTICS MAY INCLUDE ALL OF THE FOLLOWING AND ENSURE FLEXIBILITY FOR AN ELECTRIC PUBLIC SERVICE CORPORATION TO DEFINE SPECIFIC TERMS FOR EACH TRANSACTION ON A CASE-BY-CASE BASIS: 1. PROVISIONS FOR MINIMUM BILLING REQUIREMENTS. 2. MINIMUM CONTRACT LENGTH.”
Sec. 3, A.R.S. Sec. 40-207(C)
Sunset
Applies to: A.R.S. Sec. 40-207 (Arizona)
Ends: 2033-12-31.
“Section 40-207, Arizona Revised Statutes, as added by this act, is repealed from and after December 31, 2033.”
Sec. 4
Who it touches (52)
Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers PHX 01/02/03 (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers PHX-04 (Chandler)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 50.7 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers PHX-05 (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers PHX-06 (Chandler)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers PHX-07 (Waddell)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers PHX-13 (Glendale)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project is served by Arizona Public Service Company on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers Phoenix campus (Union Hills)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 120 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Apple Mesa data center (Global Command Center)
The act covers new extra high load factor customers of a public power entity serving more than one million connections, as defined by the entity; this project is served by Salt River Project on record, but whether Salt River Project passes that connection threshold and counts this project as a new extra high load factor customer under its own definition is not on record.
“A public power entity that serves more than one million connections in this state shall file with the governing body of the public power entity semiannual reports regarding new extra high load factor customers, as defined by the public power entity, that include both of the following with respect to the immediately preceding six-month period: 1. The number of requests for interconnection. 2. The number of completed interconnections.” (Sec. 1, A.R.S. Sec. 30-301(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Beale Infrastructure Marana Data Center Campus (Luckett Road)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centersquare PHX1 (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centersquare PHX3 (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 17.3 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters El Mirage Campus (El Mirage; 108 MW campus in development)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 108 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters Goodyear Campus (Goodyear; 212 MW campus in development)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 212 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters Goodyear campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 350 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Chandler
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Chandler campus (PHX1-PHX8)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty PHX10 (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty PHX15 (Chandler)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 31 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026EdgeConneX Mesa campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 100 MW on record (not stated), but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026EdgeConneX PHX01 (Tempe)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026EdgeCore Mesa campus
The act covers new extra high load factor customers of a public power entity serving more than one million connections, as defined by the entity; this project is served by Salt River Project on record, but whether Salt River Project passes that connection threshold and counts this project as a new extra high load factor customer under its own definition is not on record.
“A public power entity that serves more than one million connections in this state shall file with the governing body of the public power entity semiannual reports regarding new extra high load factor customers, as defined by the public power entity, that include both of the following with respect to the immediately preceding six-month period: 1. The number of requests for interconnection. 2. The number of completed interconnections.” (Sec. 1, A.R.S. Sec. 30-301(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Flexential Phoenix - Deer Valley Data Center
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 5.02 MW on record (IT load), but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Mesa data center (Project Red Hawk)
The act covers new extra high load factor customers of a public power entity serving more than one million connections, as defined by the entity; this project is served by Salt River Project on record, but whether Salt River Project passes that connection threshold and counts this project as a new extra high load factor customer under its own definition is not on record.
“A public power entity that serves more than one million connections in this state shall file with the governing body of the public power entity semiannual reports regarding new extra high load factor customers, as defined by the public power entity, that include both of the following with respect to the immediately preceding six-month period: 1. The number of requests for interconnection. 2. The number of completed interconnections.” (Sec. 1, A.R.S. Sec. 30-301(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Grande Valley Industrial Data Center Campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Data Centers Phoenix (Chandler)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 26 MW on record (IT load), but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Data Centers AZS-1 (Scottsdale)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 5.8 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Data Centers Iron Mountain Phoenix (Phoenix; four facilities listed)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 130 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Phoenix campus (AZP-1, AZP-2, AZP-3)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 41 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Scottsdale (AZS-1)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Meta Mesa Data Center
The act covers new extra high load factor customers of a public power entity serving more than one million connections, as defined by the entity; this project is served by Salt River Project on record, but whether Salt River Project passes that connection threshold and counts this project as a new extra high load factor customer under its own definition is not on record.
“A public power entity that serves more than one million connections in this state shall file with the governing body of the public power entity semiannual reports regarding new extra high load factor customers, as defined by the public power entity, that include both of the following with respect to the immediately preceding six-month period: 1. The number of requests for interconnection. 2. The number of completed interconnections.” (Sec. 1, A.R.S. Sec. 30-301(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Citrus Road campus (Goodyear)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft El Mirage datacenter campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft PHX 10-11 (Goodyear)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT Mesa PH10 campus (Pacific Proving)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 324 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT Mesa campus (Elliot Road)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 240 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Novva Data Centers Mesa campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 300 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Prime Data Centers PHX01 (Avondale)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 240 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Project Blue data center (Tucson)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Project Eagle data center and Project Baccara power plant
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Phoenix 2 (Phoenix; listed as in development)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Phoenix 2 campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 280 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Phoenix 3 (Glendale; listed as in development)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Phoenix 3 campus (Glendale)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 750 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Phoenix 4 (Avondale; listed as in development)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure PHX01 (Avondale)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 150 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure PHX02 (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 250 MW on record (not stated), but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Goodyear campus (Phoenix I-V)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 280 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Phoenix
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 280 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Tombstone Resources Cochise Supercomputer Campus
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 6,000 MW on record (grid connection), but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Goodyear campus (AZ1)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 176 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Phoenix Campus (Phoenix)
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has 176 MW announced on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026phoenixNAP Phoenix Data Center
The act covers new extra high load factor customers of an Arizona electric public service corporation or large public power entity, as defined by the corporation commission or the entity; this project has no capacity figure on record, but whether its serving utility counts it as a new extra high load factor customer under that definition is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which leaves the customer definition to the commission or the entity.
“An electric public service corporation operating in this state shall file with the corporation commission semiannual reports regarding new extra high load factor customers, AS defined by the corporation commission, that include both of the following WITH RESPECT TO THE IMMEDIATELY PRECEDING six-month period:” (Sec. 3, A.R.S. Sec. 40-207(A))
Rule checks: Project is in Arizona. Still to check: dates: not checked, who it covers: not checked
Who acted
- CosponsorWalt BlackmanHouse, R
- Primary sponsorGail GriffinHouse, district 19, R
Timeline
Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.
- · HouseHouse first reading; referred to House Natural Resources, Energy & Water and House Rules committeesStage: In committee
- · HouseHouse second reading
- · HouseHouse Natural Resources, Energy & Water Committee action: Do Pass Amended, voting: (10-0-0-0)
- · HouseHouse Rules Committee action: constitutional and in proper form, voting: (7-0-0-1)
- · HouseHouse Committee of the Whole action: Do Pass Amended
- · HouseHouse third reading PASSED voting: (38-19-3-0)Stage: Passed one chamber
- · SenateTransmit to Senate
- · SenateIntroduced in Senate and read first time; assigned to Senate Natural Resources Committee
- · SenateSenate read second time
- · SenateSenate Natural Resources Committee action: Do Pass, voting: (5-2-1-0)
- · SenateSenate Rules Committee action: proper for consideration
- · SenateSenate majority caucus: Do pass
- · SenateSenate minority caucus: Do pass
- · SenateSenate Committee of the Whole action: Retained
- · SenateSenate third reading PASSED voting: (24-3-3-0)Stage: Passed both chambers
- · HouseHouse final reading PASSED voting: (39-16-5-0)
- · ExecutiveGovernor SignedStage: Signed into law
- · ExecutiveChapter 111
More from Arizona
- HB 4168 · In effectPauses new data center tax relief applications for three years
- HB 2452 · Died or failedRequires county comprehensive plans to designate land for data centers
- HB 4009 · Died or failedRequires mapping of data centers on state lands
- SB 1799 · Died or failedMoves the cutoff for new data center tax certifications to the end of 2026
- HB 2949 · Died or failedRequires large data centers to pay their full energy costs
- SB 1463 · Died or failedRepeals the state computer data center tax relief statute
Sources
- 1Laws 2026, Chapter 111 (HB 2756), chaptered text; see also the signed bill summary at azleg.gov/legtext/57leg/2R/summary/H.HB2756_041026_SIGNED.pdf
Arizona State Legislature (azleg.gov)Tier 1 · Open the source - 2HB 2756 (57th Legislature, 2nd Regular Session), Bill Status overview
Arizona State Legislature (apps.azleg.gov)Tier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "HB 2756: Lets regulators set special billing rules for very large customers." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/az-57-2-hb-2756
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page