What it is

Creates a very large customer class and tariff under Minn. Stat. 216B.1622. The class covers new loads of 100 MW or more, and any new customer of at least 20 MW but less than 100 MW that is system intensive, meaning it will require significant system modifications, design, engineering, or other expenditures prior to starting service. Very large customers take service in their own rate class under a minimum 15-year contract, including a five-year ramp-up period, with a minimum bill of at least 80 percent of the contracted amount and an exit charge on early termination. Costs are screened under an Incremental Cost Test with added filing rules; Xcel must report on how the electricity provided to each facility complies with the state's 2040 carbon-free standard. The Commission also directed Xcel to develop and propose a clean energy and capacity tariff under Minn. Stat. 216B.1623.

The facts

Regulator
Minnesota Public Utilities Commission
Docket number
25-289
Type
Large load tariff
Utility
Xcel Energy (Northern States Power Company, Minnesota)
State
Minnesota
Status date
May 15, 2026
Large-load rules
Yes, for loads of 100 MW or more

Projects served by Xcel Energy (Northern States Power Company, Minnesota)

Related cases and proceedings

Sources

  1. 1
    Very large electric customers and the PUC process
    Minnesota Public Utilities Commission
    Tier 1 · PUC very large customers page (class definition: 100 MW, plus 20 MW or more if system intensive; Docket 25-289); CUB Minnesota account of the decision (approval May 15, 2026; separate rate class; 15-year term with five-year ramp; 80 percent minimum bill; Incremental Cost Test; 216B.1623 directive) · Open the source
  2. 2
    Data Centers to Pay Fair Share: PUC enacts protections for Xcel customers
    Citizens Utility Board of Minnesota
    Tier 4 · PUC very large customers page (class definition: 100 MW, plus 20 MW or more if system intensive; Docket 25-289); CUB Minnesota account of the decision (approval May 15, 2026; separate rate class; 15-year term with five-year ramp; 80 percent minimum bill; Incremental Cost Test; 216B.1623 directive) · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Northern States Power Company (Xcel Energy) very large customer tariff under Minn. Stat. 216B.1622." Last activity 2026-05-15. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-xcel-mn-vlc-2026