Data center court cases and dockets in Washington
A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.
3 dockets
Cases and proceedings
Utility commissionPending before the commissionLarge loads
Commission-led workshop series and policy statement on large load interconnections and tariffs
Washington Utilities and Transportation Commission · Docket UE-260162 · Washington
Utility commissionIn effectLarge loads
Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
Washington Utilities and Transportation Commission · Docket UE-250224 · PacifiCorp · Washington
Utility commissionIn effectLarge loads
PacifiCorp Advice 23-06, Rule 14 Line Extensions, Tariff WN U-76
Washington Utilities and Transportation Commission · Docket UE-231037 · PacifiCorp · Washington
Sources on this page
- 1Notice of Hybrid Technical Conference, Docket UE-260162 (large load interconnections and tariffs)
Washington Utilities and Transportation CommissionTier 1 · Draft research, not yet verified · Open the source - 2UTC to host technical conference on large energy loads, April 27
Washington Utilities and Transportation CommissionTier 1 · Draft research, not yet verified · Open the source - 3Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
PacifiCorp d/b/a Pacific Power & Light CompanyTier 1 · Draft research, not yet verified · Open the source - 4UTC Case Docket Detail Page, Docket UE-231037 (PacifiCorp, Advice 23-06)
Washington Utilities and Transportation CommissionTier 1 · Draft research, not yet verified · Open the source - 5PacifiCorp Advice 23-06 cover letter and Rule 14 tariff sheets, Docket UE-231037
PacifiCorp d/b/a Pacific Power & Light Company (filed with the Washington Utilities and Transportation Commission)Tier 1 · Draft research, not yet verified · Open the source