Every public record we have for QTS Salem Township (Salem Township; listed as in consideration)

Luzerne County, PennsylvaniaProposedFirst public 2026Last checked Nov 14, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

2 of 2 records

2026

  • Utility proceedingPending before the commissionOct 2, 2026Pennsylvania Public Utility Commission

    Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation (formal complaint on large load and data center costs)

    The Office of Consumer Advocate alleges existing customers are paying new and higher costs caused by data center additions on PPL’s system and in PJM, and are receiving service frequently interrupted or curtailed because of data center interconnection. It says Rate Schedule LP-6 does not protect enough and asks the Commission to make its model tariff guidelines mandatory for PPL: mandatory interruptible rates for data centers; pre-emergency and emergency load shed plans; classification of computational loads as critical or non-critical; affordability protections including ongoing contributions to the Universal Service Program; classification by end use (computational load) instead of only by connection above 69 kV; binding generator commitments or matching capacity from computational customers; a battery storage network for peaks; a definition of but-for costs for transmission and distribution upgrades; and a test of whether capacity and transmission rate design, including Reliability Backstop Procurement and Interim Resource Adequacy Service costs, protects other customers. The model tariff threshold is 50 MW for a single load or 100 MW in aggregate. Governor Shapiro intervened on October 16, 2026; Amazon Data Services and the Data Center Coalition intervened on November 3, 2026.

    C-2026-3065756

    Draft research, not yet verifiedLast checked Nov 11, 2026
    Where it says this

    PUC docket page, Case Summary (docket, Active, Date Filed 10/2/2026) and Daily Actions, 11/10/2026 (consolidated Scheduling Order); PPLICA Petition to Intervene, filed 2026-10-22, complaint summary at pages 1-2 and relief at pages 3-4 and 77-79

  • Utility proceedingPending before the commissionSep 14, 2026Pennsylvania Public Utility Commission

    Petition of PPL Electric Utilities Corporation for Approval of Its Non-Bypassable Customer Protection Transmission Rider, Elimination of Its Transmission Service Charge, Changes to Its Generation Supply Charges, Changes to Its Retail Tariff, and Changes to Its Electric Generation Supplier Coordination Tariff

    PPL proposes a non-bypassable Customer Protection Transmission Rider recovering NITS and certain other transmission costs, elimination of its Transmission Service Charge, and moving the remaining transmission costs into Generation Supply Charges. Certain network upgrade costs are allocated to Rate LP-6 large load customers, and the petition creates a mechanism for future Reliability Backstop Procurement and Interim Resource Adequacy Service charges or credits ultimately assigned to PPL and properly attributable to LP-6 customers. It changes how transmission costs are allocated, recovered and billed for shopping and default service customers.

    P-2026-3065185

    Draft research, not yet verifiedLast checked Nov 11, 2026
    Where it says this

    PUC docket page, Case Summary (Date Filed 9/14/2026, full case description) and Daily Actions, 11/10/2026 (consolidated Scheduling Order); RESA Prehearing Memorandum, 2026-10-30, Section I Background

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    PUC docket page, P-2026-3065185 (PPL Customer Protection Transmission Rider petition)
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source
  2. 2
    RESA Prehearing Memorandum, P-2026-3065185
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  3. 3
    PUC docket page, C-2026-3065756 (Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation)
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  4. 4
    PPLICA Petition to Intervene, C-2026-3065756
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  5. 5
    QTS data center locations (operator’s own list)
    QTS
    Tier 2 · Captured 2026-11-10 · Open the source · Archived copy
  6. 6
    Salem Township Data Center | QTS
    QTS Realty Trust
    Tier 2 · Captured 2026-11-14 · Open the source