23 of 23 records

2026

  • Utility proceedingPending before the commissionJul 17, 2026Virginia State Corporation Commission

    Petition of Northern Virginia Electric Cooperative for approval of revisions to the Terms and Conditions of Rate Schedules LP-1, DPS, HV-1 and HV-2

    Revises the terms and conditions, not the rates, of NOVEC's four large load schedules. The Commission's order calls them tariffs governing service to large load, high load factor customers. The revised schedules took effect on an interim basis on September 1, 2026, subject to further review; hearings are set for April 21, 2027.

    PUR-2026-00114

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Order for Notice and Hearing, 2026-08-21 (Doc. Con. Cen. No. 260840118), paragraphs 1-2 and ordering paragraph 2

  • Air permitIssuedFeb 11, 2026Virginia Department of Environmental Quality

    Virginia Department of Environmental Quality, Registration No. 74269

    Issued (Article 6 minor New Source Review; combined permit document combining the June 18, 2024 permit and the February 11, 2026 permit)

    Backup generators:
    1 Kohler KD1600 diesel-fired emergency engine gen-set (Ref. No. EG-43), rated 1,600 ekW (2,353 bhp) and de-rated to 1,200 ekW (1,765 bhp), originally permitted June 18, 2024
    Backup generators:
    1 Kohler KD1250 diesel-fired emergency engine gen-set (Ref. No. EG-44), rated 1,250 ekW (1,865 bhp) and de-rated to 938 ekW (1,399 bhp), equipment to be constructed under the February 11, 2026 permit
    Backup generators:
    44 emergency diesel engine gen-sets permitted under the February 11, 2026 combined permit (Ref. Nos. EG-01 through EG-44)
    Backup generators:
    42 Kohler KD3000 and/or Caterpillar C175-16 diesel-fired emergency engine gen-sets (Ref. Nos. EG-01 through EG-42), 3,000 ekW (4,332 bhp Kohler / 4,423 bhp CAT) each, originally permitted June 18, 2024
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Transmittal letter and attached permit, February 11, 2026: SI NVA06A, LLC, facility located at 19265 & 19275 Compass Creek Parkway SE, Leesburg, Virginia 20175, Loudoun County; application dated December 10, 2025, deemed complete February 10, 2026; Equipment List, p. 3 (Ref. Nos. EG-01 through EG-44)

2025

  • Recorded voteAug 11, 2025Loudoun County Board of Equalization

    Affirm the County's 2025 real estate tax assessment of 21673 Beaumeade Circle LLC, 21745 Beaumeade Circle, Ashburn (PIN 060189720000, Appeal ID 6824)

    4 yes, 2 absent. Bob Saltzman (Alternate Member): yes; Chrissie Goodrum (Member): absent; Cliff Keirce (Vice Chairman/Secretary): yes; John Fuog (Member): yes; Kevin Kuesters (Chairman): yes; Sharad Tandale (Member): absent.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    2025 Board of Equalization Annual Report, minutes of the Board of Equalization Hearings, August 11, 2025 (attendance roll, p. 1 of the day's minutes, and the 21673 BEAUMEADE CIRCLE LLC case, Appeal ID 6824)

  • Zoning ruleIn effectMar 18, 2025Loudoun County

    Data centers moved from by right to special exception in the IP, GI, and MR-HI districts

    Before this amendment, data centers were a by right use in the Industrial Park (IP), General Industry (GI), and Mineral Resources-Heavy Industry (MR-HI) districts. The amendment requires special exception approval in those three districts, and the county states the amendments eliminate data centers as a by right use in the county. Data centers were already a special exception use in the OP, CLI, and PD-RDP districts, and rural policy area districts do not allow data center development.

    ZOAM-2024-0001 and CPAM-2024-0001 (Data Center Standards and Locations Phase 1); Zoning Ordinance Table 3.02.05-1

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    County data center page, Phase 1 amendments section; use status per Zoning Ordinance Table 3.02.05-1

  • Recorded voteMar 18, 2025Loudoun County Board of Supervisors

    Grandfathering Resolution for ZOAM-2024-0001, as amended

    5 yes, 4 no. Caleb Kershner (Supervisor): yes; Juli Briskman (Supervisor): no; Koran Saines (Supervisor): yes; Kristen Umstattd (Supervisor): yes; Laura TeKrony (Supervisor): no; Matthew Letourneau (Supervisor): yes; Michael Turner (Vice Chair): no; Phyllis Randall (Chair): yes; Sylvia Glass (Supervisor): no.

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Item 7, p. 9 (Grandfathering Resolution passed 5-4)

  • Recorded voteMar 18, 2025Loudoun County Board of Supervisors

    Adoption of CPAM-2024-0001 and ZOAM-2024-0001, Data Center Standards and Locations, Phase 1 (main motion)

    7 yes, 2 no. Caleb Kershner (Supervisor): no; Juli Briskman (Supervisor): yes; Koran Saines (Supervisor): yes; Kristen Umstattd (Supervisor): no; Laura TeKrony (Supervisor): yes; Matthew Letourneau (Supervisor): yes; Michael Turner (Vice Chair): yes; Phyllis Randall (Chair): yes; Sylvia Glass (Supervisor): yes.

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Item 7, pp. 9-10 (main motion passed 7-2; Supervisors Kershner and Umstattd opposed)

2024

  • Public decisionIssuedApr 30, 2024Virginia Commission on Local Government

    Virginia Commission on Local Government, Voluntary Settlement Agreement of Annexation and Related Issues, under Va. Code Section 15.2-3400

    Commission report and recommendation (April 30, 2024) supporting approval of the agreement. The agreement defines the STACK Property (Section 2.15) as part of the Annexation Area and provides that the Town shall provide water and sewer service to the Annexation Area (Section 5.1). The agreement was validated by a special court on November 8, 2024, and the annexation took effect January 1, 2025

    Stated in the filing:
    672,000 gallons of commissioning water for Building 1 (one-time), in the Town Council approval of March 14, 2023
    Stated in the filing:
    128,000 gallons of final mechanical water for Building 1 (one-time), in the Town Council approval of March 14, 2023
    Parcel acres:
    28.943 acres (the STACK Property as defined in the agreement: the approximately 28.943-acre portion of the parcel with County PIN 234-38-2603, owned by SI NVA06A LLC)
    Stated in the filing:
    128,000 gallons of final mechanical water for Building 2 (one-time), in the Town Council approval of March 14, 2023
    Stated in the filing:
    336,000 gallons of commissioning water for Building 2 (one-time), in the Town Council approval of March 14, 2023
    Stated in the filing:
    $75.2 million , approximate price for the combined parcel sold to SI NVA06A, LLC on August 15, 2023
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Report on the Town of Leesburg, Loudoun County, Voluntary Settlement Agreement, Commission on Local Government, April 2024: Utilities paras. 30-35; Updated Description of Annexation Area para. 15; agreement Sections 2.1, 2.15, 5.1 and 6 (Appendix Item A)

  • Recorded voteFeb 27, 2024Leesburg Town Council

    Resolution approving the Town of Leesburg entering into a Voluntary Settlement Agreement of Annexation and Related Issues with Loudoun County (Agenda Item 13b)

    7 yes. Ara Bagdasarian (Council Member): yes; Kari Nacy (Council Member): yes; Kelly Burk (Mayor): yes; Neil R. Steinberg (Vice Mayor): yes; Patrick J. Wilt (Council Member): yes; Todd A. Cimino-Johnson (Council Member): yes; Zach Cummings (Council Member): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Town Council meeting, February 27, 2024, Agenda Item 13b; official webcast captions (Granicus clip 2248): motion by Vice Mayor Steinberg to approve the resolution proposed by staff, seconded by Council Member Cummings; announced result 7-0; the Mayor noted for the record that all members were present

  • Recorded voteFeb 6, 2024Loudoun County Board of Supervisors

    Resolution approving Loudoun County entering into a Voluntary Settlement Agreement of Annexation and Related Issues with the Town of Leesburg (Compass Creek annexation)

    8 yes, 1 absent. Caleb Kershner (Supervisor): yes; Juli Briskman (Vice Chair): yes; Koran Saines (Supervisor): absent; Kristen Umstattd (Supervisor): yes; Laura TeKrony (Supervisor): yes; Matthew Letourneau (Supervisor): yes; Michael Turner (Supervisor): yes; Phyllis Randall (Chair): yes; Sylvia Glass (Supervisor): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Appendix, Exhibit B (Item A p. 31): motion by Chair Randall, seconded by Vice Chair Briskman; voting list: Supervisors Briskman, Glass, Kershner, Letourneau, Randall, TeKrony, Turner, and Umstattd - Yes; None - No; Supervisor Saines - Absent for the vote

2023

  • Development ruleIn effectDec 13, 2023Loudoun County

    Mechanical equipment screening and buffer planting for data centers

    All ground level and rooftop mechanical equipment must be shown on the site plan and fully screened on all sides, and ground mounted equipment may not sit next to residential property unless a principal building stands between the equipment and that property. In place of the standard buffer table, data centers must plant a Buffer Type C on an earthen berm at least 6 feet high, with a set mix of evergreen and deciduous trees and shrubs.

    Zoning Ordinance Section 4.06.02.D.2 and Section 4.06.02.D.11

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Zoning Ordinance pp. 283-287, Section 4.06.02.D.2 and Section 4.06.02.D.11

  • Development ruleIn effectDec 13, 2023Loudoun County

    Generator testing hours for data centers next to residential property

    For data centers next to residential property, generator testing is limited to set daytime and early evening windows that change with the season. Outside testing and commissioning, generators may run only for backup or emergency use, and the standard gives way to Commonwealth regulations or permits for the property. Separately, Section 7.05.03.E exempts generator testing noise from the general maximum sound levels, so these hour limits are the control that applies to testing.

    Zoning Ordinance Section 4.06.02.D.8

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Zoning Ordinance pp. 283-287, Section 4.06.02.D.8

  • Development ruleIn effectDec 13, 2023Loudoun County

    Maximum sound levels by receiving development type, with measurement rules

    The zoning ordinance caps sound at the receiving property for all uses, at all times of day and night. Levels are measured with an integrating sound level meter meeting ANSI S1.43-1997 for Type 1 meters, set to FAST over a 15 second period, with at least 3 samples averaged, taken at the point on the receiving lot line closest to the source with the microphone 5 feet above grade. Exemptions include generator and accessory equipment sounds during an emergency, at a utility request, and during generator testing.

    Zoning Ordinance Section 7.05.03, Table 7.05.03-1

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Zoning Ordinance pp. 486-487, Section 7.05.03, Table 7.05.03-1; measurement at subsection C; exemptions at subsection E

  • Development ruleIn effectDec 13, 2023Loudoun County

    Noise studies and acoustical screening required for data centers

    Covered projects must file a pre construction noise study at site plan review and a post construction noise study between 1 and 12 months after the first certificate of occupancy, each prepared by a Virginia licensed professional engineer and checked against the Table 7.05.03-1 limits at the nearest point of each property line. For data centers next to residential property, exterior mechanical equipment must be screened on all four sides by an acoustical barrier built with sound proofing material.

    Zoning Ordinance Section 7.05.03.G and Section 4.06.02.D.10

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Zoning Ordinance p. 487, Section 7.05.03.G; pp. 283-287, Section 4.06.02.D.10

  • Setback ruleIn effectDec 13, 2023Loudoun County

    Setbacks and building massing for data centers next to residential property

    When a data center property sits next to residential property, including across a principal arterial or lesser road, structures must be at least 200 feet from the shared property line and parking at least 50 feet from it. The parking setback must keep existing forest and natural screening undisturbed, or use berms at least 10 feet high with 10 foot tall fencing and plantings on top. A building within 400 feet of the residential line needs height changes at set intervals and a step back of at least 15 feet starting at the top of the second story or 40 feet, whichever is lower.

    Zoning Ordinance Section 4.06.02.D.7

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Zoning Ordinance pp. 283-287, Section 4.06.02.D.7

  • Development ruleIn effectDec 13, 2023Loudoun County

    Facade design standards for data center buildings

    Principal facades of a data center must use differentiated surfaces at set intervals, and fenestration must cover at least 30 percent of the principal facade surface. A screened mechanical equipment facade may stand in for one required principal facade facing a public road, and each building must include at least one main entrance feature.

    Zoning Ordinance Section 4.06.02.C

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Zoning Ordinance p. 284, Section 4.06.02.C

  • Public decisionApprovedMar 14, 2023Town of Leesburg, Virginia

    Town of Leesburg, Virginia, Town Council Agenda Item 13b, March 14, 2023

    Approved 6-1 (Council Member Wilt in opposition): extension of Town water and sanitary sewer service to the proposed data center at Compass Creek, conditioned on the owner's written consent to annexation or boundary adjustment, execution of a water and wastewater service agreement, payment of all construction costs, and an average-demand cap of 1,600 gallons per day for the two buildings

    Stated in the filing:
    1,600 gallons per day, average water demand cap for the two buildings combined (800 gallons per day each), office operations only
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Agenda, Town Council Meeting, March 14, 2023, Item 13b, 'Water and Sewer Service Extension Request for Data Center at Compass Creek' (Granicus AgendaViewer, clip 2000), and the meeting's official webcast captions; the approval and its water volumes are also documented in the Town's filing at Utilities para. 32 of the Commission on Local Government report (April 30, 2024)

  • Recorded voteMar 14, 2023Leesburg Town Council

    Approval of water and sanitary sewer service extension to the data center at Compass Creek (Agenda Item 13b)

    6 yes, 1 no. Ara Bagdasarian (Council Member): yes; Kari Nacy (Council Member): yes; Kelly Burk (Mayor): yes; Neil R. Steinberg (Vice Mayor): yes; Patrick J. Wilt (Council Member): no; Todd A. Cimino-Johnson (Council Member): yes; Zach Cummings (Council Member): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Town Council meeting, March 14, 2023, Agenda Item 13b; official webcast captions (Granicus clip 2000): motion to approve the proposed resolution, seconded by Vice Mayor Steinberg; announced result 6-1 with Council Member Wilt in opposition. All seven members voted (the evening's other announced tallies are 7-0)

2022

  • Recorded voteApr 13, 2022Loudoun County Board of Supervisors

    Forward ZCPA-2020-0003, True North Data, to the May 17, 2022 Board of Supervisors Business Meeting for action

    5 yes, 2 no, 2 absent. Caleb A. Kershner (Supervisor): yes; Juli E. Briskman (Supervisor): absent; Koran T. Saines (Supervisor): yes; Kristen C. Umstattd (Supervisor): yes; Matthew F. Letourneau (Supervisor): absent; Michael R. Turner (Supervisor): yes; Phyllis J. Randall (Chair): no; Sylvia R. Glass (Supervisor): yes; Tony Buffington (Supervisor): no.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Action Report of the April 13, 2022, Board of Supervisors Public Hearing, Item 10 (p. 3)

2020

  • Recorded voteDec 10, 2020Loudoun County Planning Commission

    Forward ZCPA-2020-0003, True North Data, to the Board of Supervisors with a recommendation of approval

    5 yes, 3 no, 1 absent. Ad Barnes (Member): no; Eric Combs (Chair): yes; Forest Hayes (Vice Chair): yes; Jane Kirchner (Member): no; Jeff Salmon (Member): yes; John Merrithew (Member): absent; Mark Miller (Member): yes; Michelle Frank (Member): yes; Roger Vance (Member): no.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Minutes, Loudoun County Planning Commission Work Session, December 10, 2020, Item 3 (pp. 5-6) and the meeting roster (p. 1)

2019

  • Stormwater permitIssuedJul 1, 2019Virginia Department of Environmental Quality

    Virginia Department of Environmental Quality, VAR10T460

    Construction general permit coverage (VAR10), Data Centers at Compass Creek, at Compass Creek Parkway, Leesburg; operator of record SI NVA06A, LLC; coverage reissued for the cycle July 1, 2024 to June 30, 2029

    Development acres:
    24.2 acres
    Disturbed acres:
    24.2 acres
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    DEQ EDMA Stormwater Permits layer (MapServer layer 303), records for PERMIT_NUMBER VAR10T460: Compass Creek Parkway, Leesburg, VA; development 24.2 acres, disturbed 24.2 acres; coverage cycles effective 2019-07-01 and 2024-07-01, statuses PER_ISSUED and PER_REISS

No date in the record(rules in force and undated records)

  • Public decisionFiledNo date in the recordLoudoun County, Virginia

    Loudoun County, Virginia, MCPI 234371847000

    County Existing Data Center Parcels layer record for the Compass Creek (NVA06) parcel: Project COMPASS CREEK, owner of record SI NVA06B LLC, 33.176 legal acres, two data center buildings totaling 621,036 sq ft (388,150 and 232,886 sq ft), policy area TOWN (Town of Leesburg), county building permits BLDC-2024-011260 and BLDC-2024-032400, status Existing / BUILT-UNDER CONSTRUCTION

    Parcel acres:
    33.176 acres
    Stated in the filing:
    621,036 square feet of data center buildings on the parcel (Overall_SQ_FT: 388,150 + 232,886, two buildings), Loudoun County Existing Data Center Parcels layer, MCPI 234371847000
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Loudoun County Existing Data Center Parcel feature layer (Existing_DC_Parcels_March1), record OBJECTID_1 78, MCPI 234371847000, queried 2026-11-09

  • Zoning ruleProposedNo date in the recordLoudoun County

    Phase 2 data center standards and locations, project plan approved, amendments not adopted

    Phase 2 is the follow on round of data center standards and location rules for Loudoun County. The Board approved the project plan on 2025-09-16 and draft text was released at the end of September 2025, but no source read shows the amendments adopted; the county noise page states amendments are anticipated in spring or summer 2027.

    CPAM-2025-0001 and ZOAM-2025-0001 (Data Center Standards and Locations Phase 2)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    County project plan pages; Board TLUC report hosted on loudoun.granicus.com

  • Utility proceedingIn effectNo date in the recordVirginia State Corporation Commission

    Schedule HV-1, Large Power Dedicated Distribution Service

    Service from 115 kV facilities at delivery voltage of 12.5 kV or more, for new or additional separately metered load of at least 5,000 kW with an average annual load factor of at least 70 percent. An Electric Service Agreement is required. Billing demand is the highest of the month's maximum 30-minute demand, 5,000 kW, or the contract minimum demand. Excess facilities are charged monthly (1.37 percent substation, 1.17 percent line) or paid up front as a contribution in aid of construction at reduced monthly rates.

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Schedule HV-1 (filed for informational purposes 2023-03-22, effective 2023-04-01), Availability, Billing Demand, and Excess Facilities Charge sections

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
    Virginia Commission on Local Government (Department of Housing and Community Development)
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Leesburg Town Council Approves Voluntary Settlement Agreement Related to Compass Creek Annexation
    Town of Leesburg, Virginia
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Existing Data Center Parcels (county GIS layer), records for MCPI 044261032000 (Pacific Boulevard, Sterling) and MCPI 234371847000 (Compass Creek, Leesburg)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Stationary Source Permit to Construct and Operate (combined document, February 11, 2026), SI NVA06A, LLC, Registration No. 74269
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Issued Air Permits for Data Centers (list as of January 29, 2026)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-08 · Open the source
  6. 6
    Town Council Meeting, March 14, 2023: agenda and official webcast captions
    Town of Leesburg, Virginia (Granicus webcast archive)
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Stormwater Permits (Daily), EDMA MapServer layer 303
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Loudoun County Zoning Ordinance (official text, eReader)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  9. 9
    Land Use Considerations (county data center page)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  10. 10
    Order for Notice and Hearing, Case No. PUR-2026-00114 (NOVEC terms and conditions revisions)
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  11. 11
    Schedule HV-1, Large Power Dedicated Distribution Service
    Northern Virginia Electric Cooperative
    Tier 1 · Captured 2026-11-07 · Open the source
  12. 12
    Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
    Loudoun County Planning Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  13. 13
    Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
    Loudoun County
    Tier 1 · Captured 2026-11-09 · Open the source
  14. 14
    Town Council Meeting, February 27, 2024: agenda and official webcast captions
    Town of Leesburg, Virginia (Granicus webcast archive)
    Tier 1 · Captured 2026-11-09 · Open the source
  15. 15
    Board of Supervisors Business Meeting Minutes, March 18, 2025
    Loudoun County
    Tier 1 · Captured 2026-11-07 · Open the source
  16. 16
    Loudoun County Board of Equalization 2025 Annual Report
    Loudoun County Board of Equalization
    Tier 1 · Captured 2026-11-09 · Open the source
  17. 17
    STACK Infrastructure Expands Loudoun County Footprint with 144MW Hyperscale Campus
    STACK Infrastructure
    Tier 4 · Captured 2026-11-08 · Open the source
  18. 18
    Stationary Source Permit to Construct and Operate (combined document, as amended August 21, 2025), SI NVA01 ABS, LLC, Registration No. 74079
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  19. 19
    EDMA Active Air Sites layer (MapServer layer 294), facility records for STACK Infrastructure registrations in Virginia (74079, 74269, 74224, 74246, 74291)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  20. 20
    Northern Virginia market page and campus index
    STACK Infrastructure
    Tier 4 · Captured 2026-11-09 · Open the source
  21. 21
    NVA06 Campus, Northern Virginia
    STACK Infrastructure
    Tier 4 · Captured 2026-11-09 · Open the source