Skip to content

Project File · Public records

Every public record we have for NTT Hillsboro data center campus

Hillsboro, Washington County, OregonOperatingFirst public 2020Filing entity: NTT Global Data Centers HI, LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

3 of 15 records · showing power and utility only ·

2025

  • Utility proceedingIn effectMar 7, 2025Public Utility Commission of Oregon

    Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I

    Order No. 26-154 (entered May 7, 2026) adopted PGE's Schedule 96 with modifications. Schedule 96 is a separate rate schedule for large nonresidential customers at or above 20 MW whose end use is data processing, created under HB 3546 (2025), the POWER Act. Customers bill transmission and generation demand at no less than 90 percent of contracted capacity; the distribution charge is billed flat at 100 percent of the cost to expand the distribution system; exceedance penalties apply above contracted capacity; minimum contract lengths and exit fees apply under the Large Load Customer Agreement, whose Rule I threshold the order lowered to 20 MW. Schedule 96 customers with 100 MW or more of allocated system capacity pay a surcharge of 1 cent per kWh, with the revenue supporting programs that offset costs for residential and low-income customers. The compliance tariff (Advice No. 26-24) took effect for service on and after July 8, 2026.

    UM 2377

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Order No. 26-154, entered 05/07/2026: caption and disposition (Schedule 96 adopted with modifications); Background (docket opened at the March 7, 2025 Regular Public Meeting); summary of stipulation terms (90 percent of contracted capacity; 1-cent per kWh surcharge at 100 MW or more; Rule I LLCA threshold lowered to 20 MW). Commission release PR-202609 (Schedule 96 created under HB 3546). Compliance tariff effective date July 8, 2026 per the Q5 WG1 notes on Advice No. 26-24.

2023

  • Utility proceedingIn effectDec 1, 2023Public Utility Commission of Oregon

    Investigation into New Load Connection Costs (Advice No. 24-38, revisions to Rule C and Rule I)

    PGE's Advice No. 24-38 revised Rule C (conditions for customer attachments to facilities) and Rule I (line extensions) for new large load connections, including facilities studies and an interconnection queue. Order No. 25-091 (March 6, 2025) suspended the original filing and ordered the further investigation that became UM 2377; the Commission then approved the Advice 24-38 changes with less than statutory notice, effective for service on and after April 16, 2025, on an interim, changeable basis. Every Customer Service Contract signed after that effective date is expressly subject to change based on the final orders in UE 430 and UM 2377, where the minimum transmission demand, capacity exceedance penalty, and exit fee questions were reserved.

    UE 430

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    OPUC Staff Report, public meeting April 15, 2025 (report dated April 4, 2025): staff recommendation to approve Advice No. 24-38 with less than statutory notice, effective for service on and after April 16, 2025; Rule C subject heading. Interim and subject-to-change character per the Q5 WG1 notes summarizing Order No. 25-091.

2021

  • Utility proceedingDecidedNov 3, 2021Public Utility Commission of Oregon

    Joint petition of PGE and QTS Investment Properties Hillsboro, LLC to increase Green Tariff Customer Supply Option capacity (GEAR, Schedule 55)

    Order No. 21-468 (December 20, 2021) adopted staff's recommendation and authorized 250 MW of additional Customer Supply Option nameplate capacity under PGE's green tariff, requested for load growth at the QTS Hillsboro campus, including facilities Facebook (Meta) planned to lease.

    UM 2202

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Order No. 21-468 disposition and staff report summary; joint petition paras. 5-10

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Standard Air Contaminant Discharge Permit No. 34-0235-ST-01, NTT Global Data Centers HI, LLC, Hillsboro
    Oregon Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    NTT DATA land acquisitions in seven markets (Mesa, Arizona campus announcement)
    NTT DATA
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    Addendum R-02 to Standard ACDP No. 34-0235-ST-01 (NTT Global Data Centers HI, LLC)
    Oregon Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    NTT expands its data center footprint by 20% (2021-09-01)
    NTT Group
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    NTT Ltd. to Expand U.S. Data Center Footprint to Hillsboro, Oregon (Business Wire release, 2020-02-05, republished)
    NTT Ltd.
    Tier 4 · Captured 2026-11-08 · Open the source
  6. 6
    Part A - Enterprise Zone Business Projects - 2026 Exemptions on Qualified Property
    Business Oregon (Oregon Business Development Department), published on data.oregon.gov
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Part A - Enterprise Zone Business Projects - 2025 Exemptions on Qualified Property
    Business Oregon (Oregon Business Development Department), published on data.oregon.gov
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Part A - Enterprise Zone Business Projects - 2024 Exemptions on Qualified Property
    Business Oregon (Oregon Business Development Department), published on data.oregon.gov
    Tier 1 · Captured 2026-11-09 · Open the source
  9. 9
    Petition for Writ of Review and Complaint for Declaratory and Injunctive Relief, 1000 Friends of Oregon et al. v. City of Hillsboro et al., Case No. 26CV30954 (filed 2026-06-22)
    Circuit Court of the State of Oregon for the County of Washington
    Tier 1 · Captured 2026-11-09 · Open the source
  10. 10
    Q&A: Enterprise Zone Agreements with Data Centers in Hillsboro
    City of Hillsboro, Oregon
    Tier 1 · Captured 2026-11-09 · Open the source
  11. 11
    Staff Report No. 5 and attachments: Community Development Code Amendments Case File CDCA-004-26 Data and Energy Storage
    City of Hillsboro Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  12. 12
    Resolution No. 2932 (signed copy), data center and battery storage moratorium
    City of Hillsboro, Oregon (CivicWeb host)
    Tier 1 · Captured 2026-11-10 · Open the source
  13. 13
    Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity (UM 2202)
    Public Utility Commission of Oregon (joint filing of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC)
    Tier 1 · Captured 2026-11-09 · Open the source
  14. 14
    Order No. 21-468, UM 2202 (entered December 20, 2021)
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-09 · Open the source
  15. 15
    Staff Report, Portland General Electric Investigation into New Load Connection Costs, Docket UE 430 / Advice No. 24-38
    Staff of the Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  16. 16
    Order No. 26-154, Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I, Docket UM 2377
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  17. 17
    Oregon PUC Approves New Rate Structure to Protect Customers Amid Rapid Data Center Growth
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  18. 18
    Cleaner Air Oregon Facility Status map data (August 2026 edition)
    Oregon Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  19. 19
    EPA ICIS facility interest record: NTT -HI1 DATA CENTER, Hillsboro, Oregon
    U.S. Environmental Protection Agency (Envirofacts / ICIS)
    Tier 1 · Captured 2026-11-09 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page