Skip to content

Project File · Public records

Every public record we have for Novva West Jordan data center campus

West Jordan, Salt Lake County, UtahExpandingFirst public 2021Filing entity: Novva SLC Common, LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

2 of 22 records · showing environmental permits only ·

2024

  • Air permitIssuedDec 19, 2024Utah Division of Air Quality

    Utah Division of Air Quality, DAQE-AN160660003-24 (Project N160660003)

    Approval Order issued: modification to install 72 new natural gas-fired generator engines providing primary power for the two new data center buildings, with updates to the diesel emergency fleet; supersedes DAQE-AN160660001-22

    Generator engines diesel emergency count:
    37 engines
    Emergency engine operating cap:
    42 hours per rolling 12 months, per engine, outside emergencies
    Generator engine unit rating:
    3,271.8 kW per engine
    Emergency engine testing rule:
    At most 2 engines at one time, tested only between 7:00 a.m. and 7:00 p.m.
    Prior approval order:
    DAQE-AN160660001-22, dated February 23, 2022
    Potential emissions co2e total:
    997,261 tons per year (total potential to emit)
    Source classification change:
    Reclassified as a major CO and HAP source subject to Title V
    Permit site coordinates utm:
    411,485 m Easting; 4,491,982 m Northing; NAD83, UTM Zone 12
    Emission reduction credits required:
    47 tons per year of NOx
    Generator engines natural gas count:
    72 engines
    Potential emissions nox total:
    51.28 tons per year (total potential to emit)
    Gas engines function:
    Primary power for the two new data center buildings (phases 2 and 3)
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Approval Order DAQE-AN160660003-24 (reused staged source; document read firsthand this pass)

  • Air permitReplaced by a later filingNov 13, 2024Utah Division of Air Quality

    Utah Division of Air Quality, DAQE-IN160660003-24

    Intent to Approve issued for public review; legal notice published November 17, 2024 with comments due December 17, 2024

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Intent to Approve DAQE-IN160660003-24, cover letter and draft order

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    CIM Group & Novva Data Centers Secure $2B to Expand Sustainable Data Centers in the Western U.S.
    CIM Group and Novva Data Centers
    Tier 4 · Captured 2026-11-08 · Open the source
  2. 2
    West Jordan's $2B Data Boost: How NOVVA's Expansion Benefits You
    City of West Jordan
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Minutes of the Regular Meeting of the West Jordan Planning and Zoning Commission, January 7, 2025
    City of West Jordan (filed on the Utah Public Notice Website)
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    City of West Jordan utility billing statement, Novva Holdings, LLC account, service period Dec 9, 2024 - Jan 10, 2025
    City of West Jordan (posted by Novva Data Centers)
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    City of West Jordan utility billing statement, Novva Holdings, LLC account, service period Nov 14 - Dec 10, 2025
    City of West Jordan (posted by Novva Data Centers)
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Utah Data Center | Salt Lake City Colocation (West Jordan campus page)
    Novva Data Centers
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Intent to Approve DAQE-IN160660003-24: Modification to Approval Order DAQE-AN160660001-22 to Install New Power Generation Engines
    Utah Division of Air Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Approval Order DAQE-AN160660003-24: Modification to Approval Order DAQE-AN160660001-22 to Install New Power Generation Engines, Novva SLC Common, LLC - West Jordan Data Center
    Utah Division of Air Quality
    Tier 1 · Captured 2026-11-08 · Open the source
  9. 9
    Novva's Year in Review (Utah flagship grand opening, September 2021)
    Novva Data Centers
    Tier 4 · Captured 2026-11-08 · Open the source
  10. 10
    Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
    PacifiCorp d/b/a Pacific Power & Light Company
    Tier 1 · Captured 2026-11-08 · Open the source
  11. 11
    Settlement Stipulation, Docket No. 26-035-05, Application of Rocky Mountain Power for Approval of Large-Load Service Contract between PacifiCorp and a Large-Load Customer
    Public Service Commission of Utah (filing by Rocky Mountain Power with the Division of Public Utilities and the Office of Consumer Services)
    Tier 1 · Captured 2026-11-08 · Open the source
  12. 12
    Notice of Decisions on UAE motion and approval of the Settlement Stipulation, Docket No. 26-035-05
    Public Service Commission of Utah
    Tier 1 · Captured 2026-11-08 · Open the source
  13. 13
    Rocky Mountain Power advances Utah's Operation Gigawatt through landmark energy agreement
    Rocky Mountain Power (PacifiCorp)
    Tier 4 · Captured 2026-11-08 · Open the source
  14. 14
    Notice of Comment Period, Docket Nos. 25-R318-01 and 24-035-43 (large load flexible tariff guidance; R746-318 New Rule)
    Public Service Commission of Utah
    Tier 1 · Captured 2026-11-08 · Open the source
  15. 15
    Rocky Mountain Power Idaho Electric Service Schedule No. 400, Special Contract (I.P.U.C. No. 1, Thirteenth Revision of Sheet No. 400.1)
    Rocky Mountain Power (PacifiCorp)
    Tier 1 · Captured 2026-11-08 · Open the source
  16. 16
    Final Order No. 35277, Case No. PAC-E-21-07 (Rocky Mountain Power Idaho rate case)
    Idaho Public Utilities Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  17. 17
    Order No. 23-472, PacifiCorp Revision of Rule 13 Line Extension Policy, Docket UE 424
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  18. 18
    Rocky Mountain Power Wyoming Electric Service Schedule No. 400, Special Contracts (P.S.C. Wyoming No. 19, Original Sheets 400-1 to 400-3)
    Rocky Mountain Power (PacifiCorp)
    Tier 1 · Captured 2026-11-08 · Open the source
  19. 19
    Public notice of Rocky Mountain Power application to establish Tariff Schedule 400, Special Contracts, Docket No. 20000-602-ET-21 (legal notice as published July 13, 2021)
    Wyoming Public Service Commission (notice published in the Kemmerer Gazette)
    Tier 1 · Captured 2026-11-08 · Open the source
  20. 20
    PacifiCorp Reply Testimony of Craig M. Eller, Oregon Docket No. UE 463, Exhibit PAC/200
    PacifiCorp
    Tier 1 · Captured 2026-11-08 · Open the source
  21. 21
    Memorandum to service list in Docket No. 25-R318-01 with Charles River Associates clarification and guidance on the initial SB 132 rules
    Public Service Commission of Utah
    Tier 1 · Captured 2026-11-08 · Open the source
  22. 22
    Utah Code Title 54, Chapter 26, Part 1, General Provisions (Large-Scale Electric Service Requirements), effective May 7, 2025
    Utah State Legislature
    Tier 1 · Captured 2026-11-08 · Open the source
  23. 23
    Utah Code Section 54-26-301, Large load contract requirements, effective May 7, 2025
    Utah State Legislature
    Tier 1 · Captured 2026-11-08 · Open the source
  24. 24
    PUC Cuts PacifiCorp's Requested January 1 General Rate Increase (UE 433 decision release)
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  25. 25
    Staff Opening Testimony (Staff/100), Docket UE 463
    Staff of the Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  26. 26
    Data Center Coalition Opening Testimony of Bieber, Docket UE 463
    Data Center Coalition (filed in Public Utility Commission of Oregon Docket UE 463)
    Tier 1 · Captured 2026-11-08 · Open the source
  27. 27
    Staff Report, Portland General Electric Investigation into New Load Connection Costs, Docket UE 430 / Advice No. 24-38
    Staff of the Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  28. 28
    Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
    PacifiCorp d/b/a Pacific Power
    Tier 1 · Captured 2026-11-08 · Open the source
  29. 29
    UTC Case Docket Detail Page, Docket UE-231037 (PacifiCorp, Advice 23-06)
    Washington Utilities and Transportation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  30. 30
    PacifiCorp Advice 23-06 cover letter and Rule 14 tariff sheets, Docket UE-231037
    PacifiCorp d/b/a Pacific Power & Light Company (filed with the Washington Utilities and Transportation Commission)
    Tier 1 · Captured 2026-11-08 · Open the source
  31. 31
    Alliance of Western Energy Consumers filing in Docket No. UE 463
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-07 · Open the source
  32. 32
    PacifiCorp Surrebuttal Testimony of Robert M. Meredith, Docket No. UE 463, with Exhibit PAC/301 (Revised Schedule 401)
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-07 · Open the source
  33. 33
    Stipulation, Docket No. UE 463, Advice No. 25-015, Schedule 401
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-11 · Open the source
  34. 34
    ALJ Ruling, Docket UM 2410 (Amazon Data Services, Inc. v. PacifiCorp)
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  35. 35
    Third Joint Status Report and Motion to Extend Suspension of Procedural Schedule, Docket UM 2410
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-11 · Open the source
  36. 36
    Banks Loan $2 Billion to Build a 100-Acre AI Data Center in Utah (CIM Group and Novva announcement, March 2025, republished)
    CIM Group and Novva Data Centers (via Dow Jones newswires)
    Tier 4 · Captured 2026-11-08 · Open the source
  37. 37
    Spanish Fork City Council meeting materials, August 18, 2026 (data center comparison appendix naming Novva West Jordan)
    City of Spanish Fork (filed on the Utah Public Notice Website)
    Tier 1 · Captured 2026-11-09 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page