Every public record we have for Meta Jeffersonville Data Center
Jeffersonville, Clark County, IndianaUnder constructionFirst public 2024Last checked Nov 8, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
4 of 10 records · showing land and zoning rules only ·
2026
Development ruleIn effectAug 3, 2026Jeffersonville
One year moratorium on new data center development
The moratorium halts new data center development in the city for one year while the Plan Commission drafts permanent zoning rules for the Unified Development Ordinance. The administration proposed six months and the council extended it to a full year. It does not affect the Meta data center under construction at the River Ridge Commerce Center, because the River Ridge Development Authority holds zoning authority over that land under a long standing interlocal agreement, and the city's own 2026 zoning update handout confirms data center zoning is being handled in a separate later ordinance because of the moratorium.
Ordinance Establishing a Temporary Moratorium on New Data Centers (ordinance number not published in the sources read)
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Article text on the 2026-08-03 council action; handout statement that the UDO revision "will NOT address the zoning of data centers that are currently under a moratorium"
2007
Zoning ruleIn effectDec 18, 2007Clark County
Data processing or analysis is a permitted use in the M1 Light Industrial district, and in M2 through the M1 list
The M1 Light Industrial district permits, by right, engineering or research laboratories, vocational or industrial training facilities, and data processing or analysis, along with a catch all for other comparable and compatible uses. The M2 Heavy Industrial district permits any use permitted in the M1 district, except day care centers and churches, so the same data processing use carries into M2. The county code has no definition of data center or data processing center, so a modern data center would rest on this data processing wording or the comparable use clause.
Clark County Code of Ordinances, Section 156.28(B)(2) (M1 Light Industrial); M2 permitted uses incorporate the M1 list
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Section 156.28(B)(2) and (B)(20); M2 Heavy Industrial permitted use (a), "Any use permitted in the M1 district"
Setback ruleIn effectDec 18, 2007Clark County
A 250 foot setback where an M1 lot faces or abuts residential zoning, plus road based front setbacks and a height rule
Where a front, side, or rear industrial lot line faces land zoned A1, RP, R1, or R2 across a street, or abuts any of those districts, the minimum setback is 250 feet, and that area may be used only for driveways and parking and must be landscaped with opaque fencing and natural buffer material. Front setbacks otherwise run from the road by road class, and building height is capped at 40 feet unless extra setback is traded for height up to 100 feet.
Clark County Code of Ordinances, Section 156.28(E) and Section 156.28(G) (M1 Light Industrial)
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Section 156.28(E)(1) front setbacks, (E)(3) residential proximity setback, (F) landscaping and buffering, (G) height restrictions
No date in the record(rules in force and undated records)
Development ruleIn effectNo date in the recordJeffersonville
Commercial generators must be enclosed and screened; no testing, fuel, or emissions rules found
The UDO treats commercial generators as accessory structures and requires generators and mechanical equipment over the size threshold to be enclosed and screened, with screening on all sides by a fence or wall built to match the primary building. The ordinance sets no generator testing hours, fuel rules, emissions limits, or generator noise limits in the text searched. The UDO contains no data center use at all: full text searches for "data center" and "data processing" returned no hits.
Jeffersonville Unified Development Ordinance (2021, revised 2025-06-02), Article 7 accessory structure and screening standards (Section 7.19 MC-02 screening standard referenced in the text)
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
UDO AS-01(E) and MC-02: generators and mechanical equipment over the footprint threshold must be enclosed and screened
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Common Council Regular Meeting Minutes, September 19, 2022
City of JeffersonvilleTier 1 · Captured 2026-11-07 · Open the source - 2Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities
Lawrence Berkeley National LaboratoryTier 2 · Captured 2026-11-07 · Open the source - 3Gov. Holcomb announces Meta to build an $800M Data Center Campus in Indiana (IEDC release, January 25, 2024)
Indiana Economic Development Corporation (via GlobeNewswire)Tier 4 · Captured 2026-11-08 · Open the source - 4Clark County, Indiana Code of Ordinances, Section 156.28 (M1 Light Industrial)
Clark County, Indiana (American Legal Publishing)Tier 1 · Captured 2026-11-07 · Open the source - 5Jeffersonville Unified Development Ordinance (revised September 9, 2026)
City of JeffersonvilleTier 1 · Captured 2026-11-08 · Open the source - 6Jeffersonville passes year-long data center moratorium
WDRB / WAVE (Louisville)Tier 3 · Captured 2026-11-07 · Open the source - 72026 Zoning Update handout
City of Jeffersonville, IndianaTier 1 · Captured 2026-11-07 · Open the source - 8Jeffersonville data center zoning explained: How Meta got approved
Rural News NetworkTier 3 · Captured 2026-11-07 · Open the source - 9
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page