Skip to content

Draft research. Every default and project value comes from our research files and has not passed verification yet.

How many homes use as much electricity as a data center?

Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.

Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona

Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.

The address holds your inputs, so a link shows the same calculation.

Start from

Your data centers

Pick as many as you like. The one marked main drives the big result.

  • NTT Hillsboro data center campusWashington County, Oregon

NTT Hillsboro data center campus: Operating. Announced capacity 126 MWPortland General Electric Co sells no power to homes in federal data, so homes use the state average.

Fine-tune every input
How hard it runs, percent of capacity (low, likely, high)
Overhead multiplier, used only for computer-equipment figures

About as much electricity in a year as

60,600 to 85,000 homes

Most likely about 79,700 homes in Oregon, for NTT Hillsboro data center campus at 126 MW.

Yearly electricity: about 828 GWh (range 629 to 883 GWh).

Precision: Fair2 of 4

  • Capacity: From our records, with a source.
  • Local homes: State average. Utility data would be sharper.
  • What kind of facility: Facility type and what the MW figure measures narrow the range.
  • Measured use: The operator's own reported yearly electricity for this site would replace our estimate. None in our records yet.

Estimated range. Not a forecast, and not a bill.

Your data centers, side by side

Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.

Selected data centers compared
Data centerCapacityHomes (likely)Yearly GWhCompared with
NTT Hillsboro data center campusMain126 MW79,700828Oregon
Together79,700828Each site against its own local homes.

How it works

  1. Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier. 126 MW × 1 = 126 MW (likely)
  2. Yearly electricity: facility power times 8,760 hours times how hard it runs. 126 MW × 8,760 h × 75% = 827,820 MWh
  3. Homes: that total divided by what one home uses in a year. 827,820 MWh ÷ 10.390 MWh = 79,675 homes (shown rounded)

This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.

Sources

  1. 1
    Form EIA-861 final 2025 detailed data files
    U.S. Energy Information Administration
    Tier 1 · Open the source
  2. 2
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  3. 3
    Standard Air Contaminant Discharge Permit No. 34-0235-ST-01, NTT Global Data Centers HI, LLC, Hillsboro
    Oregon Department of Environmental Quality
    Tier 1 · Open the source
  4. 4
    NTT Ltd. to Expand U.S. Data Center Footprint to Hillsboro, Oregon (Business Wire release, 2020-02-05, republished)
    NTT Ltd.
    Tier 4 · Open the source
  5. 5
    NTT expands its data center footprint by 20% (2021-09-01)
    NTT Group
    Tier 4 · Open the source
  6. 6
    Addendum R-02 to Standard ACDP No. 34-0235-ST-01 (NTT Global Data Centers HI, LLC)
    Oregon Department of Environmental Quality
    Tier 1 · Open the source
  7. 7
    Cleaner Air Oregon Facility Status map data (August 2026 edition)
    Oregon Department of Environmental Quality
    Tier 1 · Open the source
  8. 8
    EPA ICIS facility interest record: NTT -HI1 DATA CENTER, Hillsboro, Oregon
    U.S. Environmental Protection Agency (Envirofacts / ICIS)
    Tier 1 · Open the source
  9. 9
    Petition for Writ of Review and Complaint for Declaratory and Injunctive Relief, 1000 Friends of Oregon et al. v. City of Hillsboro et al., Case No. 26CV30954 (filed 2026-06-22)
    Circuit Court of the State of Oregon for the County of Washington
    Tier 1 · Open the source
  10. 10
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Open the source
  11. 11
    Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
    Uptime Institute
    Tier 2 · Open the source

Questions people ask

How many homes use as much electricity as a data center?
About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
How many homes does 1 MW of data center power equal?
About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
Is a data center's MW figure what it actually uses?
No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
Why does the answer change by utility?
Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.

Embed this calculator

Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.

<iframe src="https://datacenterfactcheck.org/calculators/mw-to-homes/embed" title="MW to homes calculator" width="100%" height="640" loading="lazy"></iframe>