How many homes use as much electricity as a data center?

Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.

Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona

Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.

The address holds your inputs, so a link shows the same calculation.

Start from

Your data centers

Pick as many as you like. The one marked main drives the big result.

  • Novva West Jordan data center campusSalt Lake County, Utah

Novva West Jordan data center campus: Expanding. Announced capacity 175 MW

Fine-tune every input
How hard it runs, percent of capacity (low, likely, high)
Overhead multiplier, used only for computer-equipment figures

About as much electricity in a year as

83,000 to 116,500 homes

Most likely about 109,300 homes served by PacifiCorp, for Novva West Jordan data center campus at 175 MW.

Yearly electricity: about 1,150 GWh (range 874 to 1,226 GWh).

Precision: Fair2 of 4

  • Capacity: From our records, with a source.
  • Local homes: Homes served by the same utility.
  • What kind of facility: Facility type and what the MW figure measures narrow the range.
  • Measured use: The operator's own reported yearly electricity for this site would replace our estimate. None in our records yet.

Estimated range. Not a forecast, and not a bill.

Your data centers, side by side

Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.

Selected data centers compared
Data centerCapacityHomes (likely)Yearly GWhCompared with
Novva West Jordan data center campusMain175 MW109,3001,150Homes served by PacifiCorp
Together109,3001,150Each site against its own local homes.

How it works

  1. Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier. 175 MW × 1 = 175 MW (likely)
  2. Yearly electricity: facility power times 8,760 hours times how hard it runs. 175 MW × 8,760 h × 75% = 1,149,750 MWh
  3. Homes: that total divided by what one home uses in a year. 1,149,750 MWh ÷ 10.524 MWh = 109,250 homes (shown rounded)

This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.

Sources

  1. 1
    Form EIA-861 final 2025 detailed data files
    U.S. Energy Information Administration
    Tier 1 · Open the source
  2. 2
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  3. 3
    Approval Order DAQE-AN160660003-24: Modification to Approval Order DAQE-AN160660001-22 to Install New Power Generation Engines, Novva SLC Common, LLC - West Jordan Data Center
    Utah Division of Air Quality
    Tier 1 · Open the source
  4. 4
    CIM Group & Novva Data Centers Secure $2B to Expand Sustainable Data Centers in the Western U.S.
    CIM Group and Novva Data Centers
    Tier 4 · Open the source
  5. 5
    Utah Data Center | Salt Lake City Colocation (West Jordan campus page)
    Novva Data Centers
    Tier 1 · Open the source
  6. 6
    Novva's Year in Review (Utah flagship grand opening, September 2021)
    Novva Data Centers
    Tier 4 · Open the source
  7. 7
    Banks Loan $2 Billion to Build a 100-Acre AI Data Center in Utah (CIM Group and Novva announcement, March 2025, republished)
    CIM Group and Novva Data Centers (via Dow Jones newswires)
    Tier 4 · Open the source
  8. 8
    Intent to Approve DAQE-IN160660003-24: Modification to Approval Order DAQE-AN160660001-22 to Install New Power Generation Engines
    Utah Division of Air Quality
    Tier 1 · Open the source
  9. 9
    Minutes of the Regular Meeting of the West Jordan Planning and Zoning Commission, January 7, 2025
    City of West Jordan (filed on the Utah Public Notice Website)
    Tier 1 · Open the source
  10. 10
    West Jordan's $2B Data Boost: How NOVVA's Expansion Benefits You
    City of West Jordan
    Tier 1 · Open the source
  11. 11
    City of West Jordan utility billing statement, Novva Holdings, LLC account, service period Dec 9, 2024 - Jan 10, 2025
    City of West Jordan (posted by Novva Data Centers)
    Tier 1 · Open the source
  12. 12
    City of West Jordan utility billing statement, Novva Holdings, LLC account, service period Nov 14 - Dec 10, 2025
    City of West Jordan (posted by Novva Data Centers)
    Tier 1 · Open the source
  13. 13
    Spanish Fork City Council meeting materials, August 18, 2026 (data center comparison appendix naming Novva West Jordan)
    City of Spanish Fork (filed on the Utah Public Notice Website)
    Tier 1 · Open the source
  14. 14
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Open the source
  15. 15
    Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
    Uptime Institute
    Tier 2 · Open the source

Questions people ask

How many homes use as much electricity as a data center?
About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
How many homes does 1 MW of data center power equal?
About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
Is a data center's MW figure what it actually uses?
No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
Why does the answer change by utility?
Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.