Facility power and PUE calculator
How much power does a data center use beyond its computers?
Short answer: Multiply the computer equipment load by the site's PUE. Uptime Institute's 2024 survey found regional averages from 1.4 to 1.76, so a site draws about 1.4 to 1.76 times its computer load, the rest going mostly to cooling.
Data center power figures can mean the computer equipment alone or the whole site, including cooling. PUE (power usage effectiveness) links the two: total facility energy divided by the energy the computer equipment uses.
Total facility power
140 to 176 MW
Most likely about 156 MW for 100 MW of computer equipment.
Cooling, power conversion, and lighting add about 40 to 76 MW.
Estimated range from survey averages, not a measurement of any one site. A site's own reported PUE beats this.
Know both energy readings? Work out PUE
Use two readings over the same period, in the same unit (for example kWh for one year).
PUE appears here.
Published averages
A PUE of 1.0 would mean no overhead at all. Each figure is an average over many sites, so no single site is described by it.
| Average | PUE | Year | What it covers |
|---|---|---|---|
| EPRI, U.S. | 1.32 | 2024 | Average across U.S. data centers, weighted by capacity, estimated from facility data. |
| Berkeley Lab, U.S. | 1.40 | 2023 | Modeled average across all U.S. data centers. Large company-owned and rented-out sites averaged under 1.4. |
| Uptime Institute survey, global | 1.56 | 2024 | Average reported by survey respondents for their largest site. Regional averages ran from 1.40 to 1.76. |
How it works
facility power = IT load × PUE : 100 MW × 1.56 = 156 MW (likely).
PUE = total facility energy ÷ computer equipment energy
PUE changes with weather, load, and cooling design, so a yearly figure is the fairest comparison. Next: turn this into homes with the MW to homes calculator, or into heat with the heat and cooling calculator.
Sources
- 1Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
EPRITier 2 · Draft research, not yet verified · Open the source - 22024 United States Data Center Energy Usage Report (LBNL-2001637)
Lawrence Berkeley National LaboratoryTier 2 · Draft research, not yet verified · Open the source - 3Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
Uptime InstituteTier 2 · Draft research, not yet verified · Open the source
Questions people ask
- What is PUE?
- Power usage effectiveness: a data center's total energy divided by the energy its computer equipment uses. A PUE of 1.0 would mean no overhead at all; everything above 1.0 is cooling, power conversion, lighting, and other building loads.
- What is a good PUE?
- Lower is better. The published averages on this page run from 1.32 to 1.56, each with its source. A single site's own reported yearly PUE is the best figure for that site.
- Is an announced MW figure IT load or total power?
- Announcements rarely say. Filings with the utility or air agency usually state what the figure measures. When it is computer load only, multiply by PUE to get the power the whole site draws.
Calculator version 1.0. A change to the method gets a new version; the inputs are in the address, so a shared link shows the same result.
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Facility power and PUE calculator." Accessed 2026-11-29. https://datacenterfactcheck.org/calculators/facility-power
Embed this calculator
Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.
<iframe src="https://datacenterfactcheck.org/calculators/facility-power/embed" title="Facility power and PUE calculator" width="100%" height="640" loading="lazy"></iframe>