Data center vs my utility calculator Beta

How big is a data center next to the utility that serves it?

Short answer: A 100 MW data center using 75 percent of its capacity would use about 8.4 percent of all the electricity AEP Ohio sold in 2025, as much as about 58,000 of its residential customers.

Read: PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Put a data center's yearly electricity next to everything a utility sells, and to what its home customers use.

Beta. A new kind of calculator. The method and every input are shown, but it has not been through a full editor review yet. Tell us what is wrong with the error form.

Example value. Use the megawatts announced or approved.MW

Share of AEP Ohio's sales

about 8.4 percent

Between 6.4 and 8.9 percent, depending on how much of its capacity the data center really uses.

About as much electricity as 58,000 of its residential customers use, out of 538,000.

The utility sold 7,850,000 MWh in 2025. Use factor.

Announced capacity is a ceiling. A utility's sales are what it delivered, not what it could.

How it works

share = MW × 8,760 hours × use factor ÷ the utility's yearly retail sales · homes = that electricity ÷ the average residential customer's yearly use

Sources

  1. 1
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Draft research, not yet verified · Open the source
  2. 2
    eGRID2023 Summary Tables (Revision 2)
    U.S. Environmental Protection Agency
    Tier 1 · Draft research, not yet verified · Open the source
  3. 3
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Draft research, not yet verified · Open the source
  4. 4
    Measuring the Environmental Impact of Delivering AI at Google Scale
    Google (Elsworth et al.)
    Tier 4 · Draft research, not yet verified · Open the source
  5. 5
    The Gentle Singularity
    Sam Altman (OpenAI CEO)
    Tier 4 · Draft research, not yet verified · Open the source

Questions people ask

How big is a data center next to the utility that serves it?
A 100 MW data center using 75 percent of its capacity would use about 8.4 percent of all the electricity AEP Ohio sold in 2025, as much as about 58,000 of its residential customers.
Where do the utility's numbers come from?
From the utility's own report to the U.S. Energy Information Administration (Form 861): total retail sales, residential sales, and residential customers for the year.
Will the data center be served by this utility?
Not always. A project's utility is the one our records name for its site; some sites are served by more than one, or by a different company for delivery and for supply. You can choose any utility in the list.

Calculator version 0.1 (beta). A change to the method gets a new version; the inputs are in the address, so a shared link shows the same result.

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Data center vs my utility calculator." Accessed 2026-11-29. https://datacenterfactcheck.org/calculators/data-center-vs-my-utility

Embed this calculator

Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.

<iframe src="https://datacenterfactcheck.org/calculators/data-center-vs-my-utility/embed" title="Data center vs my utility calculator" width="100%" height="640" loading="lazy"></iframe>