2026

  • Air permitIssuedAug 13, 2026Virginia Department of Environmental Quality

    Virginia Department of Environmental Quality, Registration No. 74265

    Issued; combined minor New Source Review permit to construct and operate emergency diesel engine gen-sets at Yondr JK 2 LLC's data center at 42455 Allegro Lane, Aldie; supersedes and combines the permit documents dated September 28, 2023, October 22, 2024, and August 13, 2026; based on the permit application dated April 15, 2026, deemed complete August 12, 2026

    Backup generators:
    40 MTU Model 16V4000G84S emergency diesel engine gen-sets, rated 2,250 ekW (3,357 bhp) each (Ref. Nos. EG-01 through EG-40); originally permitted September 28, 2023
    Backup generators:
    121 emergency diesel engine gen-sets permitted under the August 13, 2026 combined permit (Ref. Nos. EG-01 through EG-121)
    Backup generators:
    40 MTU Model 16V4000G84S emergency diesel engine gen-sets, rated 2,250 ekW (3,357 bhp) each (Ref. Nos. EG-41 through EG-80); originally permitted October 22, 2024
    Backup generators:
    41 MTU Model 16V4000G84S emergency diesel engine gen-sets, rated 2,250 ekW (3,357 bhp) each (Ref. Nos. EG-81 through EG-121), listed as equipment to be constructed, with Selective Catalytic Reduction; original permit date August 13, 2026
    Operating hours cap:
    500 hours per year per gen-set, all purposes (Permit Condition 9); scheduled maintenance checks and readiness testing (Scheduled MCRT) are separately capped at 30 hours per year per gen-set
    Diesel fuel cap:
    1,311,697 gallons of diesel fuel oil per year, combined cap for the 121 gen-sets Ref. Nos. EG-01 through EG-121 for all operations (Permit Condition 12.b, calculated daily as the sum of each consecutive 365-day period)
    Diesel fuel cap:
    638,796 gallons of diesel fuel oil per year, combined cap (Permit Condition 12.a) for the gen-sets Ref. Nos. EG-01 through EG-55 for all operations plus Ref. Nos. EG-56 through EG-121 for operations when emissions are not controlled by SCR, calculated daily as the sum of each consecutive 365-day period
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Transmittal letter and permit cover page, Stationary Source Permit to Construct and Operate, Registration No. 74265, August 13, 2026

No date in the record(rules in force and undated records)

  • Stormwater permitIssuedNo date in the recordVirginia Department of Environmental Quality

    Virginia Department of Environmental Quality, VAR10W483

    Construction general permit coverage (VAR10) for 'Allegro North Campus - Building 2A', 42455 Allegro Lane, Aldie; operator of record Yondr JK 1, LLC; development 30.55 acres, disturbed 30.55 acres; 2024 cycle status PER_ISSUED (effective July 1, 2024, expiring June 30, 2029); VSMP authority Loudoun County

    Development acres:
    30.55 acres
    Disturbed acres:
    30.55 acres
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    DEQ EDMA Stormwater Permits layer (layer 303), record for VAR10W483, queried 2026-11-09 by site envelope on the Reg. 74265 facility plus operator, location-name and address filters

  • Stormwater permitIssuedNo date in the recordVirginia Department of Environmental Quality

    Virginia Department of Environmental Quality, VAR10Q966

    Construction general permit coverage (VAR10) for 'Project Allegro South Campus - Phase 1', 24359 Racefield Lane, Aldie; operator of record Yondr JK 2 LLC; 2019 cycle rows (effective July 1, 2019, expiring June 30, 2024) show development acreage amended from 21.09 to 24.35 and then 29.45 acres (status MODIFIED); 2024 cycle status PER_REISS at 29.45 development acres, 29.45 disturbed (effective July 1, 2024, expiring June 30, 2029); VSMP authority Loudoun County

    Disturbed acres:
    29.45 acres
    Development acres:
    29.45 acres
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    DEQ EDMA Stormwater Permits layer (layer 303), records for VAR10Q966, queried 2026-11-09 by site envelope on the Reg. 74265 facility plus operator, location-name and address filters

  • Stormwater permitIssuedNo date in the recordVirginia Department of Environmental Quality

    Virginia Department of Environmental Quality, VAR10X098

    Construction general permit coverage (VAR10) for 'Allegro North Campus', 42455 Allegro Lane, Aldie; operator of record YondrJK1, LLC; development 32.19 acres, disturbed 32.19 acres; 2024 cycle status PER_ISSUED (effective July 1, 2024, expiring June 30, 2029); VSMP authority Loudoun County

    Development acres:
    32.19 acres
    Disturbed acres:
    32.19 acres
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    DEQ EDMA Stormwater Permits layer (layer 303), record for VAR10X098, queried 2026-11-09 by site envelope on the Reg. 74265 facility plus operator, location-name and address filters

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Stationary Source Permit to Construct and Operate, Yondr JK 2 LLC, Registration No. 74265, August 13, 2026 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Stormwater Permits (Daily), EDMA MapServer layer 303
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    EDMA Virginia Water Protection Non-Permit layer (MapServer layer 191), record 22-001685 (Yondr JK Substation) and statewide Yondr name queries of layers 191, 192 and 193
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Loudoun County Board of Equalization 2025 Annual Report
    Loudoun County Board of Equalization
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Existing Data Center Parcels (county GIS layer), records for MCPI 044261032000 (Pacific Boulevard, Sterling) and MCPI 234371847000 (Compass Creek, Leesburg)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Loudoun County Zoning Ordinance (official text, eReader)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  7. 7
    Land Use Considerations (county data center page)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  8. 8
    Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
    Dominion Energy Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  9. 9
    SCC Issues Order on DEV Biennial Review 2025
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  10. 10
    Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards, Case No. PUR-2026-00011
    Virginia Electric and Power Company
    Tier 1 · Captured 2026-11-07 · Open the source
  11. 11
    How the SCC Rider T1 Decision Protects Ratepayers
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  12. 12
    Order for Notice and Hearing, Case No. PUR-2026-00056
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  13. 13
    Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
    Loudoun County Planning Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  14. 14
    Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
    Loudoun County
    Tier 1 · Captured 2026-11-09 · Open the source
  15. 15
    Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
    Virginia Commission on Local Government (Department of Housing and Community Development)
    Tier 1 · Captured 2026-11-09 · Open the source
  16. 16
    Board of Supervisors Business Meeting Minutes, March 18, 2025
    Loudoun County
    Tier 1 · Captured 2026-11-07 · Open the source
  17. 17
    Issued Air Permits for Data Centers (list as of January 29, 2026)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-08 · Open the source
  18. 18
    EDMA Active Air Sites layer (MapServer layer 294), facility record for Registration No. 74265 and statewide Yondr name query
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  19. 19
    Yondr Group's first Northern Virginia data center is ready for service
    Yondr Group
    Tier 4 · Captured 2026-11-09 · Open the source
  20. 20
    Yondr Group completes first RFS milestone for second building at 96MW Northern Virginia campus
    Yondr Group
    Tier 4 · Captured 2026-11-09 · Open the source