Every public record we have for Verrus Oakline at Mill Creek data center campus

Salem, Marion County, OregonIn permittingFirst public 2026Filing entity: Alderstone, LLCLast checked Nov 8, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

3 of 3 records · showing power and utility only ·

2025

  • Utility proceedingIn effectMar 7, 2025Public Utility Commission of Oregon

    Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I

    Order No. 26-154 (entered May 7, 2026) adopted PGE's Schedule 96 with modifications. Schedule 96 is a separate rate schedule for large nonresidential customers at or above 20 MW whose end use is data processing, created under HB 3546 (2025), the POWER Act. Customers bill transmission and generation demand at no less than 90 percent of contracted capacity; the distribution charge is billed flat at 100 percent of the cost to expand the distribution system; exceedance penalties apply above contracted capacity; minimum contract lengths and exit fees apply under the Large Load Customer Agreement, whose Rule I threshold the order lowered to 20 MW. Schedule 96 customers with 100 MW or more of allocated system capacity pay a surcharge of 1 cent per kWh, with the revenue supporting programs that offset costs for residential and low-income customers. The compliance tariff (Advice No. 26-24) took effect for service on and after July 8, 2026.

    UM 2377

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Order No. 26-154, entered 05/07/2026: caption and disposition (Schedule 96 adopted with modifications); Background (docket opened at the March 7, 2025 Regular Public Meeting); summary of stipulation terms (90 percent of contracted capacity; 1-cent per kWh surcharge at 100 MW or more; Rule I LLCA threshold lowered to 20 MW). Commission release PR-202609 (Schedule 96 created under HB 3546). Compliance tariff effective date July 8, 2026 per the Q5 WG1 notes on Advice No. 26-24.

2023

  • Utility proceedingIn effectDec 1, 2023Public Utility Commission of Oregon

    Investigation into New Load Connection Costs (Advice No. 24-38, revisions to Rule C and Rule I)

    PGE's Advice No. 24-38 revised Rule C (conditions for customer attachments to facilities) and Rule I (line extensions) for new large load connections, including facilities studies and an interconnection queue. Order No. 25-091 (March 6, 2025) suspended the original filing and ordered the further investigation that became UM 2377; the Commission then approved the Advice 24-38 changes with less than statutory notice, effective for service on and after April 16, 2025, on an interim, changeable basis. Every Customer Service Contract signed after that effective date is expressly subject to change based on the final orders in UE 430 and UM 2377, where the minimum transmission demand, capacity exceedance penalty, and exit fee questions were reserved.

    UE 430

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    OPUC Staff Report, public meeting April 15, 2025 (report dated April 4, 2025): staff recommendation to approve Advice No. 24-38 with less than statutory notice, effective for service on and after April 16, 2025; Rule C subject heading. Interim and subject-to-change character per the Q5 WG1 notes summarizing Order No. 25-091.

2021

  • Utility proceedingDecidedNov 3, 2021Public Utility Commission of Oregon

    Joint petition of PGE and QTS Investment Properties Hillsboro, LLC to increase Green Tariff Customer Supply Option capacity (GEAR, Schedule 55)

    Order No. 21-468 (December 20, 2021) adopted staff's recommendation and authorized 250 MW of additional Customer Supply Option nameplate capacity under PGE's green tariff, requested for load growth at the QTS Hillsboro campus, including facilities Facebook (Meta) planned to lease.

    UM 2202

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Order No. 21-468 disposition and staff report summary; joint petition paras. 5-10

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity (UM 2202)
    Public Utility Commission of Oregon (joint filing of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC)
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Order No. 21-468, UM 2202 (entered December 20, 2021)
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Staff Report, Portland General Electric Investigation into New Load Connection Costs, Docket UE 430 / Advice No. 24-38
    Staff of the Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  4. 4
    Order No. 26-154, Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I, Docket UM 2377
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Oregon PUC Approves New Rate Structure to Protect Customers Amid Rapid Data Center Growth
    Public Utility Commission of Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  6. 6
    Topics of Interest: Verrus' Mill Creek Data Center Project
    City of Salem, Oregon
    Tier 1 · Captured 2026-11-08 · Open the source
  7. 7
    Oakline at Mill Creek, Updated Water Consumption Overview and Estimated Water Needs (Verrus memorandum to City of Salem Public Works, August 11, 2026)
    Verrus, filed with the City of Salem
    Tier 1 · Captured 2026-11-08 · Open the source
  8. 8
    Salem Data Center Zoning: Dispute Over AI Facilities
    Salem Business Journal
    Tier 3 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page