16 of 16 records
2026
Utility proceedingDecidedSep 3, 2026Public Utilities Commission of Nevada
Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
Interim order (October 7, 2026) approving a gross-up of the CIAC rate for Sierra Pacific Power: new large loads, including data centers, reimburse NV Energy's tax cost on customer-funded construction contributions. The Q5 WG2 sweep recorded an interim gross-up rate of about 25.16 percent per testimony and a final gross-up rate of 23.6482 percent from secondary reporting of the order; the signed order's text was not opened in either sweep, so the rate figures are reported, not verified.
26-09005
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Recorded voteJul 21, 2026Storey County Board of County Commissioners
Approval of Special Use Permit 2026-018, natural gas fueled electrical generating facility at 2300 Peru Drive, McCarran (Fleet Data Centers)
3 yes. Clay Mitchell (Commissioner): yes; Donald Gilman (Commissioner): yes; Jay Carmona (Commissioner): yes.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Item 17, July 21, 2026 minutes (motion by Commissioner Mitchell, seconded by Commissioner Gilman; Aye 3, Nay 0, Abstain 0, Absent 0, Recused 0; Voted For: Mitchell-Clay, Gilman-Donald, Carmona-Jay)
Recorded voteJul 21, 2026Storey County Board of County Commissioners
Approval of the County Manager's letter of acknowledgment for Colovore Reno 1 LLC's GOED data center tax abatement application
3 yes. Clay Mitchell (Commissioner): yes; Donald Gilman (Commissioner): yes; Jay Carmona (Commissioner): yes.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Item 25, July 21, 2026 minutes (motion by Commissioner Mitchell, seconded by Commissioner Gilman; Aye 3, Nay 0, Abstain 0, Absent 0, Recused 0; Voted For: Mitchell-Clay, Gilman-Donald, Carmona-Jay)
Recorded voteJul 21, 2026Storey County Board of County Commissioners
Approval of Special Use Permit 2026-017, natural gas fueled electrical generating facility at 8990 USA Parkway, McCarran (Fleet Data Centers)
3 yes. Clay Mitchell (Commissioner): yes; Donald Gilman (Commissioner): yes; Jay Carmona (Commissioner): yes.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Item 16, July 21, 2026 minutes (motion by Commissioner Mitchell, seconded by Commissioner Gilman; Aye 3, Nay 0, Abstain 0, Absent 0, Recused 0; Voted For: Mitchell-Clay, Gilman-Donald, Carmona-Jay)
Utility proceedingPending before the commissionMay 29, 2026Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
NV Energy seeks PUCN approval of its large-load service agreement with Amazon Data Services for the Storey County campus; a prehearing conference was set for July 14, 2026. Agreement terms are in the docket filing (not read this pass).
26-05026
Draft research, not yet verifiedLast checked Nov 11, 2026Where it says this
PUCN docket information list, Docket 26-05026 caption and filing date 05/29/2026; PUCN Connection calendar (July 2026) lists the prehearing conference for July 14, 2026.
Utility proceedingPending before the commissionMay 6, 2026Public Utilities Commission of Nevada
Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
The 2026 Joint IRP (filed May 6, 2026; 41 volumes) builds its large load planning framework on the Large Load Electric Service Agreement (LLESA), the standard agreement for customer loads of 25 MW or greater. Under the framework, large load additions pay for the infrastructure needed to serve them through customer-specific charges that operate as contributions in aid of construction toward generation and transmission additions, minimum demand and energy charges, security requirements, and termination payments; NV Energy plans on a Base Load Forecast and a reduced Base Minus forecast to isolate the costs that would not be incurred but for large load requests. The Commission's statutory decision deadline runs to December 2, 2026. Approval of the LLESA framework is requested in this docket; each signed LLESA is also filed in its own approval docket.
26-05007
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Volume 1 (transmittal letter dated May 6, 2026; joint application for the 2027-2046 IRP) and Volume 2, Narrative (planning framework anchored by the LLESA; customer-specific charges as CIAC, minimum demand and energy charges, security requirements, termination payments; LLESA applies to loads of at least 25 MW; statutory resolution date December 2, 2026). Both volumes re-read firsthand in this pass.
Utility proceedingPending before the commissionMar 5, 2026Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
Companion Rule 9 (line extension) revisions to the LLESA framework, filed March 5, 2026: customer-specific charges for Rule 9 (contract-required) generation additions, return of unused contract-required generation amounts, and security requirements when the interconnection study begins. The proposed security is a letter of credit or cash equal to the greater of 50 percent of forecasted 24-month bills at full load or $10 million, with a readiness milestone schedule.
26-03009
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
2024
Tax agreementNov 14, 2024Storey County
Partial tax abatement for data centers (NRS 360.754)
Sales and use tax abatement estimated $14,224,000 and personal property tax abatement estimated $5,050,000 (2% rate / 75%, 10 years each); approved total $19,274,000. Capital investment $254,000,000; 10 jobs at an average wage of $64.07. EDAWN's support letter in the board packet describes NV12 as an expansion of the current data center located at 100 and 200 Electric Ave in Storey County, the basis for filing this approval against the staged NV1 campus.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Board packet Item 8.A, approval summary and EDAWN letter; GOED release of November 14, 2024
Utility proceedingDecidedMay 28, 2024Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
The Contract Tariff Template lets a large customer self-supply part of its load from third-party generation and storage while NV Energy balances and delivers it, under a 10-year minimum term (no more than 20 years). Approval came by stipulation: the Commission voted to accept the stipulation on March 11, 2025 (the stipulation was filed January 24, 2025 and signed by Regulatory Operations Staff, the Bureau of Consumer Protection, Microsoft, Google, and Switch). Tariff sheets filed April 16 and 18, 2025 state that the customer remains responsible for all costs and risks as if NV Energy supplied the full bundled requirement. The customer class overlaps NV Energy's data center load: Microsoft, Google, and Switch are parties, and the Rule 30 style Schedule CTT is the template the WECC peers cite.
24-05022
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. CTT terms and the March 11, 2025 stipulation vote also per the Commission's April 2026 newsletter (Tariff Corner), staged as nv-pucn-newsletter-2026-04 and read firsthand by the Q5 WG2 sweep.
Tax agreementMar 21, 2024Storey County
Partial tax abatement for data centers (NRS 360.754)
Sales and use tax abated to a 2% rate for 10 years, estimated $8,400,000; personal property tax abated 75% for 10 years, estimated $3,131,616; approved total $11,531,616. Capital equipment investment of $150,000,000 in the first 2 years; 10 jobs growing to 27 at an average wage of $59.62; operations expected Q4 2026. Application dated October 1, 2023 (board packet).
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Board packet Item 8.B, approval table and application summary; GOED release of March 21, 2024
2016
Utility proceedingDecidedSep 30, 2016Public Utilities Commission of Nevada
Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)
The Commission's December 28, 2016 order approved a settlement of Switch's second 704B application. For the new Tahoe Reno load at issue for this campus, the settlement carried no impact fee, because Switch had given notice it would not take permanent service at that location; the staff agreement is dated December 8, 2016, and describes the Tahoe Reno operations at 6.2 million square feet.
16-09023
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (caption and filing date, read firsthand 2026-11-09); AWEC Opening Comments in Oregon PUC Docket UM 2024, page 15 (approval through settlement) citing Docket No. 16-09023 Order (Dec. 28, 2016)
2015
Utility proceedingDecidedNov 30, 2015Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc.
Sierra Pacific, the NV Energy utility serving Storey County, sought Commission approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc. This is the record that grounds Sierra Pacific Power as the serving utility for the Citadel campus: the northern utility, not Nevada Power, contracted with Switch for renewable energy supply in the north.
15-11025
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (caption and filing date, read firsthand 2026-11-09)
No date in the record(rules in force and undated records)
Public decisionFiledNo date in the recordNevada Governor's Office of Economic Development
Nevada Governor's Office of Economic Development, 30-day notice, December 7, 2026 board meeting, Item 11
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Item 11 of the notice
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05028
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05026
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05027
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1GOED 30-Day Notice of Applications, Board Meeting December 7, 2026
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 2GOED Board Packet: Vantage Data Centers NV12, LLC (November 14, 2024 meeting), Item 8.A
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 3Data Center Plans to Invest $254 million and Generate $76 million in Tax Revenue (November 14, 2024 board approvals release)
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 4GOED Board Packet: Vantage Data Centers NV11, LLC (March 21, 2024 meeting), Item 8.B
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 5Abated Companies will Invest $170.4 million and Generate $140.2 million in Tax Revenue (March 21, 2024 board approvals release)
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 6PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 7Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)Tier 2 · Captured 2026-11-09 · Open the source - 8The PUCN Connection newsletter, April 2026 edition
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 92026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
NV EnergyTier 2 · Captured 2026-11-08 · Open the source - 102026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
NV EnergyTier 1 · Captured 2026-11-09 · Open the source - 11Storey County Board of County Commissioners minutes, July 21, 2026 (as published in the September 1, 2026 meeting packet)
Storey CountyTier 1 · Captured 2026-11-09 · Open the source - 12NV1 and the Nevada Hyperscale Boom: Vantage Data Centers Bets $3B on the AI Future
Data Center FrontierTier 3 · Captured 2026-11-08 · Open the source - 13EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page