Project File · Public records
Every public record we have for Switch Apex (Core 2.0), North Las Vegas
North Las Vegas, Clark County, NevadaProposedFiling entity: SwitchLast checked Nov 14, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
8 of 8 records
2026
Utility proceedingPending before the commissionMay 6, 2026Public Utilities Commission of Nevada
Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
The 2026 Joint IRP (filed May 6, 2026; 41 volumes) builds its large load planning framework on the Large Load Electric Service Agreement (LLESA), the standard agreement for customer loads of 25 MW or greater. Under the framework, large load additions pay for the infrastructure needed to serve them through customer-specific charges that operate as contributions in aid of construction toward generation and transmission additions, minimum demand and energy charges, security requirements, and termination payments; NV Energy plans on a Base Load Forecast and a reduced Base Minus forecast to isolate the costs that would not be incurred but for large load requests. The Commission's statutory decision deadline runs to December 2, 2026. Approval of the LLESA framework is requested in this docket; each signed LLESA is also filed in its own approval docket.
26-05007
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Volume 1 (transmittal letter dated May 6, 2026; joint application for the 2027-2046 IRP) and Volume 2, Narrative (planning framework anchored by the LLESA; customer-specific charges as CIAC, minimum demand and energy charges, security requirements, termination payments; LLESA applies to loads of at least 25 MW; statutory resolution date December 2, 2026). Both volumes re-read firsthand in this pass.
Utility proceedingPending before the commissionMar 5, 2026Public Utilities Commission of Nevada
Application of Nevada Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
Companion Rule 9 (line extension) revisions to the LLESA framework, filed March 5, 2026: customer-specific charges for Rule 9 (contract-required) generation additions, return of unused contract-required generation amounts, and security requirements when the interconnection study begins. The proposed security is a letter of credit or cash equal to the greater of 50 percent of forecasted 24-month bills at full load or $10 million, with a readiness milestone schedule.
26-03010
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
2024
Utility proceedingDecidedMay 29, 2024Public Utilities Commission of Nevada
Application of Nevada Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
The Contract Tariff Template lets a large customer self-supply part of its load from third-party generation and storage while NV Energy balances and delivers it, under a 10-year minimum term (no more than 20 years). Approval came by stipulation: the Commission voted to accept the stipulation on March 11, 2025 (the stipulation was filed January 24, 2025 and signed by Regulatory Operations Staff, the Bureau of Consumer Protection, Microsoft, Google, and Switch). Tariff sheets filed April 16 and 18, 2025 state that the customer remains responsible for all costs and risks as if NV Energy supplied the full bundled requirement. The customer class overlaps NV Energy's data center load: Microsoft, Google, and Switch are parties, and the Rule 30 style Schedule CTT is the template the WECC peers cite.
24-05023
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. CTT terms and the March 11, 2025 stipulation vote also per the Commission's April 2026 newsletter (Tariff Corner), staged as nv-pucn-newsletter-2026-04 and read firsthand by the Q5 WG2 sweep.
2016
Utility proceedingDecidedSep 30, 2016Public Utilities Commission of Nevada
Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)
The Commission's December 28, 2016 order approved a settlement of Switch's second 704B application under which Switch agreed to pay an impact fee of $27 million for its existing load.
16-09023
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (caption and filing date, read firsthand 2026-11-09); AWEC Opening Comments in Oregon PUC Docket UM 2024, page 15 ('This second application was ultimately approved through a settlement agreement, with Switch agreeing to pay an impact fee of $27 million') and its footnote citing the Docket No. 16-09023 Order (Dec. 28, 2016)
2014
Utility proceedingDecidedNov 14, 2014Public Utilities Commission of Nevada
Application of Switch Ltd. for Leave to Exit the System of Nevada Power Company d/b/a NV Energy in Accordance with the Provisions of NRS Chapter 704B and NAC Chapter 704B
Switch's first application to leave NV Energy service and buy energy, capacity, and ancillary services from a provider of new electric resources was denied outright (AWEC's account, citing the docket). The parties then settled Switch's southern Nevada service: an agreement filed with the Commission on July 10, 2015 and signed by Switch, NV Energy, and Commission Regulatory Operations Staff kept Switch as a full requirements customer, served its growing southern load from a new 100 MW First Solar solar project (Switch Station, commercial operation late 2016), charged Switch a premium under the NV Green Energy Rider tariff, and put Switch on the High Load Factor tariff schedule. The settlement was implemented through Nevada Power's Renewable Energy Agreement dockets 15-08005 and 15-11028.
14-11007
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (caption and filing date, read firsthand 2026-11-09); AWEC Opening Comments in Oregon PUC Docket UM 2024, page 15 and footnote 32 ('its application was denied outright'); NV Energy newsroom release, July 14, 2015 (settlement terms)
No date in the record(rules in force and undated records)
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Proton Novva SPV, LLC (Novva)
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05029
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Prologis
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05030
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Nevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
Companion CIAC gross-up docket for Nevada Power, pending as of the Commission's docket list read on November 8, 2026. As in the Sierra Pacific docket, new large loads would reimburse the tax cost on customer-funded construction contributions.
26-09006
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Votes and minutes
Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 2Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)Tier 2 · Captured 2026-11-09 · Open the source - 3First Solar, NV Energy and Switch Partner on New 100 Percent Green, Renewable Energy Program (July 14, 2015)
NV Energy (company newsroom)Tier 4 · Captured 2026-11-09 · Open the source - 42026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
NV EnergyTier 2 · Captured 2026-11-08 · Open the source - 52026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
NV EnergyTier 1 · Captured 2026-11-09 · Open the source - 6The PUCN Connection newsletter, April 2026 edition
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 7Switch buys 176 acres at Apex Industrial Park, Las Vegas
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 8Switch buys more land at industrial park outside Las Vegas
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 9EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy