Every public record we have for Iron Mountain Data Centers AZS-1 (Scottsdale)

Scottsdale, Maricopa County, ArizonaOperatingFirst public 2026Last checked Nov 13, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

4 of 5 records · showing power and utility only ·

2026

  • Utility proceedingProposedNov 6, 2026Arizona Corporation Commission

    APS and TSMC Arizona 25-Year Direct Pricing Contract

    A proposed 25-year Direct Pricing Contract, APS's instrument for extra-large energy users, which APS describes as covering semiconductor fabs and data centers alike. Under the contract as APS summarises it, TSMC Arizona takes full long-term financial responsibility for 100 percent of the new power plants, transmission lines and equipment needed to serve its facilities, plus its usage of shared system resources, so no part of that cost falls on other customers. The instrument's protections, per APS, are cost protection (the large customer funds its own dedicated infrastructure), reliability protection (new dedicated generation preserves existing grid capacity), risk protection (upfront financial security covers early departure risk) and financing protection (the direct agreement protects APS's credit metrics). APS states TSMC receives no discounted rate or subsidy under the contract.

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    APS newsroom release, November 6, 2026, opening paragraphs (filed with the ACC November 6, 2026; 25-year Direct Pricing Contract) and Frequently Asked Questions (100 percent of new plants, transmission, equipment and shared system usage; DPC defined for extra-large users including data centers; four protections including upfront financial security)

2025

  • Utility proceedingPending before the commissionJun 13, 2025Arizona Corporation Commission

    Application of Arizona Public Service Company for approval of new rates, charges, and schedules

    As proposed, new general service rate structures would end the cross-subsidy APS says comes from significant, concentrated load growth among large high-load-factor customers such as data centers: class revenue up 23.52 percent for Extra Large (E-34, E-35) and 47.03 percent for Extra High Load Factor, the costs of power purchase agreements driven by extra-large customer growth assigned directly to those customers instead of spread through the Power Supply Adjustor, and annual cost-of-service updates for the extra-large classes. APS asked for a $662.44 million (15.99 percent) base rate increase overall.

    E-01345A-25-0105

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    APS Public Notice of Hearing (filing date and revenue figures; General Service Rate Design Changes; class increase table); ACC, What's Next in the APS Rate Case, 2026-07-10 (hearing May 18 to July 7, 2026; recommendation expected late November 2026; vote deadline December 31, 2026)

  • Utility proceedingPending before the commissionApr 2025Arizona Corporation Commission

    In the Matter of the Commission's Inquiry and Review of the Existing Rate Classifications and Other Potential Issues Relating to Data Centers

    A fact-finding docket, not a rate case: it sets no tariff terms. The workshop record discusses transparent tariffs, minimum bills, collateral, exit protections, direct infrastructure funding, load flexibility, and coordinated resource planning for data centers statewide. Binding APS terms come from the rate case, Docket E-01345A-25-0105.

    E-00000A-25-0069

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Filing in Docket E-00000A-25-0069, docketed 2026-10-02 (caption; April 2025 opening); Arizona Attorney General press release, 2026-10-09

No date in the record(rules in force and undated records)

  • Utility proceedingIn effectNo date in the recordArizona Corporation Commission

    Rate Schedule XHLF, General Service, Extra High Load Factor

    For monthly maximum demand of 5,000 kW or more with a load factor of 92 percent or more in at least nine of the prior 12 months. Every customer signs an Electric Supply Agreement that sets the contract length, minimum and maximum monthly loads, and a contractual minimum bill; billing kW is the greater of the metered 15-minute maximum or the minimum kW in the agreement. That agreement is APS's take-or-pay protection; no published exit fee exists. Optional sustainability features at 15,000 kW or more require a 50 percent carbon-free energy commitment.

    A.C.C. No. 6067

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Rate Schedule XHLF (A.C.C. No. 6067), Availability section (5,000 kW and 92 percent; 15,000 kW sustainability features; ESA requirement) and Minimum Bill section

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Board Approves Modernized Zoning Ordinance (news release, December 10, 2025)
    Maricopa County, Arizona
    Tier 1 · Captured 2026-11-07 · Open the source
  2. 2
    Public Notice of Hearing and Public Comment Meetings on Arizona Public Service Company Rate Application, Docket No. E-01345A-25-0105
    Arizona Public Service Company
    Tier 1 · Captured 2026-11-07 · Open the source
  3. 3
    What's Next in the APS Rate Case?
    Arizona Corporation Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  4. 4
    Filing in Docket No. E-00000A-25-0069 (data center rate classifications inquiry)
    Arizona Corporation Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  5. 5
    Attorney General Mayes urges Arizona Corporation Commission investigation of APS Power Supply Adjustor (press release)
    Office of the Arizona Attorney General
    Tier 1 · Captured 2026-11-07 · Open the source
  6. 6
    Rate Schedule XHLF, General Service, Extra High Load Factor (A.C.C. No. 6067)
    Arizona Public Service Company
    Tier 1 · Captured 2026-11-07 · Open the source
  7. 7
    APS submits long-term energy agreement with TSMC to the Arizona Corporation Commission
    Arizona Public Service Company
    Tier 1 · Captured 2026-11-08 · Open the source
  8. 8
    Iron Mountain Data Centers data center locations (operator’s own list)
    Iron Mountain Data Centers
    Tier 2 · Captured 2026-11-10 · Open the source
  9. 9
    Iron Mountain AZS-1 Scottsdale data center page
    Iron Mountain Data Centers
    Tier 2 · Captured 2026-11-13 · Open the source
  10. 10
    Iron Mountain Data Centers location overview
    Iron Mountain Data Centers
    Tier 2 · Captured 2026-11-13 · Open the source
  11. 11
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page