Elk Grove Village, Cook County, IllinoisUnder constructionLast checked Nov 9, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
3 of 3 records
2025
Utility proceedingDecidedJun 23, 2025Illinois Commerce Commission
Commonwealth Edison Company, changes to new service requests for large demand project applicants or customers and revisions to Rider DE
The tariffs define a class of Large Demand Project Applicants or Customers (LDPACs), in practice data centers, requesting 50 MW or more. The Commission approved ComEd's changes in March 2026, replacing a flat $1 million deposit with a scaled refundable deposit: $1 million for projects of 50 to 200 MW plus $500,000 for each additional 100 MW, with a letter of credit from a U.S. financial institution also required where the deposit would exceed $2 million, protecting the deposit if a project is canceled or abandoned. The new structure does not apply to data centers already on the grid. The order also directed a docketed investigation into stronger ratepayer protections (Docket 26-0364) and a ComEd annual compliance filing. The order records more than 75 large load projects in ComEd's pipeline with combined maximum demand over 28,000 MW, above its all-time system peak.
25-0677 / 25-0679 (consolidated)
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
ICC press release of March 20, 2026 (approval; 50 MW class; deposit protection; 75 applications; investigation directed by April 23, 2026); Capitol News Illinois, March 20, 2026 (deposit scale: $1 million for 50-200 MW plus $500,000 per additional 100 MW; prior flat $1 million)
2023
Public decisionApprovedSep 12, 2023Village of Elk Grove Village
Village of Elk Grove Village, 3830
Approved (preliminary plat of resubdivision and subdivision code variance granted)
- Stated in the filing:
- 5-0-1 Village Board vote tally (AYES 5, NAYS 0, ABSENT 1)
- Stated in the filing:
- 4 lots (preliminary plat of resubdivision)
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Ordinance text, sections 2-3 and vote block; Exhibit A (addresses and PINs)
No date in the record(rules in force and undated records)
Utility proceedingPending before the commissionNo date in the recordIllinois Commerce Commission
Investigation of possible ratepayer protections and cost recovery mechanisms for servicing large demand project applicants or customers of Commonwealth Edison Company
Investigation opened on the Commission's own motion under its March 2026 order in Dockets 25-0677/25-0679, which directed initiation by April 23, 2026 and completion within eight months. Advocate testimony filed in the docket (consultant James Fine, for the Citizens Utility Board and allied groups, October 2026) analyzed 30 ComEd large load projects already interconnected or requesting service from 2021 through 2031 and put their transmission and distribution connection cost above $3 billion against about $721 million in deposits and advance commitments, under 25 percent; ComEd disputes that analysis and points to transmission security agreements and letters of credit.
26-0364
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
Docket caption in the verified petition to intervene filed in Docket 26-0364 (docketed April 29, 2026, on the Commission's docket system); ICC press release of March 20, 2026 (investigation directed); CUB release of October 22, 2026 (Fine testimony figures)
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Ordinance No. 3830 (Stream Data Centers Campus ORD3) | Village of Elk Grove Village
Village of Elk Grove VillageTier 1 · Captured 2026-11-09 · Open the source - 2ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
Illinois Commerce CommissionTier 1 · Captured 2026-11-08 · Open the source - 3Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
Capitol News IllinoisTier 3 · Captured 2026-11-08 · Open the source - 4Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
Illinois Commerce Commission (docket document)Tier 1 · Captured 2026-11-08 · Open the source - 5ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
Citizens Utility BoardTier 4 · Captured 2026-11-08 · Open the source - 6Stream, ComEd and Elk Grove Village Break Ground on New Substation for Stream's Third Campus (ORDC)
Stream Data CentersTier 4 · Captured 2026-11-08 · Open the source - 7Re: Stream ORD (Illinois EPA BOA ID# 031440AWO) - Construction Permit Application 25120023
Illinois EPATier 1 · Captured 2026-11-08 · Open the source - 8U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page