Project File · Public records

Every public record we have for Project Arrowhead

Irwin County, GeorgiaProposedFirst public 2026Filing entity: Premier Data Center Development, LLCLast checked Nov 8, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

7 of 7 records · showing power and utility only ·

2026

  • Utility proceedingDecidedJul 27, 2026Georgia Public Service Commission

    Large Load Contract deemed filed for review under the Docket No. 44280 Large Load Contract Review Process (Joint Statement of Commission Staff and Georgia Power Company, July 27, 2026)

    A customer whose peak demand is less than 100 MW is not a large load customer and the Contract Review Process does not apply. If the Commission allows the customer to terminate early and the termination fee is less than the customer’s obligation, Georgia Power will record the deficiency as a regulatory asset, will not seek recovery of any deficiency balance from non-large-load customers, and will not seek a return on the deficiency balance. Georgia Power files a semi annual Large Load Portfolio Report within ninety days after each six month contract period. Six contracts were previously reviewed under this process.

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Joint Statement, paras. 1-3 (contract deemed filed July 27, 2026; statement filed August 26, 2026), paras. 10-11 (termination deficiency; semi annual report), para. B (six contracts previously reviewed)

  • Utility proceedingIn effectJun 1, 2026Georgia Public Service Commission

    Time of Use, Revenue Neutral, Schedule TOU-RN-14

    Customers whose peak demand equals or exceeds 100 MW may take service under Schedule TOU-RN only if they were under contract for service under Schedule TOU-RN prior to February 1, 2025. Contract period 12 months; minimum monthly bill is the basic service charge plus applicable riders; summer peak energy is offset by countervailing winter energy charges.

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Schedule TOU-RN-14, Subsection J (100 MW restriction and February 1, 2025 contract cutoff), Subsections H-I (period and minimum bill); tariff footer (effective June 2026 billing month)

2025

  • Utility proceedingDecidedJul 30, 2025Georgia Public Service Commission

    Georgia Power Company’s Applications for the Certification of Capacity from the 2029-2031 All-Source RFP (Docket 56298) and of Supplemental Resources for 2028-2031 Capacity (Docket 56310)

    The Final Order certified approximately 9,885 MW of capacity in total. One order condition requires Georgia Power, in its next base rate case, to demonstrate at least $8.50/month of downward pressure on a typical residential customer’s bill for 2029-2031 from large load customer revenue.

    56298 and 56310

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    PSC 2025 Annual Report, pp. 12-13 (56298 filed July 30, 2025; decision December 19, 2025; 9,885 MW total; $8.50/month condition)

  • Utility proceedingDecidedJan 31, 2025Georgia Public Service Commission

    Georgia Power Company’s 2025 Integrated Resource Plan

    Commission approved the July 15, 2025 Stipulation. Georgia Power must file Large Load Economic Development Reports quarterly covering the large load queue, enrollment in demand management and battery storage programs, customer surveys, engagement outcomes, and challenges. By stipulation the Commission authorized Georgia Power to file for certification of 6,000 to 8,500 MW of resources. (The companion docket 56003 is the 2025 Demand-Side Management plan.)

    56002

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    PSC 2025 Annual Report, pp. 6-7 (56002 approval July 15, 2025; quarterly report requirement; certification authorization); Order Adopting Stipulation issued July 31, 2025

2024

  • Utility proceedingDecidedDec 11, 2024Georgia Public Service Commission

    Order Approving Revisions to Georgia Power Company's Rules and Regulations (large load rules)

    New customers with 100 MW or more of load may take custom contracts instead of standard tariff terms. The customer pays site-specific costs plus upstream generation, transmission, and distribution costs as construction progresses, so existing customers bear none of the cost of adding large customers. Minimum billing requirements apply, contracts may run up to 15 years (from 5), and Georgia Power must file every contract with the Commission within 30 days of execution.

    44280

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Order of 2025-01-28 (Exhibit Q in Florida PSC filing 07045-2025), pages 1-3 (filing date, 100 MW threshold, Sections A and D); PSC news release of 2025-01-23 (Exhibit P)

No date in the record(rules in force and undated records)

  • Utility proceedingIn effectNo date in the recordGeorgia Public Service Commission

    Schedule PLL-18, Power and Light Large

    The standard large service schedule, from 500 kW. Customers with expected total peak demand of 100 MW or more on one tract or contiguous tracts may take service under it only if they contracted for service before February 1, 2025; larger new loads must use custom contracts under the 2025 rules. Minimum monthly bill is $256 plus $13.63 per kW of billing demand. Billing demand is never less than the greatest of the contract minimum, 50 percent of total contract capacity, or 500 kW. Contract term is 5 years.

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Schedule PLL-18, First Revision page 5.00, pages 1-3 (Applicability cutoff; Monthly Rate and Minimum Monthly Bill; Term of Contract)

  • Utility proceedingPending before the commissionNo date in the recordGeorgia Public Service Commission

    RTP Revenue Credit and Allocation Methodology

    Commission investigation into how Georgia Power credits Real Time Pricing (RTP) revenue against fuel costs. RTP is the schedule used by the company’s largest customers, including data centers. The question is whether the current method shifts fuel, firm pipeline transportation and hedging costs from RTP and large load customers to other customer classes; Public Interest Advocacy Staff estimated in the parent fuel case (Docket 56765) that it could raise other customers’ per-unit fuel cost 5 to 11 percent by 2028 and leave about $118 million of 2027 pipeline costs outside the RTP class. Hearings were held September 1 and October 15, 2026, with a further hearing on November 12, 2026; findings are due by December 31, 2026 under the May 28, 2026 fuel case stipulation.

    57171

    Draft research, not yet verifiedLast checked Nov 11, 2026
    Where it says this

    Commission Calendar, November 2026, November 12 entry (9:35 am, Docket No. 57171 RTP Revenue Credit and Allocation Methodology Hearing); PSC homepage Upcoming Events list, same entry

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Order Approving Revisions to Georgia Power Company's Rules and Regulations, Docket No. 44280, with the PSC news release of January 23, 2025 (Exhibits Q and P)
    Georgia Public Service Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  2. 2
    Schedule PLL-18, Power and Light Large
    Georgia Power Company
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Stipulation, Docket Nos. 56002 and 56003, Georgia Power 2025 Integrated Resource Plan
    Georgia Public Service Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  4. 4
    Electric Service Tariff, Schedule TOU-RN-14, Time of Use, Revenue Neutral (effective with bills for the billing month of June 2026)
    Georgia Power Company
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Order Adopting Stipulation and Granting Certification, Docket Nos. 56298 and 56310
    Georgia Public Service Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  6. 6
    Joint Statement of Commission Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed for Purposes of Review, July 27, 2026 (statement dated August 26, 2026)
    Georgia Public Service Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  7. 7
    Commission Calendar, November 2026 (Docket No. 57171 hearing, November 12, 2026)
    Georgia Public Service Commission
    Tier 1 · Captured 2026-11-11 · Open the source
  8. 8
    DRI #4689 Initial Information Form: Project Arrowhead
    Georgia Department of Community Affairs
    Tier 1 · Captured 2026-11-08 · Open the source
  9. 9
    DRI #4689 Information Form Part 2: Project Arrowhead