Project File · Public records
Every public record we have for Opus Interactive Hillsboro
Hillsboro, Washington County, OregonOperatingLast checked Nov 9, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
5 of 5 records
2026
Zoning ruleIn effectOct 20, 2026Hillsboro
Citywide acreage cap and zone limits for data centers
Hillsboro adopted its first permanent data center limits: standalone data centers are capped at 608 acres citywide across the Industrial Park (215 acres) and Industrial Sanctuary (310 acres) zones plus 83 acres in part of Jackson East; accessory data centers are capped at the lesser of 25 percent of site acreage or 30 percent of the primary use floor area; a 1000-foot buffer from schools applies until 2027-10-31; every new application needs a public hearing.
Community Development Code amendments Case File CDCA-004-26 (Order No. 8502)
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
City staff report No. 5 to the Planning Commission (2026-09-09) for Case File CDCA-004-26 with the draft order and exhibits
Development ruleIn effectJul 27, 2026Hillsboro
120-day moratorium on new or expanded data center and battery storage applications as a primary use
Hillsboro adopted a temporary moratorium under ORS 197.505 to 197.540: no person may submit, and the city may not accept, process, or approve, a new land use application for a new data center or battery energy storage system as a primary use, or an expansion of an existing one as a primary use, while the city studies the uses and writes Community Development Code amendments. The resolution defines a data center as a facility for the storage, management, processing, and/or transmission of digital data housing computer and network equipment, with no megawatt or square-foot threshold.
Resolution No. 2932
Draft research, not yet verifiedLast checked Nov 10, 2026Where it says this
Resolution No. 2932 (signed copy on the city CivicWeb host): Sections 1, 2 and 5; Exhibit A findings
2025
Utility proceedingIn effectMar 7, 2025Public Utility Commission of Oregon
Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I
Order No. 26-154 (entered May 7, 2026) adopted PGE's Schedule 96 with modifications. Schedule 96 is a separate rate schedule for large nonresidential customers at or above 20 MW whose end use is data processing, created under HB 3546 (2025), the POWER Act. Customers bill transmission and generation demand at no less than 90 percent of contracted capacity; the distribution charge is billed flat at 100 percent of the cost to expand the distribution system; exceedance penalties apply above contracted capacity; minimum contract lengths and exit fees apply under the Large Load Customer Agreement, whose Rule I threshold the order lowered to 20 MW. Schedule 96 customers with 100 MW or more of allocated system capacity pay a surcharge of 1 cent per kWh, with the revenue supporting programs that offset costs for residential and low-income customers. The compliance tariff (Advice No. 26-24) took effect for service on and after July 8, 2026.
UM 2377
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Order No. 26-154, entered 05/07/2026: caption and disposition (Schedule 96 adopted with modifications); Background (docket opened at the March 7, 2025 Regular Public Meeting); summary of stipulation terms (90 percent of contracted capacity; 1-cent per kWh surcharge at 100 MW or more; Rule I LLCA threshold lowered to 20 MW). Commission release PR-202609 (Schedule 96 created under HB 3546). Compliance tariff effective date July 8, 2026 per the Q5 WG1 notes on Advice No. 26-24.
2023
Utility proceedingIn effectDec 1, 2023Public Utility Commission of Oregon
Investigation into New Load Connection Costs (Advice No. 24-38, revisions to Rule C and Rule I)
PGE's Advice No. 24-38 revised Rule C (conditions for customer attachments to facilities) and Rule I (line extensions) for new large load connections, including facilities studies and an interconnection queue. Order No. 25-091 (March 6, 2025) suspended the original filing and ordered the further investigation that became UM 2377; the Commission then approved the Advice 24-38 changes with less than statutory notice, effective for service on and after April 16, 2025, on an interim, changeable basis. Every Customer Service Contract signed after that effective date is expressly subject to change based on the final orders in UE 430 and UM 2377, where the minimum transmission demand, capacity exceedance penalty, and exit fee questions were reserved.
UE 430
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
OPUC Staff Report, public meeting April 15, 2025 (report dated April 4, 2025): staff recommendation to approve Advice No. 24-38 with less than statutory notice, effective for service on and after April 16, 2025; Rule C subject heading. Interim and subject-to-change character per the Q5 WG1 notes summarizing Order No. 25-091.
2021
Utility proceedingDecidedNov 3, 2021Public Utility Commission of Oregon
Joint petition of PGE and QTS Investment Properties Hillsboro, LLC to increase Green Tariff Customer Supply Option capacity (GEAR, Schedule 55)
Order No. 21-468 (December 20, 2021) adopted staff's recommendation and authorized 250 MW of additional Customer Supply Option nameplate capacity under PGE's green tariff, requested for load growth at the QTS Hillsboro campus, including facilities Facebook (Meta) planned to lease.
UM 2202
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Order No. 21-468 disposition and staff report summary; joint petition paras. 5-10
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Votes and minutes
Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Staff Report No. 5 and attachments: Community Development Code Amendments Case File CDCA-004-26 Data and Energy Storage
City of Hillsboro OregonTier 1 · Captured 2026-11-08 · Open the source - 2Resolution No. 2932 (signed copy), data center and battery storage moratorium
City of Hillsboro, Oregon (CivicWeb host)Tier 1 · Captured 2026-11-10 · Open the source - 3Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity (UM 2202)
Public Utility Commission of Oregon (joint filing of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC)Tier 1 · Captured 2026-11-09 · Open the source - 4Order No. 21-468, UM 2202 (entered December 20, 2021)
Public Utility Commission of OregonTier 1 · Captured 2026-11-09 · Open the source - 5Staff Report, Portland General Electric Investigation into New Load Connection Costs, Docket UE 430 / Advice No. 24-38
Staff of the Public Utility Commission of OregonTier 1 · Captured 2026-11-08 · Open the source - 6Order No. 26-154, Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I, Docket UM 2377
Public Utility Commission of OregonTier 1 · Captured 2026-11-08 · Open the source - 7Oregon PUC Approves New Rate Structure to Protect Customers Amid Rapid Data Center Growth
Public Utility Commission of OregonTier 1 · Captured 2026-11-08 · Open the source - 8Oregon Colocation, Hillsboro (company facility page)
Opus InteractiveTier 2 · Captured 2026-11-09 · Open the source - 9Cogent Service Locations, Oregon / Portland metro (company directory)
Cogent CommunicationsTier 2 · Captured 2026-11-09 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page