Project File · Public records
Every public record we have for Meta Kuna Data Center
Kuna, Ada County, IdahoOperatingFirst public 2022Filing entity: Brisbie LLCLast checked Nov 8, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
3 of 3 records
2026
Utility proceedingPending before the commissionMar 31, 2026Idaho Public Utilities Commission
Idaho Power Company's Petition to Evaluate Class Cost-of-Service Methodology, Consider Alternative Class Cost-of-Service Studies, and Determine Cost of Service Considerations for New Large-Load Customers
A single-issue evidentiary docket opened as directed by Order No. 36892 in the 2025 general rate case settlement (IPC-E-25-16). It seeks no rate change and no approval of a specific methodology. Idaho Power’s current 2025 class cost-of-service method functionalizes, classifies and allocates costs on demand, energy and customer drivers; the petition puts four alternatives on the record: EFAC, AED-4CP, Hourly-Informed, and EFAC Production and Transmission Load-Factor Classification. For large loads, the petition identifies concentrated load growth from data centers and industrial customers as a planning and cost allocation challenge, and puts Energy Service Agreements, direct assignment of customer-specific infrastructure costs, and growth-sensitive allocation frameworks on the record. The petition sets no MW threshold.
IPC-E-26-07
Draft research, not yet verifiedLast checked Nov 11, 2026Where it says this
Order No. 36998, Notice of Petition, service date April 13, 2026, pages 1-2 (petition filed March 31, 2026; no rate change sought; the four alternatives at Petition paragraphs 14-19; large load growth, Energy Service Agreements and direct assignment at paragraphs 22-25)
2024
Utility proceedingDecidedDec 6, 2024Idaho Public Utilities Commission
Application for Approval of Special Contract and Tariff Schedule 28 to Provide Electric Service to Micron Idaho Semiconductor Manufacturing (Triton) LLC
Final Order No. 37039 (service date May 8, 2026) approved Idaho Power's Energy Service Agreement (the Micron FAB Special Contract) with Micron Idaho Semiconductor Manufacturing (Triton) LLC for its new memory fabrication plant and Tariff Schedule 28. Schedule 28 prices update annually using Commission-approved marginal cost data, with demand charges updated in general rate cases; the ESA protects other customers through a termination payment if Micron ends the agreement early or breaches it. A compliance order (No. 37092, July 8, 2026) followed; its text was not opened in this pass. The customer is a semiconductor fab, rowed here because Schedule 28 is Idaho Power's large load special contract vehicle decided in the same line as its data center contracts.
IPC-E-24-44
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Final Order No. 37039: caption (Case No. IPC-E-24-44; application filed December 6, 2024; special contract and Tariff Schedule 28 for Micron); body (Schedule 28 structure updated annually from approved marginal cost data; ESA termination payment). Re-read firsthand in this pass.
2021
Utility proceedingDecidedDec 22, 2021Idaho Public Utilities Commission
Application for Approval of Special Contract and Tariff Schedule 33 to Provide Electric Service to Brisbie, LLC's Data Center Facility
Final Order No. 35777 (service date May 11, 2023) approved Idaho Power's Energy Service Agreement with Brisbie, LLC for its new enterprise data center (the Meta Kuna site) and Tariff Schedule 33, effective on the date of the final order. The first 20 MW of load (Block 1) is priced at the current Schedule 19T rates; the companion power purchase agreement was approved April 12, 2023 in Case No. IPC-E-22-29. Idaho Power's standing special contract schedule for very large loads is Schedule 19 (50 MW dedication test in its text, per the Q5 WG3 notes).
IPC-E-21-42
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Final Order No. 35777: caption (Case No. IPC-E-21-42; application December 22, 2021; Brisbie, LLC data center; Tariff Schedule 33); body (ESA effective on the final order date; first 20 MW priced at Schedule 19T; PPA approved in IPC-E-22-29 on April 12, 2023). Re-read firsthand in this pass.
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Votes and minutes
Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Final Order No. 35777, Case No. IPC-E-21-42 (Idaho Power special contract and Tariff Schedule 33 for Brisbie, LLC)
Idaho Public Utilities CommissionTier 1 · Captured 2026-11-09 · Open the source - 2Final Order No. 37039, Case No. IPC-E-24-44 (Idaho Power special contract and Tariff Schedule 28 for Micron)
Idaho Public Utilities CommissionTier 1 · Captured 2026-11-09 · Open the source - 3Order No. 36998, Notice of Petition, Case No. IPC-E-26-07
Idaho Public Utilities CommissionTier 1 · Captured 2026-11-11 · Open the source · Archived copy - 4Meta Announces Kuna as Location of New Data Center
Idaho Department of CommerceTier 1 · Captured 2026-11-08 · Open the source - 5United States - Meta Data Centers (fleet list incl. Fort Worth)
MetaTier 4 · Captured 2026-11-08 · Open the source - 6IDACORP Q3 2026 earnings call highlights
IDACORP, Inc. (call as summarized by Ticker Report)Tier 3 · Captured 2026-11-08 · Open the source - 7EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page