Boone County, West VirginiaAnnouncedFirst public 2026Filing entity: LM Core Energy ServicesLast checked Nov 8, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
2 of 2 records · showing power and utility only ·
2025
Utility proceedingPending before the commissionMar 24, 2025Virginia State Corporation Commission
Petition of Appalachian Power Company For approval of Revisions to the Terms and Conditions of Rate Schedule L.P.S.
Under the November 10, 2025 Partial Stipulation (revising the petition as filed): the large load terms apply to new load or expansions at or above 100 MW at an individual site or 150 MW aggregated, contracted after July 1, 2025; initial contract term not less than 14 years with a load ramp of no more than 4 years; monthly billing demand not less than the greater of 80 percent of contract capacity or 80 percent of the highest billing demand in the past 11 months, plus base billing energy of contract capacity times 60 percent times billing hours; collateral as proposed in the petition, negotiable at company discretion. Capacity may be reduced up to 20 percent after year 5 with no exit fee on 42 months notice; larger reductions or termination carry an exit fee equal to the nominal remaining minimum charge over a 1 to 5 year exit fee period, with a company duty to mitigate. No rate change.
PUR-2025-00057
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
Petition paras. 1 and 4 (thresholds, as-filed 12 year term, 80 percent minimum, collateral); Partial Stipulation Exhibit A, pp. 1-5 (para. 1a applicability; paras. 1b-1f term, ramp, billing demand, base billing energy, collateral, reductions and exit fee)
2024
Utility proceedingIn effectSep 25, 2024Public Service Commission of West Virginia
Application for Approval of Revisions to Schedules LCP and IP (Appalachian Power Company and Wheeling Power Company)
The Large Load Customers section of Schedules L.C.P. and I.P. applies to new load, and to expansions of existing load, contracted after January 1, 2025 where the new load or expansion itself is at least 100 MW at an individual site or 150 MW aggregated. Initial contract term not less than 12 years, commencing after a load ramp of no more than five years; monthly billing demand not less than the greater of 80 percent of contract capacity or 80 percent of the highest billing demand in the past 11 months, plus base billing energy of contract capacity times 60 percent times billing hours; collateral equal to 24 times the previous maximum monthly nonfuel bill, recomputed annually. After the first five years the customer may reduce capacity up to 20 percent in total with no exit fee on 42 months notice; larger reductions or termination carry an exit fee equal to the nominal remaining minimum charge over the remaining term (not less than one, not more than five years), less estimated PJM transmission savings, with a duty to mitigate.
24-0611-E-T-PW
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
Tariff filing of April 7, 2025: Schedule L.C.P. Sheet Nos. 14-3 (Large Load Customers, applicability) and 14-4 (contract term, billing demand, minimum charge, collateral, capacity reductions); Schedule I.P. Sheet Nos. 15-1 to 15-4 (same section); PSC 2024 Management Summary Report, appendix entry for Case No. 24-0611-E-T-PW (filing date)
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Votes and minutes
Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Tariff filing with corrected Schedules L.C.P. and I.P. sheets, Case No. 24-0611-E-T-PW (filed April 7, 2025)
Public Service Commission of West VirginiaTier 1 · Captured 2026-11-08 · Open the source - 2Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S., Case PUR-2025-00057
Virginia State Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 3Partial Stipulation, Case PUR-2025-00057 (filed November 10, 2025)
Virginia State Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 4WV certified Boone County data center campus project without public announcement
West Virginia Press Association (Charleston Gazette-Mail reporting)Tier 3 · Captured 2026-11-08 · Open the source - 5EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page