3 of 3 records · showing power and utility only ·
2026
Utility proceedingPending before the commissionApr 2, 2026Colorado Public Utilities Commission
Public Service Company of Colorado (Xcel Energy), Large Load Tariff: proposed Schedule TL (Large Load Service) and optional Schedule CTT (Contract Tariff Template)
Xcel Energy (Public Service Company of Colorado) filed its Large Load Tariff on April 2, 2026 for customers requiring 50 MW or more of peak demand; customers between 20 and 50 MW may also be subject to the terms. Proposed Schedule TL requires the customer to pay all transmission, substation, interconnection, and generation costs its load causes, sign a contract of 15 years or more, make minimum monthly payments, and pay early-termination charges. An optional Schedule CTT, modeled on NV Energy's, would let a customer self-generate at least 20 percent of its annual energy while the utility provides shaping, balancing, and backup. Hearings ran October 21 to 28, 2026 and the Commission's decision was still to be determined when the Commission's case page was read on November 8, 2026.
26AL-0137E
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Commission Electric Rate Cases page, entry for Proceeding No. 26AL-0137E, as read firsthand by the Q5 WG3 sweep on 2026-11-08 (the source row's notes carry the filing date, the 50 MW test, and the terms). The page returns HTTP 403 to this conversion pass's fetches (two attempts, 2026-11-09), so the row rests on the WG3 reading of the Commission's own page.
2024
Utility proceedingDecidedOct 15, 2024Colorado Public Utilities Commission
Public Service Company of Colorado 2024 Just Transition Solicitation (Electric Resource Plan), Phase 1
Public Service's 2024 Just Transition Solicitation is its Electric Resource Plan for resource acquisitions from 2029 to 2033, including replacement of Pueblo Unit 3, which retires by January 1, 2031. The Phase I Decision (Decision No. C25-0747, issued November 6, 2025) approved the solicitation with modifications, on a plan that could result in acquisition of over 6,000 MW of new generation, and established a more flexible acquisition process to respond to new loads in a timely way while protecting existing ratepayers if large customer loads do not materialize but generation has been built to serve them. Phase II, covering portfolio selection and contracting, continues in the same proceeding. All figures are plan-level resource and load figures for the utility system, never the capacity of any single project.
24A-0442E
Draft research, not yet verifiedLast checked Nov 10, 2026Where it says this
Commission's 2025 JTS Written Order summary (Proceeding No. 24A-0442E; Written Decision issued Nov. 6, 2025) and the Commission's press release on completion of Phase 1 deliberations
2023
Utility proceedingDecidedJun 23, 2023Colorado Public Utilities Commission
Public Service Company of Colorado application for approval of a non-standard economic development rate (EDR) contract with QTS Aurora Infrastructure, LLC, and for a determination on a certificate of public convenience and necessity (CPCN) for customer-funded transmission facilities
QTS Aurora Infrastructure, LLC committed to take electric service for a minimum of ten years for its planned Aurora data center campus, which Public Service stated was expected to reach an average estimated total load of approximately 160 MW at full capacity, in exchange for a percentage discount off standard base rates under Schedule Transmission General (TG). QTS pays all costs of approximately 1.4 miles of dedicated double-circuit 230 kV transmission facilities connecting the campus to the Public Service system. Decision No. C24-0378 (adopted May 15, 2024, mailed June 13, 2024) denied the exceptions filed by Commission Trial Staff, the Colorado Office of the Utility Consumer Advocate, and Colorado Energy Consumers; adopted Administrative Law Judge Recommended Decision No. R24-0168 with modifications; found QTS eligible for an economic development rate; approved the EDR electric service agreement; and granted a CPCN for the QTS transmission facilities. The 160 MW figure is the utility's estimate of one customer's campus load as stated in the proceeding, not a tariff threshold.
23A-0330E
Draft research, not yet verifiedLast checked Nov 10, 2026Where it says this
Decision No. C24-0378, paragraphs 1-5 and the Recommended Decision summary (QTS eligibility for an economic development rate)
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Votes and minutes
Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Electric Rate Cases (Xcel Large Load Tariff, Proceeding No. 26AL-0137E)
Colorado Public Utilities CommissionTier 1 · Captured 2026-11-08 · Open the source - 2Decision No. C24-0378, Proceeding No. 23A-0330E (QTS non-standard EDR contract)
Colorado Public Utilities CommissionTier 1 · Captured 2026-11-10 · Open the source - 32025 JTS Written Order summary, Proceeding No. 24A-0442E
Colorado Public Utilities CommissionTier 1 · Captured 2026-11-10 · Open the source - 4
- 5U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source - 6EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page