Project File · Public records

Every public record we have for Google The Dalles data center campus

The Dalles, Wasco County, OregonOperatingFirst public 2006Filing entity: Design, LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

7 of 29 records · showing land and zoning rules only ·

2026

  • Development ruleIn effectJan 12, 2026The Dalles

    Large industrial site reservation

    The city must identify four 20-acre large industrial sites on a map kept by the Community Development Department, matching the large site need in the city's Economic Opportunities Analysis. When a large industrial user buys or develops an identified site, or any 20-acre site, the required number drops, and owners may develop smaller lots as long as a place for a large industrial site is retained.

    The Dalles Municipal Code, Title 10, Article 5.090, Large Industrial Sites (added by Ord. 26-1424)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Large Industrial Sites subsection of Article 5.090

No date in the record(rules in force and undated records)

  • Development ruleIn effectNo date in the recordThe Dalles

    Industrial district building height limits

    Building height in the Industrial District is capped at 55 feet, and at 40 feet for buildings within 100 feet of a residential zone. The 40-foot limit does not apply where there is more than a 20-foot difference in elevation between the commercial lot and the residential zone district.

    The Dalles Municipal Code, Title 10, Article 5.090, development standards table

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Development standards table, Building Height row and its footnote

  • Zoning ruleIn effectNo date in the recordWasco County

    Rural Industrial zone use lists

    The word data center appears nowhere in the county land use ordinance, which was searched in full. In the Rural Industrial zone, the county's only general industrial zone outside the rural community zones, uses are classed as small scale and low impact: minor utility facilities are allowed without review, new industrial uses inside existing buildings go through Type I review, listed light manufacturing and similar uses go through standards (Type II) review, and major utility facilities and heavier uses need conditional use review. Industrial buildings under the standards and conditional lists are capped at a cumulative floor area of 35,000 square feet, so a large data center does not fit the zone's listed categories as written.

    Wasco County Land Use and Development Ordinance (LUDO), Sections 3.510 to 3.515, Rural Industrial (R-I) Zone

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 3.511 (purpose), 3.512 (uses without review), 3.513 (Type I), 3.514 (standards/Type II), 3.515 (conditional use review); full-text search for "data center" returned no match

  • Development ruleIn effectNo date in the recordWasco County

    Rural Industrial zone height limit

    The maximum height for all structures in the Rural Industrial zone is 45 feet, measured from average grade.

    Wasco County LUDO, Section 3.516(D), Rural Industrial zone

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 3.516(D), Height

  • Setback ruleIn effectNo date in the recordWasco County

    Rural Industrial zone setbacks

    Structures in the Rural Industrial zone must sit at least 25 feet from the right-of-way of a public road at the front, at least 20 feet from the rear property line, and at least 50 feet from streams and lakes measured from the high water line. Where the side or rear of an industrial lot abuts a residential zone, a side or rear yard of at least 50 feet is required, and where the side of an R-I lot abuts an A-1 farm zone lot, the setback is 100 feet from the common property line. Corner lots need a side yard of at least 10 feet and vision clearance of at least 30 feet.

    Wasco County LUDO, Section 3.516(B), Property Development Standards, Rural Industrial zone

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 3.516(B) items 1 to 3, (C) vision clearance, (E) stream setback

  • Setback ruleIn effectNo date in the recordThe Dalles

    Industrial district setbacks

    Industrial buildings have no minimum setback except 25 feet from a residential zone or community facilities overlay, 10 feet from a public right-of-way, and 30 feet from the Columbia River to allow for the Riverfront Trail and related amenities. Minimum lot size is 10,000 square feet or larger where needed to meet large lot requirements.

    The Dalles Municipal Code, Title 10, Article 5.090, development standards table

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Development standards table, Setbacks (All Yards) row, items A to C; Lot Size row

  • Zoning ruleIn effectNo date in the recordThe Dalles

    Industrial district permitted and conditional uses

    Data center is not a named use anywhere in the Industrial District article. Manufacturing, fabricating, processing, repair, engineering, research and development, assembly, wholesale, transfer, distribution, and storage uses are permitted outright, and the Director may treat other uses as permitted when they are similar to the listed uses under the Standard Industrial Classification code. Conditional uses, reviewed under the conditional use articles, include bulk fuel stores, junkyards, and marijuana production and processing.

    The Dalles Municipal Code, Title 10 (Land Use Ordinance), Article 5.090, I Industrial District

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Uses permitted outright, items 9 and 24; conditional uses list; district intent paragraph

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Resolution SIP-21-01: Determination of Approval for Strategic Investment Program, Google Data Center (Project 1)
    Oregon Business Development Commission (Business Oregon)
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Special Resolution: Distribution of Local Community Service Fee under the Strategic Investment Program (Google projects, Wasco County)
    Oregon Business Development Commission (Business Oregon)
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Google Data Centers in The Dalles
    City of The Dalles
    Tier 1 · Captured 2026-11-08 · Open the source
  4. 4
    Special Ordinance No. 25-608: A Special Ordinance Accepting Title to Real Property Located near the Intersection of West 2nd Street and Snipes Street
    City of The Dalles
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Resolution SIP-21-02: Determination of Approval for Strategic Investment Program, Google Data Center (Project 2)
    Oregon Business Development Commission (Business Oregon)
    Tier 1 · Captured 2026-11-08 · Open the source
  6. 6
    City Council Agenda Packet, Regular Meeting, October 25, 2021
    City of The Dalles
    Tier 1 · Captured 2026-11-07 · Open the source
  7. 7
    Public records order: Oregonian appeal of the City of The Dalles Exhibit C redactions (Infrastructure Agreement), February 10, 2023
    Wasco County District Attorney
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Total City and Google Water Consumption (gal.), current as of January 21, 2026
    City of The Dalles
    Tier 1 · Captured 2026-11-09 · Open the source
  9. 9
    Board of Commissioners Regular Session Minutes, August 5, 2015
    Wasco County
    Tier 1 · Captured 2026-11-09 · Open the source
  10. 10
    Resolution No. 24-030: A Resolution Establishing Budgetary Policy for the Appropriation of Strategic Investment Program Taxes and Revenues under the 2021 SIP Agreement with Design, LLC
    City of The Dalles
    Tier 1 · Captured 2026-11-09 · Open the source
  11. 11
    Enterprise Zone Tax Abatement Agreement (City of The Dalles, Wasco County, and Design, LLC), 2005
    City of The Dalles
    Tier 1 · Captured 2026-11-09 · Open the source
  12. 12
    Enterprise Zone Tax Abatement Agreement (City of The Dalles, Wasco County, and Design, LLC), 2013 (execution version)
    City of The Dalles
    Tier 1 · Captured 2026-11-09 · Open the source
  13. 13
    Board of Commissioners Special Session Minutes, September 24, 2013
    Wasco County
    Tier 1 · Captured 2026-11-07 · Open the source
  14. 14
    Good day for journalism: The Dalles, Google abdicate in water fight with Oregonian
    Columbia Insight
    Tier 3 · Captured 2026-11-07 · Open the source
  15. 15
    Proposed Budget Book FY2023-24, Enterprise Zone Funds
    City of The Dalles
    Tier 1 · Captured 2026-11-07 · Open the source
  16. 16
    City Council Agenda Packet, April 25, 2022
    City of The Dalles
    Tier 1 · Captured 2026-11-07 · Open the source
  17. 17
    Article 5.090, I Industrial District, The Dalles Land Use Ordinance
    City of The Dalles, Oregon
    Tier 1 · Captured 2026-11-07 · Open the source
  18. 18
    Wasco County Land Use and Development Ordinance (full text)
    Wasco County, Oregon
    Tier 1 · Captured 2026-11-07 · Open the source
  19. 19
    Northern Wasco County PUD presentation to the Governor's Data Center Advisory Committee
    Northern Wasco County People's Utility District
    Tier 1 · Captured 2026-11-07 · Open the source
  20. 20
    Preparing for the Future: Northern Wasco County PUD's Commitment to Smart and Equitable Growth
    Northern Wasco County People's Utility District
    Tier 1 · Captured 2026-11-07 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page