What the public record holds
7 of 29 records · showing land and zoning rules only ·
2026
Development ruleIn effectJan 12, 2026The Dalles
Large industrial site reservation
The city must identify four 20-acre large industrial sites on a map kept by the Community Development Department, matching the large site need in the city's Economic Opportunities Analysis. When a large industrial user buys or develops an identified site, or any 20-acre site, the required number drops, and owners may develop smaller lots as long as a place for a large industrial site is retained.
The Dalles Municipal Code, Title 10, Article 5.090, Large Industrial Sites (added by Ord. 26-1424)
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Large Industrial Sites subsection of Article 5.090
No date in the record(rules in force and undated records)
Development ruleIn effectNo date in the recordThe Dalles
Industrial district building height limits
Building height in the Industrial District is capped at 55 feet, and at 40 feet for buildings within 100 feet of a residential zone. The 40-foot limit does not apply where there is more than a 20-foot difference in elevation between the commercial lot and the residential zone district.
The Dalles Municipal Code, Title 10, Article 5.090, development standards table
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Development standards table, Building Height row and its footnote
Zoning ruleIn effectNo date in the recordWasco County
Rural Industrial zone use lists
The word data center appears nowhere in the county land use ordinance, which was searched in full. In the Rural Industrial zone, the county's only general industrial zone outside the rural community zones, uses are classed as small scale and low impact: minor utility facilities are allowed without review, new industrial uses inside existing buildings go through Type I review, listed light manufacturing and similar uses go through standards (Type II) review, and major utility facilities and heavier uses need conditional use review. Industrial buildings under the standards and conditional lists are capped at a cumulative floor area of 35,000 square feet, so a large data center does not fit the zone's listed categories as written.
Wasco County Land Use and Development Ordinance (LUDO), Sections 3.510 to 3.515, Rural Industrial (R-I) Zone
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Section 3.511 (purpose), 3.512 (uses without review), 3.513 (Type I), 3.514 (standards/Type II), 3.515 (conditional use review); full-text search for "data center" returned no match
Development ruleIn effectNo date in the recordWasco County
Rural Industrial zone height limit
The maximum height for all structures in the Rural Industrial zone is 45 feet, measured from average grade.
Wasco County LUDO, Section 3.516(D), Rural Industrial zone
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Section 3.516(D), Height
Setback ruleIn effectNo date in the recordWasco County
Rural Industrial zone setbacks
Structures in the Rural Industrial zone must sit at least 25 feet from the right-of-way of a public road at the front, at least 20 feet from the rear property line, and at least 50 feet from streams and lakes measured from the high water line. Where the side or rear of an industrial lot abuts a residential zone, a side or rear yard of at least 50 feet is required, and where the side of an R-I lot abuts an A-1 farm zone lot, the setback is 100 feet from the common property line. Corner lots need a side yard of at least 10 feet and vision clearance of at least 30 feet.
Wasco County LUDO, Section 3.516(B), Property Development Standards, Rural Industrial zone
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Section 3.516(B) items 1 to 3, (C) vision clearance, (E) stream setback
Setback ruleIn effectNo date in the recordThe Dalles
Industrial district setbacks
Industrial buildings have no minimum setback except 25 feet from a residential zone or community facilities overlay, 10 feet from a public right-of-way, and 30 feet from the Columbia River to allow for the Riverfront Trail and related amenities. Minimum lot size is 10,000 square feet or larger where needed to meet large lot requirements.
The Dalles Municipal Code, Title 10, Article 5.090, development standards table
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Development standards table, Setbacks (All Yards) row, items A to C; Lot Size row
Zoning ruleIn effectNo date in the recordThe Dalles
Industrial district permitted and conditional uses
Data center is not a named use anywhere in the Industrial District article. Manufacturing, fabricating, processing, repair, engineering, research and development, assembly, wholesale, transfer, distribution, and storage uses are permitted outright, and the Director may treat other uses as permitted when they are similar to the listed uses under the Standard Industrial Classification code. Conditional uses, reviewed under the conditional use articles, include bulk fuel stores, junkyards, and marijuana production and processing.
The Dalles Municipal Code, Title 10 (Land Use Ordinance), Article 5.090, I Industrial District
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Uses permitted outright, items 9 and 24; conditional uses list; district intent paragraph
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Resolution SIP-21-01: Determination of Approval for Strategic Investment Program, Google Data Center (Project 1)
Oregon Business Development Commission (Business Oregon)Tier 1 · Captured 2026-11-08 · Open the source - 2Special Resolution: Distribution of Local Community Service Fee under the Strategic Investment Program (Google projects, Wasco County)
Oregon Business Development Commission (Business Oregon)Tier 1 · Captured 2026-11-08 · Open the source - 3
- 4Special Ordinance No. 25-608: A Special Ordinance Accepting Title to Real Property Located near the Intersection of West 2nd Street and Snipes Street
City of The DallesTier 1 · Captured 2026-11-09 · Open the source - 5Resolution SIP-21-02: Determination of Approval for Strategic Investment Program, Google Data Center (Project 2)
Oregon Business Development Commission (Business Oregon)Tier 1 · Captured 2026-11-08 · Open the source - 6City Council Agenda Packet, Regular Meeting, October 25, 2021
City of The DallesTier 1 · Captured 2026-11-07 · Open the source - 7Public records order: Oregonian appeal of the City of The Dalles Exhibit C redactions (Infrastructure Agreement), February 10, 2023
Wasco County District AttorneyTier 1 · Captured 2026-11-09 · Open the source - 8Total City and Google Water Consumption (gal.), current as of January 21, 2026
City of The DallesTier 1 · Captured 2026-11-09 · Open the source - 9Board of Commissioners Regular Session Minutes, August 5, 2015
Wasco CountyTier 1 · Captured 2026-11-09 · Open the source - 10Resolution No. 24-030: A Resolution Establishing Budgetary Policy for the Appropriation of Strategic Investment Program Taxes and Revenues under the 2021 SIP Agreement with Design, LLC
City of The DallesTier 1 · Captured 2026-11-09 · Open the source - 11Enterprise Zone Tax Abatement Agreement (City of The Dalles, Wasco County, and Design, LLC), 2005
City of The DallesTier 1 · Captured 2026-11-09 · Open the source - 12Enterprise Zone Tax Abatement Agreement (City of The Dalles, Wasco County, and Design, LLC), 2013 (execution version)
City of The DallesTier 1 · Captured 2026-11-09 · Open the source - 13Board of Commissioners Special Session Minutes, September 24, 2013
Wasco CountyTier 1 · Captured 2026-11-07 · Open the source - 14Good day for journalism: The Dalles, Google abdicate in water fight with Oregonian
Columbia InsightTier 3 · Captured 2026-11-07 · Open the source - 15Proposed Budget Book FY2023-24, Enterprise Zone Funds
City of The DallesTier 1 · Captured 2026-11-07 · Open the source - 16City Council Agenda Packet, April 25, 2022
City of The DallesTier 1 · Captured 2026-11-07 · Open the source - 17Article 5.090, I Industrial District, The Dalles Land Use Ordinance
City of The Dalles, OregonTier 1 · Captured 2026-11-07 · Open the source - 18Wasco County Land Use and Development Ordinance (full text)
Wasco County, OregonTier 1 · Captured 2026-11-07 · Open the source - 19Northern Wasco County PUD presentation to the Governor's Data Center Advisory Committee
Northern Wasco County People's Utility DistrictTier 1 · Captured 2026-11-07 · Open the source - 20Preparing for the Future: Northern Wasco County PUD's Commitment to Smart and Equitable Growth
Northern Wasco County People's Utility DistrictTier 1 · Captured 2026-11-07 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page