Skip to content

Project File · Public records

Every public record we have for Google data center, Hunt Midwest Business Center (Kansas City)

Kansas City, Clay County, MissouriUnder constructionFirst public 2024Filing entity: Shenandoah Computing LLCLast checked Nov 8, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

2 of 2 records · showing power and utility only ·

2025

  • Utility proceedingDecidedFeb 11, 2025Kansas Corporation Commission

    Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)

    Establishes the Large Load Power Service (LLPS) rate plan for Evergy's Kansas companies under a unanimous settlement of Evergy, Commission Staff, the Citizens' Utility Ratepayer Board, the Data Center Coalition, Google, Sierra Club, NRDC, Kansas Industrial Consumers, and others. The plan applies to any new facility beginning service with a peak load forecast of 75 MW or more, and to existing customers expanding by 75 MW; the settlement lowered the threshold from the 100 MW Evergy proposed. Customers sign for a minimum of 12 years at full contract capacity after an optional ramp of up to five years (17 years in total), with automatic five-year extensions. The minimum monthly bill is 80 percent of contract demand regardless of use, and customers post collateral equal to two years of minimum monthly bills. Customers pay for transmission upgrades needed to serve them, and demand and energy rates are designed to cover Evergy's incremental cost of serving large loads, which Commission staff estimated puts LLPS rates 7 to 10 percent above existing industrial rates. Early termination requires 36 months' notice and an exit fee of the greater of the remaining term's minimum bills or 12 months. Four clean energy options, including a clean energy choice rider, are part of the plan.

    25-EKME-315-TAR

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    KCC news release of November 6, 2025 (the order: 75 MW threshold; 12-year term plus five-year ramp; 80 percent minimum bill; two years of collateral; incremental cost rates); Sierra Club release (threshold and term changes from the original proposal)

No date in the record(rules in force and undated records)

  • Utility proceedingDecidedNo date in the recordMissouri Public Service Commission

    In the matter of Evergy Metro, Inc. and Evergy Missouri West, Inc. large load tariffs (Large Load Power Service)

    Creates the Large Load Power Service (LLPS) rate class for Evergy's Missouri companies under Section 393.130.7, enacted by Senate Bill 4 (2025). Eligibility begins at 75 MW of new or expanded load, below the 100 MW figure in the statute. The Commission approved a non-unanimous global stipulation (Evergy, Ameren Missouri, Google, the Data Center Coalition, Nucor, Sierra Club, Renew Missouri, and others) and rejected the alternative design backed by Commission Staff and the Office of Public Counsel. Tariffs took effect March 9, 2026. The plan's terms, the same plan Evergy filed in Kansas, are a minimum bill of 80 percent of contract demand, a minimum term of 12 years after a ramp of up to five years, and collateral equal to two years of minimum bills. In Missouri proceedings, Google's rate design witness put the settled LLPS rates about 15 to 17 percent above standard large power rates.

    EO-2025-0154

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    ACT4MO analysis of the Report and Order (LLPS class; 75 MW threshold; stipulation approved over Staff and Public Counsel objections); Curry analysis (decided November 13, 2025; tariffs effective March 9, 2026; settled rates 15 to 17 percent above standard large power rates per Google's witness)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    News Release 11-6-25: KCC approves Large Load Power Service rate plan for Evergy
    Kansas Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Sierra Club Supports KCC Approved Plan to Protect Customers
    Sierra Club
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    'Fair Share' or Cross-Subsidy? PSC Staff Broke with Commissioners on Evergy's Data Center Tariff
    ACT4MO
    Tier 4 · Captured 2026-11-08 · Open the source
  4. 4
    What Evergy's Large-Load Tariff Means for Your Electric Bill
    Brian Curry (research analysis)
    Tier 3 · Captured 2026-11-08 · Open the source
  5. 5
    Google Announces $1 Billion Data Center in Kansas City, Missouri
    Missouri Partnership
    Tier 4 · Captured 2026-11-08 · Open the source
  6. 6
    Google Kansas City announcement as filed in Missouri PSC records
    Missouri Public Service Commission (EFIS)
    Tier 1 · Captured 2026-11-08 · Open the source
  7. 7
    Construction begins at Google's second data center campus in Kansas City, Missouri
    Data Center Dynamics
    Tier 3 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page