Project File · Public records

Every public record we have for Google Goodnight campus (Armstrong County)

Claude, Armstrong County, TexasUnder constructionFirst public 2025Filing entity: GN DC1, LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

3 of 9 records · showing power and utility only ·

2026

  • Utility commission decisionIssuedApr 23, 2026Public Utility Commission of Texas

    Public Utility Commission of Texas, Docket No. 58881 (Interchange item 105)

    Commission approved the net metering arrangement between GOODNIT1 and the Ensign Load under PURA Section 39.169, conditioned on full curtailment of the load within 30 minutes during transmission emergencies, a bar on the load participating in ERCOT or utility demand response, ancillary services, or emergency response programs, and the wind facility making its capacity available to ERCOT during emergencies

    Data center load phase 1:
    180 MW
    Colocated wind capacity:
    265.5 MW
    Data center load phase 2:
    85 MW
    Ensign texas sos filing number:
    806,176,907
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Order signed at Austin, Texas, April 23, 2026; Findings of Fact 1-51 and ordering paragraphs

  • Utility proceedingPending before the commissionFeb 19, 2026Public Utility Commission of Texas

    Joint Application of Comanche Peak Power Company LLC and Amazon Data Services, Inc. for Approval of a Net Metering Arrangement

    Net metering arrangement under PURA Sec. 39.916 pairing the Comanche Peak nuclear station with an Amazon Data Services data center load, inside ERCOT with Oncor as the interconnecting utility. Oncor’s October 2026 response to Commission Staff requests for information addressed evidence of SB 6 compliance; Order No. 11 (October 26, 2026) granted Oncor’s request for a decision on written submission. No terms are approved yet.

    Docket No. 59399

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Index of filings: joint application of February 19, 2026; item 151 (Oncor response to Staff RFI Q 1-19, October 2026); item 167 (Order No. 11 of October 26, 2026); item 213 (latest filing, November 5, 2026)

2025

  • Utility proceedingDecidedOct 24, 2025Public Utility Commission of Texas

    Application of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement

    Net metering arrangement under PURA Sec. 39.916 at a 265.5 MW point of interconnection: 180 MW of load available upon commercial operation and a further 85 MW within three years. The final order (April 23, 2026) approved the arrangement with conditions, which are binding on the applicants’ successors and assigns: the customer must fully curtail load within 30 minutes on ERCOT direction (automated where possible), may not participate in demand response programs or other ancillary services, the parties must report curtailments quarterly to ERCOT and Commission Staff for five years, and FGE must provide ERCOT ten days notice before maintenance or outages exceeding 5 MW.

    Docket No. 58881

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Final order signed April 23, 2026, pp. 2, 6-9 (265.5 MW point of interconnection; 180 MW and 85 MW phases; 30 minute curtailment and reporting conditions); index of filings (joint application of October 24, 2025; rehearing motions filed May 18, 2026)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Amended, Restated, and Consolidated Second Tax Abatement Agreement between Armstrong County, Texas and GN DC1, LLC
    Armstrong County, Texas (posted on the county website)
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Armstrong County Commissioners Court Minutes, November 12, 2024
    Armstrong County, Texas (posted on the county website)
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Plain Language Summary for New Source Review, Initial Application for Air Permit Number 182880 (Crusoe Energy Systems LLC, Goodnight Data Center, RN112229901)
    Texas Commission on Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Amended Notice of Receipt of Application and Intent to Obtain Air Permit (NORI), Proposed Air Quality Permit Number 182880, GHGPSDTX268, and PSDTX1698: Crusoe Energy Systems LLC, Goodnight Data Center
    Texas Commission on Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Amended, Restated, and Consolidated Tax Abatement Agreement between Armstrong County, Texas and GN DC1, LLC
    Armstrong County, Texas (posted on the county website)
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Order, Docket No. 58881: Application of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    PUCT Interchange filing index, Project or Docket No. 58881
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  8. 8
    PUCT Interchange filing index, Project or Docket No. 59399
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  9. 9
    Google announces new $40 billion investment in Texas
    Google (The Keyword, Google official blog)
    Tier 2 · Captured 2026-11-09 · Open the source
  10. 10
    Governor Abbott, Google Announce $40 Billion Investment In Texas
    Office of the Texas Governor
    Tier 1 · Captured 2026-11-09 · Open the source
  11. 11
    Data Center Locations: Armstrong County, Texas (in development)
    Google
    Tier 2 · Captured 2026-11-09 · Open the source
  12. 12
    Texas Jobs, Energy, Technology, and Innovation (JETI), Office of the Governor, Public Listing as of October 31, 2026
    Office of the Texas Governor
    Tier 1 · Captured 2026-11-09 · Open the source
  13. 13
    Armstrong County Commissioners Court page (court roster and posted court documents)
    Armstrong County, Texas
    Tier 1 · Captured 2026-11-09 · Open the source