8 of 8 records

2025

  • Zoning ruleIn effectDec 10, 2025Maricopa County

    Modernized Maricopa County Zoning Ordinance, data center provisions

    The modernized county zoning ordinance defines data centers and addresses them as an emerging technology use. Reporting on the adopted ordinance states that data centers are allowed in the IND-2 and IND-3 industrial districts, and land not zoned for the use must go through the county rezoning process. A county staff report for a February 2026 hearing states that data centers are a permitted use in the IND-2 district, while noting the ordinance does not specifically contemplate the use, which is why that project sought an overlay clarification.

    Maricopa County Zoning Ordinance (county ordinance P-18), text amendment TA25001

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    News release paragraphs on definitions for emerging technologies including data centers; staff report for cases CPA250009 and Z250027 (2026-02-11 hearing) on IND-2 permitted uses

  • Setback ruleIn effectJul 8, 2025Mesa

    Separation from residential districts, height cap, screening, parking, and sound studies for data centers

    Planning staff described a minimum separation of 400 feet from residential zoning districts or sensitive uses, measured from the data center property to the nearest residential property line, a maximum building height of 60 feet unless an exception is approved through a PAD, screening for mechanical equipment and substations, and parking at 1 space per 5,000 square feet for the first 200,000 square feet and 1 space per 10,000 square feet after that. Staff also described an initial sound study at the nearest residential property line, a post-occupancy sound study within 30 days of the certificate of occupancy, and annual sound studies for the first five years.

    Mesa City Code Section 11-31-36 (standards described by planning staff for Ordinance No. 5957, case PZ25057)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Staff presentation summaries for case PZ25057 (Planning and Zoning Board recommended approval 6-1 on 2025-06-25)

  • Development ruleIn effectJul 8, 2025Mesa

    Backup generator operation and testing notice, Data Centers

    An operator using backup generators must announce any routine operation, including testing, on its website and notify the City of Mesa Public Information Office at least 24 hours in advance. Outside a power outage or a utility demand response event, backup generators may run only between 9:00 a.m. and 5:00 p.m., Monday through Friday, excluding holidays. Systems that can run in parallel with the city electric utility or islanded are subject to a generator interconnection process and study at the operator's cost.

    Mesa City Code Section 11-31-36(G)(4)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Energy section, Example 4, quoting Section 11-31-36(G)(4)(a) to (e) verbatim

  • Development ruleIn effectJul 8, 2025Mesa

    Architectural features for data center buildings

    Every data center building must include at least five of twelve listed architectural features, such as overhangs, canopies, arcades, window shrouds, raised corniced parapets, tower elements, corner glass, sloped roof forms, murals, decorative grilles or screens, and architectural lighting. The standard aims at visual interest at entryways and areas the public sees.

    Mesa City Code Section 11-31-36(F)(5)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Design section quoting Section 11-31-36(F)(5), items i to xii

  • Development ruleIn effectJul 8, 2025Mesa

    Water Consumption and Thermal Management Report and Wastewater Report required with applications

    Every data center development application must include a Water Consumption and Thermal Management Report stating whether the facility is water-cooled or air-cooled, estimated water use in acre feet per year with a monthly breakdown, use in million gallons per day on a typical day and on the highest-use day, the highest instantaneous flow rate, whether high demand can shift to the city's low-demand periods, the number and size of water meters, and proof of a complete Sustainable Water Service Application. A Wastewater Report with proof of a complete Industrial User Survey under Title 8, Chapter 4 is also required.

    Mesa City Code Section 11-31-36(E)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Application requirements quoting Section 11-31-36(E), items 4 and 5

  • Zoning ruleIn effectJul 8, 2025Mesa

    Data Centers, Mesa Zoning Ordinance (Title 11)

    Data centers are allowed as an accessory use in commercial and employment districts and as a principal use in the General Industrial (GI) and Heavy Industrial (HI) districts, but a principal use data center is not allowed by right and needs approval of a Planned Area Development (PAD) Overlay District. A data center that serves only the on-site owner or tenant, does not lease services to third parties, and takes no more than 10 percent of the site's total gross floor area counts as an accessory use and is exempt from the section's standards.

    Mesa City Code Section 11-31-36 (added by Ordinance No. 5957)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Newsletter section on the data center ordinance; council minutes of 2025-07-08, item 8-h (Ordinance No. 5957); code text Section 11-31-36(A)(1) as quoted in the Lincoln Institute resource

2021

  • Recorded voteMay 17, 2021Mesa City Council

    Resolution No. 11680: Development Agreement and Sustainable Water Service Agreement with Redale LLC (City file 21-0552)

    6 yes, 1 no. David Luna (Councilmember): yes; Francisco Heredia (Councilmember): yes; Jennifer Duff (Vice Mayor): no; John Giles (Mayor): yes; Julie Spilsbury (Councilmember): yes; Kevin Thompson (Councilmember): yes; Mark Freeman (Councilmember): yes.

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Item 5-h, vote tabulation (motion by Freeman, seconded by Thompson)

No date in the record(rules in force and undated records)

  • Development ruleIn effectNo date in the recordMesa

    Offensive, Excessive, and Prohibited Noises, land use sound level limits

    Mesa's general noise chapter sets limiting sound levels by land use district in Table 1, measured as Leq: 60 dBA in residential districts, 65 dBA in commercial or business districts, and 70 dBA in agricultural and industrial districts. Noise exceeding the district level by 5 dBA or more counts as excessive noise under Section 6-12-3, and Section 6-12-4 sets measurement criteria.

    Mesa City Code Title 6, Chapter 12, Sections 6-12-1 to 6-12-6 (Table 1 in Section 6-12-5)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 6-12-5(A), Table 1, Limiting Sound Levels for Land Use Districts; Section 6-12-3; Section 6-12-4

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Power and utility

    Interconnection, large load rate classes, utility agreements, commission dockets. Usually held by: Electric utility and utility commission.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Board Approves Modernized Zoning Ordinance (news release, December 10, 2025)
    Maricopa County, Arizona
    Tier 1 · Captured 2026-11-07 · Open the source
  2. 2
    Arizona Technology Council article on the Mesa data center standards
    Arizona Technology Council
    Tier 3 · Captured 2026-11-07 · Open the source
  3. 3
    Examples of Local Zoning (resource quoting Mesa City Code Section 11-31-36 verbatim)
    Lincoln Institute of Land Policy
    Tier 2 · Captured 2026-11-07 · Open the source
  4. 4
    Development Community Newsletter, September 2025 (data center ordinance summary)
    City of Mesa, Arizona
    Tier 1 · Captured 2026-11-07 · Open the source
  5. 5
    Mesa, Arizona noise ordinance, Title 6, Chapter 12
    Noise Pollution Clearinghouse (law library copy of City of Mesa code text)
    Tier 2 · Captured 2026-11-07 · Open the source
  6. 6
    Council Minutes, Regular Council Meeting, May 17, 2021
    City of Mesa, Office of the City Clerk
    Tier 1 · Captured 2026-11-08 · Open the source
  7. 7
    Hyperlocal to Hyperscale Data Centers
    EdgeConneX, Inc.
    Tier 2 · Captured 2026-11-09 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page