Every public record we have for Digital Realty ORD10 (350 East Cermak)
Chicago, Cook County, IllinoisOperatingLast checked Nov 14, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
2 of 2 records
2025
Utility proceedingDecidedJun 23, 2025Illinois Commerce Commission
Commonwealth Edison Company, changes to new service requests for large demand project applicants or customers and revisions to Rider DE
The tariffs define a class of Large Demand Project Applicants or Customers (LDPACs), in practice data centers, requesting 50 MW or more. The Commission approved ComEd's changes in March 2026, replacing a flat $1 million deposit with a scaled refundable deposit: $1 million for projects of 50 to 200 MW plus $500,000 for each additional 100 MW, with a letter of credit from a U.S. financial institution also required where the deposit would exceed $2 million, protecting the deposit if a project is canceled or abandoned. The new structure does not apply to data centers already on the grid. The order also directed a docketed investigation into stronger ratepayer protections (Docket 26-0364) and a ComEd annual compliance filing. The order records more than 75 large load projects in ComEd's pipeline with combined maximum demand over 28,000 MW, above its all-time system peak.
25-0677 / 25-0679 (consolidated)
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
ICC press release of March 20, 2026 (approval; 50 MW class; deposit protection; 75 applications; investigation directed by April 23, 2026); Capitol News Illinois, March 20, 2026 (deposit scale: $1 million for 50-200 MW plus $500,000 per additional 100 MW; prior flat $1 million)
No date in the record(rules in force and undated records)
Utility proceedingPending before the commissionNo date in the recordIllinois Commerce Commission
Investigation of possible ratepayer protections and cost recovery mechanisms for servicing large demand project applicants or customers of Commonwealth Edison Company
Investigation opened on the Commission's own motion under its March 2026 order in Dockets 25-0677/25-0679, which directed initiation by April 23, 2026 and completion within eight months. Advocate testimony filed in the docket (consultant James Fine, for the Citizens Utility Board and allied groups, October 2026) analyzed 30 ComEd large load projects already interconnected or requesting service from 2021 through 2031 and put their transmission and distribution connection cost above $3 billion against about $721 million in deposits and advance commitments, under 25 percent; ComEd disputes that analysis and points to transmission security agreements and letters of credit.
26-0364
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
Docket caption in the verified petition to intervene filed in Docket 26-0364 (docketed April 29, 2026, on the Commission's docket system); ICC press release of March 20, 2026 (investigation directed); CUB release of October 22, 2026 (Fine testimony figures)
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Land and zoning rules
Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Environmental permits
Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Votes and minutes
Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
Illinois Commerce CommissionTier 1 · Captured 2026-11-08 · Open the source - 2Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
Capitol News IllinoisTier 3 · Captured 2026-11-08 · Open the source - 3Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
Illinois Commerce Commission (docket document)Tier 1 · Captured 2026-11-08 · Open the source - 4ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
Citizens Utility BoardTier 4 · Captured 2026-11-08 · Open the source - 5ORD10 Data Center | 350 East Cermak | Digital Realty
Digital RealtyTier 4 · Captured 2026-11-09 · Open the source - 6EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page