Every public record we have for Microsoft Corp DCS - AVC09 Datacenter

La Crosse, Mecklenburg County, VirginiaStage not knownFirst public 2025Filing entity: Microsoft Corp DCS - AVC09 DatacenterLast checked Nov 14, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

6 of 9 records · showing land and zoning rules only ·

2026

  • Development ruleIn effectMay 11, 2026Mecklenburg County

    Data center noise limit of 70 dBA at the property line, with sound studies on demand

    Noise from all activities at a data center development may not exceed 70 dBA measured at the property line shared with non data center uses. The limit does not apply to demolition work, to sudden unforeseen events that require emergency vehicles or temporary emergency generator use, or to generator testing inside the allowed testing window. The Zoning Administrator may require a sound study at any time, due within 15 days and taken during peak cooling operations, and the operator must act at once to comply if the study shows an exceedance.

    Mecklenburg County Zoning Ordinance (2026), Section 7.1-7.4

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 7.1-7 Data Center, subsection 4 (Noise Standards), ordinance pp. 116-118 of the draft

  • Zoning ruleIn effectMay 11, 2026Mecklenburg County

    Data center is a special exception use, not a by right use

    In the county use table, Data center is listed as SE, meaning a special exception permit is required, in two district columns, and the supplemental standards at Section 7.1-7 are written around that special exception process. Data center does not appear as a permitted by right use in the table rows read. The table text extraction jumbles column order, so the two districts carrying the SE marking are not named here; the M-1 Industrial district is the district applied to the Boydton campus area.

    Mecklenburg County Zoning Ordinance (2026), Section 6.4-4 Use Table, Industrial Uses

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Use Table, Industrial Uses rows, "Data center SE SE"; district columns A-1, A-C, R-1, R-2, R-3, PUD, MU1, M-1

  • Development ruleIn effectMay 11, 2026Mecklenburg County

    Extra application studies for data centers that are high energy use facilities

    A data center that qualifies as a high energy use facility must add two items to its special exception application: an acoustical site assessment covering homes and schools within 500 feet of the property line, and a formal statement from the electric utility on substations and transmission voltage needed to serve the site. County staff may also require a site impact assessment covering water use and water sources, prime farmland, forest cover loss, and visibility from parks and historic sites within a half mile.

    Mecklenburg County Zoning Ordinance (2026), Section 7.1-7.5

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 7.1-7 Data Center, subsection 5 (Special Exception Permit Application Requirements and Review Criteria), ordinance pp. 117-118 of the draft

  • Development ruleIn effectMay 11, 2026Mecklenburg County

    Data center buffers, fencing, and equipment screening standards

    Data center sites must be buffered from public roadways and from natural and managed resource areas such as parks, wildlife areas, forestland, and timberland, using at least a Buffer Type A planting, with walls, fences, or berms allowed only as a supplement to landscaping. Chain link fencing visible from a street is prohibited, barbed wire and razor wire may not be visible from the public right of way or nearby homes, and electrical substations and mechanical equipment must be screened under the landscaping and screening section.

    Mecklenburg County Zoning Ordinance (2026), Section 7.1-7.C

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 7.1-7 Data Center, subsection C (Site Design and Layout Standards), ordinance pp. 116-117 of the draft

  • Development ruleIn effectMay 11, 2026Mecklenburg County

    Generator testing window and sound attenuating enclosures for data centers

    Generator testing at a data center is covered by the 70 dBA property line limit only when it runs between 10:00 a.m. and 4:00 p.m., unless the Department of Environmental Quality requires testing outside that window. All generators must be housed in sound attenuating enclosures or use other sound mitigation the Zoning Administrator approves.

    Mecklenburg County Zoning Ordinance (2026), Section 7.1-7.4.a.iii and Section 7.1-7.4.b

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Section 7.1-7 Data Center, subsection 4.a.iii and 4.b, ordinance p. 117 of the draft

2020

  • Zoning ruleIn effectAug 10, 2020Mecklenburg County

    Rezoning of about 646 acres near Boydton from agriculture to M-1 industrial for data center expansion

    The Board of Supervisors rezoned two tracts near the existing Microsoft data center in Boydton from agriculture to M-1 industrial to allow future data center expansion. One tract of 310.83 acres was owned by the Mecklenburg County Industrial Development Authority and the other, 335.38 acres, by Microsoft, near Old Cox and Ridge Roads.

    Board of Supervisors rezoning action of 2020-08-10 (agriculture to M-1 industrial; case numbers not stated in the sources read)

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Article text reporting the 2020-08-10 Board of Supervisors vote (unanimous)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Power and utility

    Interconnection, large load rate classes, utility agreements, commission dockets. Usually held by: Electric utility and utility commission.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Issued Air Permits for Data Centers, as of Oct. 26, 2026
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source · Archived copy
  2. 2
    Mecklenburg County Planning Commission agenda packet, March 19, 2026 (includes Zoning Ordinance Draft 3-3-2026)
    Mecklenburg County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  3. 3
    Mecklenburg County rezones near Microsoft site
    SoVaNOW (The News & Record and The Mecklenburg Sun)
    Tier 3 · Captured 2026-11-07 · Open the source
  4. 4
    Board of Supervisors Minutes, August 10, 2020
    Mecklenburg County
    Tier 1 · Captured 2026-11-07 · Open the source
  5. 5
    Stationary Source Permit to Construct and Operate, Microsoft Corporation, AVC09 Datacenter, Registration No. 52973
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-13 · Open the source