Project File · Public records
Every public record we have for Crusoe Abilene AI factory campus for Microsoft
Abilene, Taylor County, TexasUnder constructionFirst public 2026Last checked Nov 13, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
4 of 16 records · showing land and zoning rules only ·
2025
Setback ruleProposedDec 18, 2025Abilene
Adopted 200-foot open-space buffer for the data center campus district
Ordinance 100-2025 requires a 200-foot buffer, designated on the district exhibit map, to be maintained as open space with all existing vegetation kept. Ordinance 56-2025 replaced the buffer map (Exhibit D) with a revised one (Exhibit E). This is an adopted district condition, not just a staff recommendation as first staged.
PDD-181 conditions, Ordinance 100-2025 Exhibit A; buffer map amended by Ordinance 56-2025
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Ordinance 100-2025 Exhibit A items (6)-(7); Ordinance 56-2025 Exhibit A
Zoning ruleIn effectDec 18, 2025Abilene
Data center campus zoned through Planned Development District 181
The Land Development Code use matrix names no data center use, so the Crusoe and Lancium campus runs through its own district ordinance. PDD-181, created by Ordinance 25-2023, has Light Industrial as its base district, and Ordinance 100-2025 permits Data Center: High Performance Computing and Data Center: Bitcoin Mining by right anywhere in the district, under Light Industrial development standards.
Planned Development District 181 (PDD-181), created by Ordinance No. 25-2023; third amendment Ordinance 100-2025
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Ordinance 100-2025 Exhibit C (permitted uses); Land Development Code Sections 2.3.4.5 and 2.4.2.1 (Municode)
No date in the record(rules in force and undated records)
Development ruleIn effectNo date in the recordAbilene
Maximum permissible octave band decibel limits at the bounding property line
At no point at the bounding property line of any use may the sound pressure level exceed the octave band limits in Table 4-3, which run from 86 decibels in the lowest band down to 53 decibels in the highest band, with a limit of 65 decibels on the A scale for daytime. Nighttime levels take a 7-decibel deduction, and the code exempts construction and maintenance noise between 7 a.m. and 9 p.m.
Abilene Land Development Code Section 4.2.9.2, Table 4-3
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Land Development Code Section 4.2.9.2(a), Table 4-3 (Municode)
Development ruleIn effectNo date in the recordAbilene
General prohibition on unreasonable noise (no decibel limit)
Section 20-1 declares unlawful any unreasonable loud, disturbing, unnecessary noise that causes material distress, discomfort or injury to persons of ordinary sensibility in the immediate vicinity, and any noise whose character, intensity and duration substantially interferes with the comfort and enjoyment of private homes. It sets no decibel limit; the numeric limits are in the Land Development Code, Section 4.2.9.2.
Abilene Code of Ordinances Section 20-1 (Chapter 20, Offenses)
Draft research, not yet verifiedLast checked Nov 7, 2026Where it says this
Code of Ordinances Section 20-1(a)-(b) (Municode)
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Power and utility
Interconnection, large load rate classes, utility agreements, commission dockets. Usually held by: Electric utility and utility commission.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1The Totally Easy Agenda: Abilene City Council - December 18, 2025
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 2The Totally Easy Agenda: Abilene City Council - December 4, 2025
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 3TABS Project Details: Abilene Building 9, Building 9 Core & Shell (CS), TABS2026008297
Texas Department of Licensing and RegulationTier 1 · Captured 2026-11-09 · Open the source - 4TABS Project Details: Abilene Building 10, Building 10 Core & Shell (CS), TABS2026008318
Texas Department of Licensing and RegulationTier 1 · Captured 2026-11-09 · Open the source - 5Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure (2026-03-27)
CrusoeTier 4 · Captured 2026-11-08 · Open the source - 6Chapter 312 Tax Abatement Agreements detail file (registry download), last updated 2026-10-10
Texas Comptroller of Public AccountsTier 1 · Captured 2026-11-09 · Open the source - 7TABS Project Details: Abilene Building 10, Building 10 Tenant Improvement (TI), TABS2026008329
Texas Department of Licensing and RegulationTier 1 · Captured 2026-11-09 · Open the source - 8Plain Language Summary for New Source Review (NSR), Initial Application for Air New Source Review Permit Numbers 182126, GHGPSDTX263 and PSDTX1688, Longhorn Data Center (RN112029061)
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 9Notice of Receipt of Application and Intent to Obtain Air Permit (NORI), Proposed Air Quality Permit Numbers 182126, PSDTX1688, and GHGPSDTX263, Longhorn Data Center Buildings 9 and 10
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 10Notice of Application and Preliminary Decision for Air Quality Permits, Proposed Air Quality Permit Numbers 182126, PSDTX1688, and GHGPSDTX263
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 11TABS Project Details: Abilene Building 9, Administration and Warehouse Buildings, TABS2026023929
Texas Department of Licensing and RegulationTier 1 · Captured 2026-11-09 · Open the source - 12TABS Project Details: Abilene Building 9, Building 9 Tenant Improvement (TI), TABS2026008308
Texas Department of Licensing and RegulationTier 1 · Captured 2026-11-09 · Open the source - 13Abilene Ordinance 100-2025, 3rd Amendment to Planned Development District 181
City of Abilene (Municode MuniDocs)Tier 1 · Captured 2026-11-08 · Open the source - 14Abilene Ordinance 56-2025, PDD-181 buffer exhibit amendment
City of Abilene (Municode MuniDocs)Tier 1 · Captured 2026-11-08 · Open the source - 15Abilene Land Development Code, Section 4.2.9.2, Performance Standards Regulating Noise (Table 4-3)
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 16Abilene Code of Ordinances, Section 20-1, Noise control generally
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 17Abilene Land Development Code, Section 2.3.4.5, Planned Development (PD) District
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 18Commissioners Court Minutes, December 16, 2025
Taylor CountyTier 1 · Captured 2026-11-09 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page