3 of 3 records

2026

  • Utility proceedingPending before the commissionApr 2, 2026Colorado Public Utilities Commission

    Public Service Company of Colorado (Xcel Energy), Large Load Tariff: proposed Schedule TL (Large Load Service) and optional Schedule CTT (Contract Tariff Template)

    Xcel Energy (Public Service Company of Colorado) filed its Large Load Tariff on April 2, 2026 for customers requiring 50 MW or more of peak demand; customers between 20 and 50 MW may also be subject to the terms. Proposed Schedule TL requires the customer to pay all transmission, substation, interconnection, and generation costs its load causes, sign a contract of 15 years or more, make minimum monthly payments, and pay early-termination charges. An optional Schedule CTT, modeled on NV Energy's, would let a customer self-generate at least 20 percent of its annual energy while the utility provides shaping, balancing, and backup. Hearings ran October 21 to 28, 2026 and the Commission's decision was still to be determined when the Commission's case page was read on November 8, 2026.

    26AL-0137E

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Commission Electric Rate Cases page, entry for Proceeding No. 26AL-0137E, as read firsthand by the Q5 WG3 sweep on 2026-11-08 (the source row's notes carry the filing date, the 50 MW test, and the terms). The page returns HTTP 403 to this conversion pass's fetches (two attempts, 2026-11-09), so the row rests on the WG3 reading of the Commission's own page.

2024

  • Utility proceedingDecidedOct 15, 2024Colorado Public Utilities Commission

    Public Service Company of Colorado 2024 Just Transition Solicitation (Electric Resource Plan), Phase 1

    Public Service's 2024 Just Transition Solicitation is its Electric Resource Plan for resource acquisitions from 2029 to 2033, including replacement of Pueblo Unit 3, which retires by January 1, 2031. The Phase I Decision (Decision No. C25-0747, issued November 6, 2025) approved the solicitation with modifications, on a plan that could result in acquisition of over 6,000 MW of new generation, and established a more flexible acquisition process to respond to new loads in a timely way while protecting existing ratepayers if large customer loads do not materialize but generation has been built to serve them. Phase II, covering portfolio selection and contracting, continues in the same proceeding. All figures are plan-level resource and load figures for the utility system, never the capacity of any single project.

    24A-0442E

    Draft research, not yet verifiedLast checked Nov 10, 2026
    Where it says this

    Commission's 2025 JTS Written Order summary (Proceeding No. 24A-0442E; Written Decision issued Nov. 6, 2025) and the Commission's press release on completion of Phase 1 deliberations

2023

  • Utility proceedingDecidedJun 23, 2023Colorado Public Utilities Commission

    Public Service Company of Colorado application for approval of a non-standard economic development rate (EDR) contract with QTS Aurora Infrastructure, LLC, and for a determination on a certificate of public convenience and necessity (CPCN) for customer-funded transmission facilities

    QTS Aurora Infrastructure, LLC committed to take electric service for a minimum of ten years for its planned Aurora data center campus, which Public Service stated was expected to reach an average estimated total load of approximately 160 MW at full capacity, in exchange for a percentage discount off standard base rates under Schedule Transmission General (TG). QTS pays all costs of approximately 1.4 miles of dedicated double-circuit 230 kV transmission facilities connecting the campus to the Public Service system. Decision No. C24-0378 (adopted May 15, 2024, mailed June 13, 2024) denied the exceptions filed by Commission Trial Staff, the Colorado Office of the Utility Consumer Advocate, and Colorado Energy Consumers; adopted Administrative Law Judge Recommended Decision No. R24-0168 with modifications; found QTS eligible for an economic development rate; approved the EDR electric service agreement; and granted a CPCN for the QTS transmission facilities. The 160 MW figure is the utility's estimate of one customer's campus load as stated in the proceeding, not a tariff threshold.

    23A-0330E

    Draft research, not yet verifiedLast checked Nov 10, 2026
    Where it says this

    Decision No. C24-0378, paragraphs 1-5 and the Recommended Decision summary (QTS eligibility for an economic development rate)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Electric Rate Cases (Xcel Large Load Tariff, Proceeding No. 26AL-0137E)
    Colorado Public Utilities Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Decision No. C24-0378, Proceeding No. 23A-0330E (QTS non-standard EDR contract)
    Colorado Public Utilities Commission
    Tier 1 · Captured 2026-11-10 · Open the source
  3. 3
    2025 JTS Written Order summary, Proceeding No. 24A-0442E
    Colorado Public Utilities Commission
    Tier 1 · Captured 2026-11-10 · Open the source
  4. 4
    Stonepeak Forms Joint Venture with American Tower to Construct a New Data Center in Denver, Colorado
    Business Wire (issuer: Stonepeak)
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    CoreSite DE3 Denver topping out release (4900 Race Street)
    Business Wire (issuer: CoreSite)
    Tier 4 · Captured 2026-11-08 · Open the source
  6. 6
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source
  7. 7
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page