Skip to content

Project File · Public records

Every public record we have for Chirisa Volo Data Center

Volo, Lake County, IllinoisOperatingFirst public 2023Filing entity: Chirisa Volo LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

3 of 3 records

2025

  • Utility proceedingDecidedJun 23, 2025Illinois Commerce Commission

    Commonwealth Edison Company, changes to new service requests for large demand project applicants or customers and revisions to Rider DE

    The tariffs define a class of Large Demand Project Applicants or Customers (LDPACs), in practice data centers, requesting 50 MW or more. The Commission approved ComEd's changes in March 2026, replacing a flat $1 million deposit with a scaled refundable deposit: $1 million for projects of 50 to 200 MW plus $500,000 for each additional 100 MW, with a letter of credit from a U.S. financial institution also required where the deposit would exceed $2 million, protecting the deposit if a project is canceled or abandoned. The new structure does not apply to data centers already on the grid. The order also directed a docketed investigation into stronger ratepayer protections (Docket 26-0364) and a ComEd annual compliance filing. The order records more than 75 large load projects in ComEd's pipeline with combined maximum demand over 28,000 MW, above its all-time system peak.

    25-0677 / 25-0679 (consolidated)

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    ICC press release of March 20, 2026 (approval; 50 MW class; deposit protection; 75 applications; investigation directed by April 23, 2026); Capitol News Illinois, March 20, 2026 (deposit scale: $1 million for 50-200 MW plus $500,000 per additional 100 MW; prior flat $1 million)

2023

  • Tax agreement2023Volo

    Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table). Program eligibility as published by DCEO: at least $250 million in capital investment by the owner/operator and its tenants, at least 20 new full-time jobs at 120 percent or more of the county average wage, and a carbon-neutral or comparable green building standard within two years of the facility being placed in service.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    MOU table, p. 7 (company as filed, 2023, site municipality, investment commitment, estimated value of tax benefits, new jobs, underserved flag)

No date in the record(rules in force and undated records)

  • Utility proceedingPending before the commissionNo date in the recordIllinois Commerce Commission

    Investigation of possible ratepayer protections and cost recovery mechanisms for servicing large demand project applicants or customers of Commonwealth Edison Company

    Investigation opened on the Commission's own motion under its March 2026 order in Dockets 25-0677/25-0679, which directed initiation by April 23, 2026 and completion within eight months. Advocate testimony filed in the docket (consultant James Fine, for the Citizens Utility Board and allied groups, October 2026) analyzed 30 ComEd large load projects already interconnected or requesting service from 2021 through 2031 and put their transmission and distribution connection cost above $3 billion against about $721 million in deposits and advance commitments, under 25 percent; ComEd disputes that analysis and points to transmission security agreements and letters of credit.

    26-0364

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Docket caption in the verified petition to intervene filed in Docket 26-0364 (docketed April 29, 2026, on the Commission's docket system); ICC press release of March 20, 2026 (investigation directed); CUB release of October 22, 2026 (Fine testimony figures)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Environmental permits

    Air permits for backup generators, stormwater, wastewater, wetlands. Usually held by: State environmental agency.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Votes and minutes

    Council and board votes, resolutions, hearing minutes. Usually held by: Each public body's agendas and minutes.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
    Illinois Commerce Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
    Capitol News Illinois
    Tier 3 · Captured 2026-11-08 · Open the source
  4. 4
    Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
    Illinois Commerce Commission (docket document)
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
    Citizens Utility Board
    Tier 4 · Captured 2026-11-08 · Open the source
  6. 6
    Bloom Energy and CoreWeave Partner to Revolutionize AI Data Center Power Solutions
    Bloom Energy
    Tier 4 · Captured 2026-11-09 · Open the source
  7. 7
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page